Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
25/02/2020
|
There are lot of short comings observed from the entire record uploaded online. As such you are directed to send hard copy so that the case be examined and processed accordingly.
|
|
2
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
13/10/2020
|
The case is the returned herewith the remarks that reply to the observations is uncomplete. Please re-submit after attending the observation point wise
|
|
3
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
09/12/2020
|
The correction have been made as per the instruction received
|
|
4
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
18/12/2020
|
The EDS has been attended and the case is recommended for approval
|
|
5
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
14/01/2021
|
EDS is enclsoed
|
|
6
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
30/01/2021
|
Observations raised by CF Rampur on 05.01.2021 are dully attended and recommended for further action please.
|
|
7
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
18/02/2021
|
EDS
|
|
8
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
20/02/2021
|
Observations EDS
|
|
9
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
25/02/2021
|
pl attend the observations.
|
|
10
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
27/08/2021
|
The correction have been made as per the instruction received
|
|
11
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
28/08/2021
|
Upload complete PDF of hard copy
|
|
12
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
28/08/2021
|
The correction have been made as per the instruction received
|
|
13
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
09/10/2021
|
eds
|
|
14
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
09/10/2021
|
The correction have been made as per the instruction received
|
|
15
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
09/10/2021
|
Observation has been attended
|
|
16
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
08/11/2021
|
EDS enclosed
|
|
17
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
17/11/2021
|
EDS
|
|
18
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
20/11/2021
|
EDS
|
|
19
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
24/11/2021
|
Kindly attend the observations.
|
|
20
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
11/12/2021
|
The correction have been made as per the instruction received
|
|
21
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
27/12/2021
|
EDS
|
|
22
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
27/12/2021
|
The correction have been made as per the instruction received
|
|
23
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
01/01/2022
|
EDS
|
|
24
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
01/01/2022
|
The correction have been made as per the instruction received
|
|
25
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
06/01/2022
|
eds
|
|
26
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
06/01/2022
|
The correction have been made as per the instruction received
|
|
27
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
12/01/2022
|
eds
|
|
28
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
12/01/2022
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
12/01/2022
|
EDS Reply
|
|
30
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
05/02/2022
|
The returned with remarks that online observations /shortcomings be attended as discussed with the User Agency
|
|
31
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
14/02/2022
|
EDS
|
|
32
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
14/02/2022
|
The correction have been made as per the instruction received
|
|
33
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
14/02/2022
|
Observation has been attended
|
|
34
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
18/02/2022
|
EDS reply
|
|
35
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
05/03/2022
|
EDS
|
|
36
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
25/03/2022
|
EDS
|
|
37
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
01/04/2022
|
attend the observation raised by CCF Rampur
|
|
38
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
01/04/2022
|
The correction have been made as per the instruction received
|
|
39
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
10/04/2022
|
EDS
|
|
40
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
10/04/2022
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
10/04/2022
|
EDS
|
|
42
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
10/04/2022
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
10/04/2022
|
EDS Reply
|
|
44
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
13/04/2022
|
Returned with the remarks that reply to the observation No.2 has not been attended properly. Please see to it and make necessary correction as discussed
|
|
45
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
23/04/2022
|
The necessary correction have been made in part-II
|
|
46
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
07/05/2022
|
The case is returned with the remarks that legal status of the land in the online Part-II is mentioned as Charagah Drakhtan whereas in hard copy of part-II pleases in the proposal folders it is mentioned as UPF. Pleas ere-check and correction be made accordingly.
|
|
47
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
16/07/2022
|
The online observation raised by your office regarding status of land has been attended and needful done please.
|
|
48
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
01/08/2022
|
Returned with the remarks that the observations raised by this office on dated 07.05.2022 has not been attended online part-II legal status mentioned as nil which is not tenable
|
|
49
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
01/08/2022
|
Observation attended and submitted to worthy, CCF Rampur.
