Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Jammu and Kashmir
|
FP/JK/ROAD/141843/2021
|
9-JKC-096/2021-Jammu
|
Widening of road from Phiter to Billawar road alongwith Balance work of Billawar to Sukralla road
|
Road
|
XEN PWD BASOHLI
|
0.15
|
IN-PRINCIPLE
|
07-Jan-2022
|
|
|
|
|
|
No
|
2
|
Jammu and Kashmir
|
FP/JK/ROAD/121506/2021
|
9-JKB-011/2022-Jammu
|
Construction of road from Bani to Billawar via Dhaggar, Dhaman & Deri Galla under CRF Phase 1st.
|
Road
|
XEN PWD BASOHLI
|
1.505
|
IN-PRINCIPLE
|
22-Jun-2023
|
|
|
|
|
|
No
|
3
|
Jammu and Kashmir
|
FP/JK/ROAD/157196/2022
|
9- JKB-024/2023- Jammu
|
Construction and Upgradation of road from Hambal to Dedni.
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
1.47
|
IN-PRINCIPLE
|
30-Jul-2023
|
|
|
|
|
|
No
|
4
|
Jammu and Kashmir
|
FP/JK/ROAD/152391/2022
|
9-JKC-031/2022-Jammu
|
Construction of road from Devak-Bambliya connecting Sanki-Deoli & Hathal-Sarroti
|
Road
|
EXECUTIVE ENGINEER PWD (R&B) DIVISION NOWSHERA
|
6.051
|
IN-PRINCIPLE
|
02-Feb-2023
|
|
|
|
|
|
No
|
5
|
Jammu and Kashmir
|
FP/JK/ROAD/156645/2022
|
9-JKA-030/2023-Jammu
|
construction of 60.0 m span steel girder motorable bridge at Chakli Bagla Nallah including approaches,Forest area length=772 mtrs.,width=6.00mtrs,
|
Road
|
EXECUTIVE ENGINEER
|
0.4632
|
IN-PRINCIPLE
|
16-Feb-2024
|
|
|
|
|
|
No
|
6
|
Jammu and Kashmir
|
FP/JK/ROAD/46055/2020
|
9-JKB008/2021-JAMMU
|
Construction of road from Barshalla to Bhalwana via Sisool.(under CRF)
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
3.13
|
IN-PRINCIPLE
|
01-Jun-2021
|
|
|
|
|
|
No
|
7
|
Jammu and Kashmir
|
FP/JK/ROAD/45525/2020
|
9-JKB010/2021-JAMMU
|
Road from GarhSamnabanj to Marila Rajundi
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION RAMNAGAR
|
1.9825
|
IN-PRINCIPLE
|
03-May-2021
|
|
|
|
|
|
No
|
8
|
Jammu and Kashmir
|
FP/JK/ROAD/118616/2021
|
9-JKB023-2021-JAMMU
|
Construction of road from Patnazi to Kither
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
2.895
|
IN-PRINCIPLE
|
18-May-2021
|
|
|
|
|
|
No
|
9
|
Jammu and Kashmir
|
FP/JK/ROAD/46659/2020
|
9-JKB-079/2021-Jammu
|
Construction of Road Padhri to Bhal padri By PWD(R&B) in Bhaderwah Forest Division.
|
Road
|
R&B DEPARTMENT JAMMU
|
6.48
|
IN-PRINCIPLE
|
24-Jan-2022
|
|
|
|
|
|
No
|
10
|
Jammu and Kashmir
|
FP/JK/ROAD/147077/2021
|
9-JKB-008/2023-Jammu
|
Construction and Upgradation of Bijarni to Lal Draman Link Road Km 1st to Km 10th Rd (600).
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
1.137
|
IN-PRINCIPLE
|
10-Apr-2023
|
|
|
|
|
|
No
|
11
|
Jammu and Kashmir
|
FP/JK/ROAD/120321/2021
|
9-JKB042/2021-JAMMU
|
Upgradation of Road L-060 Kothar to Ponthal
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION JAMMU
|
1.482
|
IN-PRINCIPLE
|
16-Jun-2021
|
|
|
|
|
|
No
|
12
|
Jammu and Kashmir
|
FP/JK/VELEC/146784/2021
|
9-JKB-006-2022/Jammu
|
Rural Electrification Works under DDUGJY,DDUGJY-Xii and PMDP scheme in District Ramban.
