Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Chatra South)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
20/12/2021
|
The proposal was examined and found deficient in many respects. Many essential documents were also found lacking in the proposal. All the observed deficiencies and shortcomings were listed and sent to the user agency for compliance vide DFO letter no. 2918 dated 18.12.2021
|
|
2
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Chatra South)
|
26/03/2022
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Chatra South)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
08/04/2022
|
The user agency has not submitted the hard copy of the proposal which is necessary to examine and then to the necessary works/extent and these for the online proposal having found it in sufficient is being return to user agency vide DFO letter no. 675 dated 06.04.2022
|
|
4
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Chatra South)
|
10/07/2022
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Chatra South)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
02/08/2022
|
The proposal has been found without having the NOC and other certificates in regard of GMJJ land from DC Hazaribagh and therefore the proposal has been returned to the user agency vide DFO letter no. 1602 dated 02.08.2022 for re submission of it with complete and all required documents.
|
|
6
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Chatra South)
|
01/09/2022
|
The correction have been made as per the instruction received
|
|
7
|
CF (Chatra)
|
EDS
|
DFO (Chatra South)
|
08/10/2022
|
Proposed CA land 802 Ha but 82 Ha MDF category which may be not be suitable for afforestation
|
|
8
|
DFO (Chatra South)
|
REPLY
|
CF (Chatra)
|
17/10/2022
|
The defects communicated to this office from Conservator of Forests, Territorial Circle, Chatra has been removed and the equivalent amount of suitable CA land along with maps and other relevant documents have been sent to CF Chatra through online mode.
|
|
9
|
Nodal Officer
|
EDS
|
CF (Chatra)
|
09/11/2022
|
On uploaded KML forest area is 725.8 ha whereas applied forest area is 699.3618 ha which mismatches. This needs to be corrected.
|
|
10
|
Nodal Officer
|
EDS
|
CF (Hazaribagh)
|
09/11/2022
|
On uploaded KML forest area is 725.8 ha whereas applied forest area is 699.3618 ha which mismatches. This needs to be corrected.
|
|
11
|
CF (Chatra)
|
EDS
|
DFO (Chatra South)
|
09/11/2022
|
On uploaded KML forest area is 725.8 ha whereas applied forest area is 699.3618 ha which mismatches. This needs to be corrected.
|
|
12
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
09/11/2022
|
On uploaded KML forest area is 725.8 ha whereas applied forest area is 699.3618 ha which mismatches. This needs to be corrected.
|
|
13
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
11/11/2022
|
Correction has been made on uploaded KML of forest area which is 699.3618 ha matching with Applied area.
|
|
14
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
11/11/2022
|
On uploaded KML forest area is 725.8 ha whereas applied forest area is 699.3618 ha which mismatches. This needs to be corrected.
|
|
15
|
DFO (Hazaribagh West)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
11/11/2022
|
Please take note to the query raised by CF.
|
|
16
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Hazaribagh West)
|
16/11/2022
|
The correction have been made as per the instruction received
|
|
17
|
DFO (Chatra South)
|
REPLY
|
CF (Chatra)
|
19/11/2022
|
Corrected KML Files of the forest land to be diverted and as mentioned in the proposal was received online from the user agency and the same was sent to CF Chatra by online mode for upward necessary action.
|
|
18
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
19/11/2022
|
Corrected KML Files of the forest land to be diverted and as
mentioned in the proposal was received online from the user
agency and the same was sent to CF Hazaribagh by online mode
for upward necessary action.
|
|
19
|
CF (Chatra)
|
REPLY
|
Nodal Officer
|
19/11/2022
|
Corrected KML Files of the forest land to be diverted and as mentioned in the proposal was received online from the DFO Chatra South Forest Division and the same was sent to ED Nodal by online mode for upward necessary action.
|
|
20
|
CF (Hazaribagh)
|
REPLY
|
Nodal Officer
|
19/11/2022
|
Correction has been made on uploaded KML of forest area which is 699.3618 ha matching with Applied area.
|
|
21
|
State secretary
|
EDS
|
Nodal Officer
|
02/01/2023
|
Reply on three points has been sought.