|
|
50
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
03/08/2022
|
Reply EDS is enclosed
|
|
51
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
24/08/2022
|
eds
|
|
52
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
26/08/2022
|
EDS
|
|
53
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
29/12/2022
|
Upload Combined PDF Of Proposal
|
|
54
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
29/12/2022
|
The correction have been made as per the instruction received
|
|
55
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
10/01/2023
|
attend the observation please.
|
|
56
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
10/01/2023
|
The correction have been made as per the instruction received
|
|
57
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
10/01/2023
|
The objection raised vide your office Endst No. is re-submitted to your good office also in a hard copy , with hope to further necessary action at your end please.
|
|
58
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
19/01/2023
|
Reply of EDS is enclosed
|
|
59
|
Head Office
|
EDS
|
State secretary
|
03/04/2023
|
EDS
|
|
60
|
State secretary
|
EDS
|
Nodal Officer
|
04/04/2023
|
EDS
|
|
61
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
04/04/2023
|
EDS
|
|
62
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
04/04/2023
|
EDS
|
|
63
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
13/04/2023
|
EDS
|
|
64
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
13/04/2023
|
The correction have been made as per the instruction received
|
|
65
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
13/04/2023
|
The EDS has been attended and documents uploaded in Part-I by UA
|
|
66
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
17/04/2023
|
Reply of EDS enclosed
|
|
67
|
Nodal Officer
|
REPLY
|
State secretary
|
20/04/2023
|
Complete reply is submitted
|
|
68
|
State secretary
|
REPLY
|
Head Office
|
20/04/2023
|
Complete reply is submitted
|
|
69
|
Head Office
|
EDS
|
State secretary
|
22/05/2023
|
EDS
|
|
70
|
State secretary
|
EDS
|
Nodal Officer
|
23/05/2023
|
EDS
|
|
71
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
23/05/2023
|
EDS
|
|
72
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
25/05/2023
|
EDS
|
|
73
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
01/06/2023
|
EDS
|
|
74
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
01/06/2023
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
01/06/2023
|
EDS Attended
|
|
76
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
14/06/2023
|
Reply of EDS is enclosed
|
|
77
|
Nodal Officer
|
REPLY
|
State secretary
|
16/06/2023
|
Complete reply is submitted
|
|
78
|
State secretary
|
REPLY
|
Head Office
|
16/06/2023
|
Complete reply is submitted
|
|
79
|
Head Office
|
EDS
|
State secretary
|
05/07/2023
|
EDS
|
|
80
|
State secretary
|
EDS
|
Nodal Officer
|
06/07/2023
|
EDS
|
|
81
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
06/07/2023
|
EDS
|
|
82
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
10/07/2023
|
EDS
|
|
83
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
13/07/2023
|
Attend the observation as raised by MoEF please.
|
|
84
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
13/07/2023
|
The correction have been made as per the instruction received
|
|
85
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
13/07/2023
|
Needful has been done
|
|
86
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
14/07/2023
|
Reply given as per attachment
|
|
87
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
15/07/2023
|
In reply to point point No. 1 &11 are not attended properly
|
|
88
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
15/07/2023
|
Reply of observation raised by Nodal Office (FCA) O/ Pr. CCF HP vide dated 15.07.2023 received through online mode.
|
|
89
|
Nodal Officer
|
REPLY
|
State secretary
|
17/07/2023
|
Complete reply is submitted
|
|
90
|
State secretary
|
REPLY
|
Head Office
|
17/07/2023
|
Complete reply is submitted
|
|
91
|
Head Office
|
EDS
|
State secretary
|
09/08/2023
|
EDS
|
|
92
|
State secretary
|
EDS
|
Nodal Officer
|
09/08/2023
|
eds
|
|
93
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
09/08/2023
|
eds
|
|
94
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
10/08/2023
|
EDS
|
|
95
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
14/09/2023
|
EDS
|
|
96
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
14/09/2023
|
The correction have been made as per the instruction received
|
|
97
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
14/09/2023
|
EDS has been attended and reply with annexure attached
|
|
98
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
15/09/2023
|
No copy of Annexure along with reply found attached .