|
Village Electricity
|
EXECUTIVE ENGINEER ELECTRIC DIVISION BATOTE
|
1.46
|
IN-PRINCIPLE
|
04-Mar-2022
|
|
|
|
|
|
No
|
13
|
Jammu and Kashmir
|
FP/JK/ROAD/140949/2021
|
: 9-JKA-029/2022-Jammu
|
Limber Babagail
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.4
|
IN-PRINCIPLE
|
31-Oct-2022
|
|
|
|
|
|
No
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/149047/2021
|
9-JKB-036/2022-Jammu
|
Construction of road from Towara to Dodla
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
1.38
|
IN-PRINCIPLE
|
31-Aug-2022
|
|
|
|
|
|
No
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/144993/2021
|
9-JKB-001/2022-Jammu
|
Alternate road to Adit-II of Sewa-II Power Station
|
Road
|
NHPC LTD SEWA-II POWER STATION
|
1.6
|
IN-PRINCIPLE
|
31-Jan-2022
|
|
|
|
|
|
No
|
16
|
Jammu and Kashmir
|
FP/JK/ROAD/49000/2020
|
9-JKB012/2021-JAMMU
|
Construction of Road from T-01 Km 2nd to Dhanori
|
Road
|
PMGSY DIVISION REASI
|
0.315
|
IN-PRINCIPLE
|
30-Apr-2021
|
|
|
|
|
|
No
|
17
|
Jammu and Kashmir
|
FP/JK/ROAD/149888/2021
|
9-JKC-004/2023- Jammu
|
Construction/Improvement from CL-09 to NHDL specifications of road Dayalchak-Ramkot (Challan) KM 8.00 to KM 25.421 (Net length 17.421 Km) in J&K (UT)
|
Road
|
69 RCC BORDER ROADS ORGANIZATION
|
12.0147
|
IN-PRINCIPLE
|
12-Jun-2023
|
|
|
|
|
|
No
|
18
|
Jammu and Kashmir
|
FP/JK/ROAD/56838/2020
|
9-JKB044-2021-JAMMU
|
Up-Gradation & Maintenance of Road from Panzlla to Shitloo
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.5
|
IN-PRINCIPLE
|
16-Jun-2021
|
|
|
|
|
|
No
|
19
|
Jammu and Kashmir
|
FP/JK/ROAD/45448/2020
|
9-JKB016/2021-JAMMU
|
Upgradation of Road T01 Supply Morh to Kainthgali
|
Road
|
EE PMGSY UDH
|
2.2585
|
IN-PRINCIPLE
|
03-May-2021
|
|
|
|
|
|
No
|
20
|
Jammu and Kashmir
|
FP/JK/ROAD/155313/2022
|
9-JKA-006/2023-Jammu
|
Completion of balance work of Mandagali Koyli road km 4th onwards
|
Road
|
EXECUTIVE ENGINEER
|
0.375
|
IN-PRINCIPLE
|
02-May-2023
|
|
|
|
|
|
No
|
21
|
Jammu and Kashmir
|
FP/JK/ROAD/149120/2021
|
9-JKB-027/2022 -Jammu
|
Construction of road from Thune to Badipathri, JK1349, Stage Ist
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
4
|
IN-PRINCIPLE
|
14-Dec-2022
|
|
|
|
|
|
No
|
22
|
Jammu and Kashmir
|
FP/JK/Others/44473/2020
|
9-JKB004/2020-JAMMU
|
Construction of Tourist Facilitation Center and Security Cabin at Daksum
|
Others
|
KOKERNAG DEVELOPMENT AUTHORITY
|
0.2
|
IN-PRINCIPLE
|
11-May-2021
|
|
|
|
|
|
No
|
23
|
Jammu and Kashmir
|
FP/JK/ROAD/48915/2020
|
9-JKB034-2021-JAMMU
|
Upgradtion and Maintenance of Road from Km 4th of T02 To Madam
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.27
|
IN-PRINCIPLE
|
18-May-2021
|
|
|
|
|
|
No
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/115392/2020
|
9-JKB-083/2021-Jammu
|
Improvement and Upgradation of Kanda to Ransoo Road under CRF
|
Road
|
PWD (R&B) DIVISION REASI
|
2.895
|
IN-PRINCIPLE
|
15-Dec-2021
|
|
|
|
|
|
No
|
25
|