|
|
22
|
Nodal Officer
|
EDS
|
CF (Chatra)
|
03/01/2023
|
Please take note on EDS by GOJ
|
|
23
|
Nodal Officer
|
EDS
|
CF (Hazaribagh)
|
03/01/2023
|
Please take note on EDS by GOJ
|
|
24
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
06/01/2023
|
Please take note on EDS by GOJ
|
|
25
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
27/01/2023
|
The correction have been made as per the instruction received
|
|
26
|
CF (Chatra)
|
EDS
|
DFO (Chatra South)
|
27/01/2023
|
Please take note on EDS by GOJ
|
|
27
|
DFO (Chatra South)
|
REPLY
|
CF (Chatra)
|
27/01/2023
|
The desired report in compliance to the queries made by the state government has been sent to CF Chatra vide DFO Letter No. 244 dated 24.01.2023
|
|
28
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
01/02/2023
|
Please take note on EDS by CF
|
|
29
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
02/02/2023
|
The correction have been made as per the instruction received.
|
|
30
|
CF (Hazaribagh)
|
REPLY
|
Nodal Officer
|
06/02/2023
|
The correction have been made as per the instruction received
|
|
31
|
CF (Chatra)
|
REPLY
|
Nodal Officer
|
09/02/2023
|
Compliance report of queries raised by GOJ
|
|
32
|
Nodal Officer
|
REPLY
|
State secretary
|
10/03/2023
|
EDS Reply
|
|
33
|
Head Office
|
EDS
|
State secretary
|
22/09/2023
|
EDS
|
|
34
|
State secretary
|
EDS
|
Nodal Officer
|
20/10/2023
|
Reply quiry letter dated-19.10.2023 has been sought.
|
|
35
|
Nodal Officer
|
EDS
|
CF (Chatra)
|
31/10/2023
|
Please take note on EDS by MoEF&CC Delhi
|
|
36
|
Nodal Officer
|
EDS
|
CF (Hazaribagh)
|
31/10/2023
|
Please take note on EDS by MoEF&CC Delhi
|
|
37
|
CF (Chatra)
|
EDS
|
DFO (Chatra South)
|
03/11/2023
|
Please take note on EDS by MoEF&CC Delhi
|
|
38
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
03/11/2023
|
Please take note on EDS by MoEF&CC Delhi
|
|
39
|
DFO (Chatra South)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
04/11/2023
|
The desired report in compliance to the queries made by the PCCF-cum-ED has been sent to CF Chatra vide DFO Memo No. 2651 dated 03.11.2023
|
|
40
|
DFO (Hazaribagh West)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
08/11/2023
|
Please take note on EDS by MoEF&CC Delhi
|
|
41
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Chatra South)
|
19/12/2023
|
The correction have been made as per the instruction received
|
|
42
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Hazaribagh West)
|
19/12/2023
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Hazaribagh West)
|
EDS
|
User Agency (po.chandragupta@coalindia.in)
|
09/01/2024
|
KML and DGPS map of forest land proposed to be diverted verified and found that the KML Patch-1 in area mismatch with DGPS map. Please verify and upload corrected KML file.
|
|
44
|
User Agency (po.chandragupta@coalindia.in)
|
REPLY
|
DFO (Hazaribagh West)
|
09/01/2024
|
The correction have been made as per the instruction received
|
|
45
|
DFO (Chatra South)
|
REPLY
|
CF (Chatra)
|
22/01/2024
|
The desired report in compliance to the queries made by the Central government has been sent to CF Chatra vide DFO Letter No. 166 dated 22.01.2024
|
|
46
|
CF (Chatra)
|
EDS
|
DFO (Chatra South)
|
23/01/2024
|
Please take note on EDS by CF, Chatra
|
|
47
|
DFO (Chatra South)
|
REPLY
|
CF (Chatra)
|
27/01/2024
|
The correction have been made as per the instruction received.
|
|
48
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
27/01/2024
|
The correction have been made as per the instruction received
|
|
49
|
CF (Chatra)
|
REPLY
|
Nodal Officer
|
31/01/2024
|
The correction have been made as per the instruction received.
|
|
50
|
CF (Hazaribagh)
|
EDS
|
DFO (Hazaribagh West)
|
05/02/2024
|
Please take note query raised by CF
|
|
51
|
DFO (Hazaribagh West)
|
REPLY
|
CF (Hazaribagh)
|
06/02/2024
|
The correction have been made as per the instruction received.
|
|
52
|
CF (Hazaribagh)
|
REPLY
|
Nodal Officer
|
06/02/2024
|
Compliance report of EDS raised by MoEF&CC, New Delhi
|
|
53
|
Nodal Officer
|
REPLY
|
State secretary
|
19/02/2024
|
EDS Reply
|
|
54
|
State secretary
|
REPLY
|
Head Office
|
26/02/2024
|
Reply of query is being sent.
|
|