|
|
99
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
16/09/2023
|
Reply with Annexure uploaded against additional information detail at Sr. No. 18
|
|
100
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
20/09/2023
|
EDS/Shortcoming
|
|
101
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
23/09/2023
|
EDS
|
|
102
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
23/09/2023
|
The correction have been made as per the instruction received
|
|
103
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
23/09/2023
|
Necessary Correction has been done and reply uploaded on the portal
|
|
104
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
27/09/2023
|
The reply to the point NO.6 is not complete since there is no mention of action taken against the violation done by User Agency . Please see to it.
|
|
105
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
27/09/2023
|
reply to the point No 6, in continuation to this office letter No 4021 dated 25.09.2023 is attached herewith
|
|
106
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
29/09/2023
|
Reply of EDS
|
|
107
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
29/09/2023
|
EDS Attended
|
|
108
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
29/09/2023
|
Reply EDS
|
|
109
|
Nodal Officer
|
REPLY
|
State secretary
|
05/10/2023
|
Complete reply is submitted
|
|
110
|
State secretary
|
REPLY
|
Head Office
|
05/10/2023
|
Complete reply is submitted
|
|
111
|
Head Office
|
EDS
|
State secretary
|
09/11/2023
|
EDS
|
|
112
|
State secretary
|
EDS
|
Nodal Officer
|
16/11/2023
|
EDS
|
|
113
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
16/11/2023
|
EDS
|
|
114
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
22/11/2023
|
EDS
|
|
115
|
DFO (Kinnaur)
|
EDS
|
User Agency (nogs_gill@yahoo.com)
|
30/11/2023
|
Attend the observatios as raised by CCF Rampur Endst. No. 3879 dated 22.11.2023 immediately.
|
|
116
|
User Agency (nogs_gill@yahoo.com)
|
REPLY
|
DFO (Kinnaur)
|
11/01/2024
|
The correction have been made as per the instruction received
|
|
117
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
12/01/2024
|
Reply With Annexure
|
|
118
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
15/01/2024
|
Reply of EDS is attached
|
|
119
|
Nodal Officer
|
REPLY
|
State secretary
|
18/01/2024
|
Complete reply is submitted
|
|
120
|
State secretary
|
REPLY
|
Head Office
|
18/01/2024
|
Complete reply is submitted
|
|
121
|
Head Office
|
EDS
|
State secretary
|
19/02/2024
|
EDS
|
|
122
|
State secretary
|
EDS
|
Nodal Officer
|
20/02/2024
|
EDS
|
|
123
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
20/02/2024
|
EDS
|
|
124
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
20/02/2024
|
EDS
|
|
125
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
20/02/2024
|
After attending the all EDS/ Observation in all shape the case is submitted please.
|
|
126
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
21/02/2024
|
Please upload the receipt regarding payment of additional amount of CAT Plan for Rs.97557500/-
|
|
127
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
21/02/2024
|
Submitted please.
|
|
128
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
21/02/2024
|
Reply of EDS
|
|
129
|
Nodal Officer
|
EDS
|
CF (Rampur)
|
21/02/2024
|
EDS
|
|
130
|
CF (Rampur)
|
EDS
|
DFO (Kinnaur)
|
21/02/2024
|
EDS
|
|
131
|
DFO (Kinnaur)
|
REPLY
|
CF (Rampur)
|
21/02/2024
|
Needful has been done
|
|
132
|
CF (Rampur)
|
REPLY
|
Nodal Officer
|
21/02/2024
|
Needful has been done
|
|
133
|
Nodal Officer
|
REPLY
|
State secretary
|
22/02/2024
|
Complete reply is submitted
|
|
134
|
State secretary
|
REPLY
|
Head Office
|
22/02/2024
|
Complete reply is submitted
|
|