Jammu and Kashmir
|
FP/JK/Approach/49411/2020
|
9-JKA-013/2022-Jammu
|
PARALLEL BYEPASS ROAD FROM OLD BRIDGE KUPWARA
|
Approach Access
|
CHIEF ENGINEER PW RNB KASHMIR
|
0.175
|
IN-PRINCIPLE
|
13-Apr-2022
|
|
|
|
|
|
No
|
26
|
Jammu and Kashmir
|
FP/JK/ROAD/44303/2020
|
9-JKB-053/2022 -Jammu
|
Construction of road from choura gali to ladote via muku brade under PWD(R&B) Division Rajouri
|
Road
|
R&B DEPARTMENT JAMMU
|
1.785
|
IN-PRINCIPLE
|
15-Dec-2022
|
|
|
|
|
|
No
|
27
|
Jammu and Kashmir
|
FP/JK/TRANS/145320/2021
|
9-JKB-052/2022-Jammu
|
CONSTRUCTION OF 132 KV D/C RAMBAN SANGALDAN TRANSMISSION LINE FOR PROVIDING POWER SUPPLY TO KONKAN RAILWAY
|
Transmission Line
|
EXECUTIVE ENGINEER TLMD 3 UDHAMPUR
|
4.37
|
IN-PRINCIPLE
|
14-Jan-2023
|
|
|
|
|
|
No
|
28
|
Jammu and Kashmir
|
FP/JK/ROAD/47959/2020
|
9-JKB003-2021-CHA
|
Ransoo (Chinar) to Bamlia Sangar
|
Road
|
PMGSY DIVISION REASI
|
3.27
|
IN-PRINCIPLE
|
04-Mar-2021
|
|
|
|
|
|
No
|
29
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
IN-PRINCIPLE
|
24-Jan-2022
|
|
|
|
|
|
No
|
30
|
Jammu and Kashmir
|
FP/JK/TRANS/44649/2020
|
9-JKB-003/2020-Jammu
|
Re alignment of 220Kv KPTL Line KP175 KP176 Near Baggu nallah Batote
|
Transmission Line
|
EXECUTIVE ENGINEER TLMD 3 UDHAMPUR
|
1.47
|
IN-PRINCIPLE
|
29-Apr-2022
|
|
|
|
|
|
No
|
31
|
Jammu and Kashmir
|
FP/JK/VELEC/153465/2022
|
9-JKB-047/2022-Jammu
|
Laying shifting of new 11kv line from danddoroo to sewarbhati
|
Village Electricity
|
JAMMU POWER DISTRIBUTION COMPANY LIMITED
|
2.982
|
IN-PRINCIPLE
|
21-Jan-2023
|
|
|
|
|
|
No
|
32
|
Jammu and Kashmir
|
FP/JK/ROAD/48778/2020
|
9-JKC-051/2021-Jammu
|
Construction of Road From Ganjote to Phallni-II Package No JK 14-572
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
14.31
|
IN-PRINCIPLE
|
13-Aug-2021
|
|
|
|
|
|
No
|
33
|
Jammu and Kashmir
|
FP/JK/ROAD/48777/2020
|
9-JKC-036/2021-Jammu
|
Kundhardan To Mamankote Upper Package No. JK14-567
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
7.69
|
IN-PRINCIPLE
|
22-Jul-2021
|
|
|
|
|
|
No
|
34
|
Jammu and Kashmir
|
FP/JK/ROAD/49135/2020
|
9-JKB-047/2021-JAMMU
|
Gatha to Hanga Noori Road
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
1.65
|
IN-PRINCIPLE
|
15-Jun-2021
|
|
|
|
|
|
No
|
35
|
Jammu and Kashmir
|
FP/JK/ROAD/119464/2021
|
9-JKB048/2021-JAMMU
|
bhaboor to jigote
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
0.72
|
IN-PRINCIPLE
|
03-Jun-2021
|
|
|
|
|
|
No
|
36
|
Jammu and Kashmir
|
FP/JK/ROAD/47888/2020
|
9-JKC-004/2021-Jammu
|
Khourgali to Radnote
|
Road
|
PMGSY DIVISION REASI
|
5.029
|
IN-PRINCIPLE
|
10-May-2021
|
|
|
|
|
|
No
|
37
|
Jammu and Kashmir
|
FP/JK/ROAD/46769/2020
|
9-JKC-027/2021-Jammu
|
Road from Trembli to Dheota (JK07-87)
|
Road
|
PIU KATHUA
|
10.385
|
IN-PRINCIPLE
|
13-Jul-2021
|
|
|
|
|
|
No
|
38
|
Jammu and Kashmir
|
FP/JK/ROAD/146385/2021
|
9-JKA-043/2022-Jammu
|
Construction of link road from Beer Bagh to Kanhal via Shiva
