Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/8382/2014
|
8B/UCP/06/70/2015-FC
|
Bhatkot Dhon Rithachora Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.47
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2014
|
Stage-I Approval on
|
:
|
12 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
16 Aug 2024
|
|
|
|
|
2
|
Uttarakhand
|
FP/UK/ROAD/11200/2015
|
8B/UCP/06/216/2015/FC
|
jakh to garau darimi motor road
|
Road
|
EXECUTIVE ENGINEER
|
0.98
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2015
|
Stage-I Approval on
|
:
|
22 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/11370/2015
|
8b/UCP/09/178/2015
|
Construction of Gajar to kwaralli Motor Road under PMGSY.
|
Road
|
PMGSY
|
5.31
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2015
|
Stage-I Approval on
|
:
|
15 Apr 2016
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
4
|
Uttarakhand
|
FP/UK/ROAD/10617/2015
|
8B/UCP/06/195/2015
|
Construction of Gram Kush & Kushdev Mahadev Motor Road from Km. 13 of Parkal Kedarkot Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.753
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2015
|
Stage-I Approval on
|
:
|
12 May 2016
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2024
|
|
|
|
|
5
|
Uttarakhand
|
FP/UK/ROAD/13103/2015
|
8B/UCP/06/86/2015
|
Maniyachhina-Bhatgar motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.6576
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2015
|
Stage-I Approval on
|
:
|
08 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/11258/2015
|
8B/UCP/06/174/2016
|
Dheghat - Nagchula To Chanterkhali -Kaliyalingudh Jhipa Bend Motor Road.
|
Road
|
EXECUTIVE ENGINEER
|
1.485
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2015
|
Stage-I Approval on
|
:
|
17 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
|
7
|
Uttarakhand
|
FP/UK/ROAD/10541/2015
|
8B/UCP/06/150/2016/FC
|
Const. of Peepna Kola Rankuna Gohali motor road
|
Road
|
EXECUTIVE ENGINEER
|
4.185
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2015
|
Stage-I Approval on
|
:
|
09 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2024
|
|
|
|
|
8
|
Uttarakhand
|
FP/UK/ROAD/11177/2015
|
8B/UCP/06/100/2015/FC
|
New construction Of Jhala Koti Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT GHANSALI
|
0.784
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2015
|
Stage-I Approval on
|
:
|
04 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
|
9
|
Uttarakhand
|
FP/UK/ROAD/20084/2016
|
8B/UCP/06/218/2016/FC
|
C/O Lachampur (Nakayal) Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.08
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jun 2016
|
Stage-I Approval on
|
:
|
07 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2024
|
|
|
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/10731/2015
|
8B/UCP/06/213/2015/FC
|
Kanda-Saniudiyar-Rawatsera motor road Kotpatal Band to Bhadora-Bajirod motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.84
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Mar 2015
|
Stage-I Approval on
|
:
|
22 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/16302/2015
|
8B/UCP/06/256/2016/FC
|
CHAUMASI TO NIVATTAR MOTAR ROAD
|
Road
|
EECDPWDUKM
|
0.755
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
16 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/16309/2015
|
8B/UCP/06/60/2016/FC
|
Santi Bazar-Mathkhal-Talla Doba motor road in District-Bageshwar (CM Ghosna-663/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.993
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
13 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/21509/2016
|
8B/UCP/06/98/2017
|
Construction/Extension of Bageshwar-Kandhar-Patharkhani motor road via Talladhar to Gwaldam motor road in District-Bageshwar (CM Ghosna- 1779/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.76
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2016
|
Stage-I Approval on
|
:
|
28 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2024
|
|
|
|
|
14
|
Uttarakhand
|
FP/UK/ROAD/11030/2015
|
8B/UCP/06/192/2015/FC
|
Bhakarpant to Sasola-Vijaipur motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.156
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2015
|
Stage-I Approval on
|
:
|
12 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
15
|
Uttarakhand
|
FP/UK/ROAD/21524/2016
|
8B/UCP/06/81/2017/FC
|
Construction of Mankot-Baset motor road in District-Bageshwar (CM Ghosna-2122/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.369
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2016
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/10556/2015
|
8B/UCP/06/299/2015/FC
|
Construction of motor road to connect Thalmar village.
