PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
JK-074/2020
1.
Location of the project/Scheme :
Jammu and Kashmir
(i)
State / Union Territory :
Jammu and Kashmir
(ii)
District :
Doda
(iii)
Forest Division :
Bhaderwah Forest Division
 (iv)
Area of forest land proposed for diversion (in ha.) :
6.48
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Bhaderwah Forest Division
6.48
Reserved Forest
Total
6.48
Division 1. : Bhaderwah Forest Division
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Doda
6.48
Total
6.48
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
6.48
0.7
Eco 6
Total.
6.48
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Pine
Kail
65
30
39
14
9
3
2
Others
Fir
0
0
0
18
10
62
3
Others
Jamoon
0
0
0
0
2
3
4
Others
Kharshoo
18
17
10
55
56
50
Total
83
47
49
87
77
118
Sub Total (No of Trees.)
461
5.
Working plan prescription for the forest land proposed for diversion :
Fir Selection Working Circle
6.
Brief note on vulnerability of the forest area to erosion :
High possibility of erosion during and after construction of road
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Himalayan Monal Pheasant, Musk Deer, Leopard, Trillium govanianum, Bergenia ciliata
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
Yes
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
1558587
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
17.50
RF
Neeru
6/P
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Check list of documents.
2
Detailed report on Violation
3
Specific recommendation by DFO
4
Calculation sheet of NPV
5
Toposheet
6
Location Map
7
Land Suitability Certificate
8
STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION.
9
Undertaking of CA
10
Geo reference map
11
Joint inspection report
12
Approval of CA by the CCF Jammu
13
SITE INSPECTION REPORT
14
Population Benefitted Certificate
15
RD wise calculation sheet
16
Total Forest Area Calculation Sheet
17
Extraction Charges of Trees
18
CERTIFICATE FOR MINIMUM USE OF FOREST LAND
19
Undertaking of NPV
20
Biological measures for stabilization of muck dumping sites
21
Photograph of proposed CA site of degraded forest land
22
Main Application part 2
23
Enumeration List
24
UNDERTAKING FOR PAYMENT OF ADDITIONAL NET PRESENT
25
STATEMENT SHOWING DETAILS OF NON-FOREST AREA INVOLVED IN THE PROPOSAL
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Doda
262500
146469.72
408.73
101
3318
01/04/2020
3318
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Bhaderwah Forest Division
Chenab Circle Doda
DFO
Yes
One
04/07/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Bhaderwah Forest Division
Chenab Circle Doda
DFO
Recommended
The alignment passes through hill terrain inter alias intersecting a host of picnic spots. the recommended forest that require retaining wall be constructed along the length of road with at least 450 metre retaining wall length per Km of the proposed road length and Culverts at appropriate points.
Chenab Circle Doda
CF
Recommended
Forest land divertion under J&K PWD R&B B. C road division bhaderwah for construction of link road from padri to bhal padri is here by recommended for approval under FCA. Total of 6.48 ha of forest land near padri in bhaderwah forest division is recommended.
Yes
Nodal Officer
Recommended
To promote Tourism.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Jammu and Kashmir
State Secretary
Recommended
21/09/2021
The case is recommended for grant of Stage I Clearance.
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Jammu
Regional Office
9-JKB-079/2021-Jammu
24/01/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/JK/ROAD/46659/2020
ROAD466592020303
11,696,534.00
5,692,000.00
2022-06-30
RBI1822222369160
Union Bank Of India
NEFT/RTGS (Challan)
2022-06-03
2022-06-04
FP/JK/ROAD/46659/2020
ROAD466592020303
11,696,534.00
2,846,000.00
2023-01-25
RBI0262357351664
Union Bank Of India
NEFT/RTGS (Challan)
2022-06-03
2022-06-04
FP/JK/ROAD/46659/2020
ROAD466592020303
11,696,534.00
2,846,000.00
2023-01-25
RBI0262357351663
Union Bank Of India
NEFT/RTGS (Challan)
2022-06-03
2022-06-04
FP/JK/ROAD/46659/2020
ROAD466592020303
11,696,534.00
312,534.00
2023-03-27
RBI0872374574576
Union Bank Of India
NEFT/RTGS (Challan)
2022-06-03
2022-06-04
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
17.5
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
17.5
Status of CA Land so identified :
Forest Area
Site Name :
Padri
Location Details :
Latitude 32°54’35.592”N - 32°54’29.771”N Longitude 75°47’53.439”E - 75°48’3.269”E
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Gullu Forest
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/JK/ROAD/46659/2020
14 Dec 2023
No Data
verified
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/JK/ROAD/46659/2020
Approved In-Principle
No Data
Print