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
0.41
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
39
|
Jammu and Kashmir
|
FP/JK/ROAD/51198/2020
|
9-JKC-015/2022-Jammu
|
construction of Motorable Road from Nowpachi Deherna upto Hanzal
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
7.4783
|
IN-PRINCIPLE
|
29-Sep-2022
|
|
|
|
|
|
No
|
40
|
Jammu and Kashmir
|
FP/JK/ROAD/65427/2020
|
9-JKB025-2021-CHA
|
Upgradation and Maintenance of road from MRL01-Tarathpora to Waisa via Shenpora cherpawa Kulwari Lilam Stage -U ( Batch -I, 2019-20) Package No JK08-2012, Length = 8.5kms, Block Ramhal
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.184
|
IN-PRINCIPLE
|
16-Apr-2021
|
|
|
|
|
|
No
|
41
|
Jammu and Kashmir
|
FP/JK/ROAD/47242/2020
|
9-JKB050-2021-JAMMU
|
Harog to Halla
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
0.9
|
IN-PRINCIPLE
|
24-May-2021
|
|
|
|
|
|
No
|
42
|
Jammu and Kashmir
|
FP/JK/ROAD/44451/2020
|
9-JKB039/2021-JAMMU
|
Khellani Dranga Hud to Saras
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
3.122
|
IN-PRINCIPLE
|
15-Jun-2021
|
|
|
|
|
|
No
|
43
|
Jammu and Kashmir
|
FP/JK/ROAD/54083/2020
|
9-JKB041-2021-JAMMU
|
Kharangal to Chounri
|
Road
|
PMGSY DIVISION THATHRI
|
0.88
|
IN-PRINCIPLE
|
14-Jun-2021
|
|
|
|
|
|
No
|
44
|
Jammu and Kashmir
|
FP/JK/Others/153273/2022
|
9-JKA-044/2022-Jammu
|
Construction of Treasury Building at Bani
|
Others
|
DIRECTOR ACCOUNTS & TREASURIES JAMMU
|
0.05
|
IN-PRINCIPLE
|
22-Nov-2022
|
|
|
|
|
|
No
|
45
|
Jammu and Kashmir
|
FP/JK/ROAD/57299/2020
|
9-JKB011-2021-JAMMU
|
Construction of road from Neeru to Sikander.
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
3.67
|
IN-PRINCIPLE
|
19-Apr-2021
|
|
|
|
|
|
No
|
46
|
Jammu and Kashmir
|
FP/JK/ROAD/69175/2020
|
9-JKB024/2021-JAMMU
|
Construction of Kandni to Ohli part-II road
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
1.59
|
IN-PRINCIPLE
|
01-Jun-2021
|
|
|
|
|
|
No
|
47
|
Jammu and Kashmir
|
FP/JK/ROAD/123537/2021
|
9-JKA-060/2021-JAMMU
|
Widening and Upgradation of road from L074-Kraldaji to Syed Abad Dedikoot Package No. JK082009 PMGSY-II
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.83
|
IN-PRINCIPLE
|
15-Jul-2021
|
|
|
|
|
|
No
|
48
|
Jammu and Kashmir
|
FP/JK/ROAD/45330/2020
|
9-JKA-009/2022-Jammu
|
Improvement and upgradation of Mantalai Dudu road KM 1st to 5th
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
0.28
|
IN-PRINCIPLE
|
13-Apr-2022
|
|
|
|
|
|
No
|
49
|
Jammu and Kashmir
|
FP/JK/ROAD/157064/2022
|
9-JKB-058/2022 -Jammu
|
Construction Of Road from Bawa To Mangit
|
Road
|
PWD R&B JAMMU
|
1.05
|
IN-PRINCIPLE
|
09-Nov-2022
|
|
|
|
|
|
No
|
50
|
Jammu and Kashmir
|
FP/JK/ROAD/149044/2021
|
9-JKA-007/2023-Jammu
|
Construction of road from Kaldi to Khurrian alongwith drainage
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PWD UDHAMPUR
|
0.96
|
IN-PRINCIPLE
|
31-Mar-2023
|
|
|
|
|
|
No
|
|