|
Road
|
EXECUTIVE ENGINEER
|
2.205
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2015
|
Stage-I Approval on
|
:
|
24 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
|
17
|
Uttarakhand
|
FP/UK/ROAD/12464/2015
|
8B/UCP/06/214/2015/FC
|
Bohala-Nandigaon Motor road in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.442
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2015
|
Stage-I Approval on
|
:
|
25 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
18
|
Uttarakhand
|
FP/UK/ROAD/25934/2017
|
8B/UCPP/06/36/2018/FC
|
Construction of Reetha To Koon Motor Road Under PMGSY Lohaghat
|
Road
|
PMGSY LOHAGHAT
|
6.94
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 May 2017
|
Stage-I Approval on
|
:
|
03 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2024
|
|
|
|
|
19
|
Uttarakhand
|
FP/UK/ROAD/10965/2015
|
8B/UCP/06/96/2015/FC
|
New Construction Of Thela Tharti Chirbitiya Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT GHANSALI
|
4.357
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2015
|
Stage-I Approval on
|
:
|
19 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
|
20
|
Uttarakhand
|
FP/UK/ROAD/18757/2016
|
8B/UCP/06/59/2017/FC
|
Fatgali-Damoli-Malujhal-Ukhalso motor road in District Bageshwar (CM Ghosna-804/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.103
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/19786/2016
|
8B/UCP/06/76/2017/FC
|
Langasu-Niwari-Khet-Silangi M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
3.09
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2016
|
Stage-I Approval on
|
:
|
06 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jun 2024
|
|
|
|
|
22
|
Uttarakhand
|
FP/UK/ROAD/9349/2015
|
8B/UCP/06/153/2015/FC
|
Extension of KOTILA GWAD MOTOR ROAD UPTO SUARIKHET
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.85
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2015
|
Stage-I Approval on
|
:
|
23 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
16 Aug 2024
|
|
|
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/22249/2016
|
8B/UCP/06/74/2017/FC
|
Jaal bend to Chilond Motor Road
|
Road
|
EECDPWDUKM
|
1.61
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2016
|
Stage-I Approval on
|
:
|
31 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/23820/2017
|
8B/UCP/06/32/2018/FC
|
construction of soughar pantgoun chmarkhan motor road single line to der line
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.612
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2017
|
Stage-I Approval on
|
:
|
27 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2024
|
|
|
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/9686/2015
|
8B/UCP/06/89/2015/FC
|
Jalthakot-Chamarthal-Kimoli motor road in District-Bageshwar (Kargil Sahid Sri Mohan Singh Nagarkoti Memorial motor road)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
3.115
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2015
|
Stage-I Approval on
|
:
|
02 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/10527/2015
|
8B/UCP/06/86/2017
|
bharvakatal shripur motor road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.975
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2015
|
Stage-I Approval on
|
:
|
07 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2024
|
|
|
|
|
27
|
Uttarakhand
|
FP/UK/ROAD/23731/2017
|
8B/UCP/06/61/2018/FC
|
Masrana to kimoi motor road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
5.3025
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2017
|
Stage-I Approval on
|
:
|
16 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
|
28
|
Uttarakhand
|
FP/UK/WATER/26619/2017
|
8B/UCP/09/64/2018/FC
|
JOSHIMATH LONG TERM W/S SCHEME
|
Drinking Water
|
PEY JAL NIGAM GOPESWAR
|
1.149
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2017
|
Stage-I Approval on
|
:
|
29 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/35197/2018
|
8B/UCP/06/74/2019/FC
|
Ratkhal to Khalyun (Seema-Ristana) Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
4.104
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Aug 2018
|
Stage-I Approval on
|
:
|
19 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jun 2024
|
|
|
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/10142/2015
|
8B/UCP/06/82/2015/FC
|
Construction of Chamdeval to Nidil M/R under PMGSY Champawat.
|
Road
|
PMGSY
|
5.54
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2015
|
Stage-I Approval on
|
:
|
23 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2024
|
|
|
|
|
31
|
Uttarakhand
|
FP/UK/ROAD/13065/2015
|
8B/UCP/06/252/2016/FC
|
Construction of Kapkot Pindari Galeshicar to Kafalikmera Motor Road
|
Road
|
PMGSY
|
6.287
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jun 2015
|
Stage-I Approval on
|
:
|
11 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2024
|
|
|
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/13390/2015
|
8B/UCP/06/102/2018/FC
|
ringalgarh to darak motor road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.295
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2015
|
Stage-I Approval on
|
:
|
07 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2024
|
|
|
|
|
33
|
Uttarakhand
|
FP/UK/ROAD/20710/2016
|
8B/UCP/06/120/2018/FC/23
|
Purukul village to Bhitarli- Kimari MR
|
Road
|
PMGSY ID DEHRADUN
|
3.528
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2016
|
Stage-I Approval on
|
:
|
02 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
|
34
|
Uttarakhand
|
FP/UK/ROAD/41387/2019
|
8B/UCP/06/187/2019/FC
|
RAMA TO SYALUKA
|
Road
|
PMGSYID PUROLA
|
4.536
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
|
35
|
Uttarakhand
|
FP/UK/ROAD/38448/2019
|
8B/UCP/06/67/2020/FC
|
Construction of Nandprayag Ghat M/R K.M. 15 to Jakhani Motor Road Under PMGSY
|
Road
|
PMGSY
|
2.3975
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
|
36
|
Uttarakhand
|
FP/UK/ROAD/16041/2015
|
8B/UCP/06/199/2019/FC
|
Banderlima Harkhola Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
0.99
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2015
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2024
|
|
|
|
|
37
|
Uttarakhand
|
FP/UK/ROAD/47038/2020
|
8B/UCP/06/121/2020/FC
|
C/0 of Link Motor Road from kasardevi (Tiwarikhan) to village Math
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.565
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
|
38
|
Uttarakhand
|
FP/UK/ROAD/37472/2018
|
8B/UCP/06/131/2020/FC
|
Haliyadov,Lachhima,Okharani,Nachni Moter Road
|
Road
|
EE TY DIV PWD BERINAG
|
4.981
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2018
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/23612/2017
|
8B/UCP/06/20/2018/FC
|
Talsari Tok To Gaundar Motor Road
|
Road
|
EECDPWDUKM
|
4.005
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2017
|
Stage-I Approval on
|
:
|
26 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
|
40
|
Uttarakhand
|
FP/UK/ROAD/16999/2015
|
8B/UCP/06/262/2016/FC
|
Construction of Kathpuriya to kalodiya (Katunia) Motor Road.Length(1.850km)
|
Road
|
EXECUTIVE ENGINEER
|
0.536
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2016
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/15675/2015
|
8B/UCP/06/124/2016
|
Construction of Gwatoli-Kareempur to Freedom Fighter Shri Ram Datt Joshi Village Length 2.00
|
Road
|
PWDKAPKOT
|
1.687
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Sep 2015
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2024
|
|
|
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/20557/2016
|
8B/UCP/06/53/2020/FC
|
Const. of Kunjkhal - Barsund Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.575
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2016
|
Stage-I Approval on
|
:
|
19 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2024
|
|
|
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/36299/2018
|
8B/UCP/06/99/2020/FC
|
Bhuvneswari mandir to Chaka Pichchawada via Nauli to Nagar Motor Road
|
Road
|
PWD
|
2.99
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2018
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Aug 2024
|
|
|
|
|
44
|
Uttarakhand
|
FP/UK/ROAD/39084/2019
|
8B/UCP/06/179/2020/FC
|
Construction of Triyuginarayan to Toshi moter road
|
Road
|
EECDPWDUKM
|
4.5
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2019
|
Stage-I Approval on
|
:
|
22 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2023
|
|
|
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/49632/2020
|
8B/UCP/06/57/2021/FC
|
Construction of Jaspur Silyan Nirakot Motor road
|
Road
|
PROVINCIAL DIVISION PWD BHATWARI
|
2.125
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Sep 2020
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/47083/2020
|
8B/UCP/06/161/2020/FC
|
Const.kharmanday Ganai moter Road
|
Road
|
EE TY DIV PWD BERINAG
|
7.785
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jul 2020
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
47
|
Uttarakhand
|
FP/UK/ROAD/143491/2021
|
8B/UCP/06/109/2021/FC
|
construction of khandoliya khet to kola-pultanda motor road of block nanidanda, constituency Lansdowne dist pauri garhwal under state sector
|
Road
|
PWD LANSDOWNE
|
0.45
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
Stage-I Approval on
|
:
|
17 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2024
|
|
|
|
|
48
|
Uttarakhand
|
FP/UK/ROAD/152108/2022
|
8B/UCP/06/49/2022/FC
|
Construction of Pulinda Tachhali Syalinga motor road in Constituency Yamkeshwar, Block Dugadda. (District Pauri Garhwal) under CM Ghoshna 1196/2016.
|
Road
|
ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN
|
1.8675
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Feb 2022
|
Stage-I Approval on
|
:
|
30 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
49
|
Uttarakhand
|
FP/UK/RAIL/148843/2021
|
8B/UCP/07/28/2022/FC
|
Development of 126 Km Long Rishikesh- Karnprayag New BG Rail Link in the State of Uttarakhand - Additional Land at Nagrasu
|
Railway
|
CPM RISHIKESH OFFICE RAIL VIKAS NIGAM LIMITED
|
0.4769
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2021
|
Stage-I Approval on
|
:
|
16 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jul 2024
|
|
|
|
|
50
|
Uttarakhand
|
FP/UK/ROAD/151113/2022
|
8B/UCP/06/73/2022/FC
|
upgradation of existing road to 2 lane configuration of rameswer-gangolighat berinag chaukori kanda bageswer takula almora section of NH-309A from km 133.00 to km170.00(Length 37.00KM)
|
Road
|
EENHRANIHET
|
22.112
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2022
|
Stage-I Approval on
|
:
|
06 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jul 2024
|
|
|
|
|
|