Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Sikkim
|
FP/SK/Others/151788/2022
|
IRO/KOL/SK/Others/151788/2022
|
Diversion of 0.0036 ha of forest land for const/setting up snow Pillows at Sheratheng under National Hydrological Project at Sherethang East Sikkim by Water Resources Deptt. Govt of Sikkim
|
Others
|
SPMU NATIONAL HYDROLOGY PROJECT UNDER WATER RESOURCES DEPARTMENT
|
0.0036
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2022
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2023
|
|
|
|
15 Dec 2023
|
2
|
Sikkim
|
FP/SK/Others/151783/2022
|
IRO/KOL/SK/Others/151783/2022
|
Diversion of 0.01 ha of forest land for Installation of Hydrological & Meteorological Station under National Hydrological Project at Yumthang, Lachung T North Sikkim by Water Resources Deptt. GoS
|
Others
|
SPMU NATIONAL HYDROLOGY PROJECT UNDER WATER RESOURCES DEPARTMENT
|
0.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2022
|
Stage-I Approval on
|
:
|
17 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2023
|
|
|
|
15 Dec 2023
|
3
|
Sikkim
|
FP/SK/TRANS/117830/2020
|
SK/TRANS-45/2021/FC
|
Diversion of 1.489 ha 66kV S/C Relechu-Pelling Tr. Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in West District by Energy and Power Deptt., Govt. of Sikkim
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
1.489
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2020
|
Stage-I Approval on
|
:
|
27 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2021
|
|
|
|
18 Jan 2022
|
4
|
Sikkim
|
FP/SK/ROAD/29923/2017
|
3-SKB065/2018-SHI
|
Diversion of 1.3344 Ha of forest land for construction of Rural Connectivity Road from PWD Road to Rongbul in South District of Sikkim by RM&DD, Govt. of Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.3344
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2017
|
Stage-I Approval on
|
:
|
18 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2025
|
|
|
|
|
5
|
Sikkim
|
FP/SK/Others/36155/2018
|
3-SK B 078/2019-SHI
|
Diversion of 0.0146 Ha of forest land for construction of cafeteria with facilities of toilet for tourist visited Cho Lhamu at Lachen in North Sikkim by RMDD, GoS
|
Others
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.0146
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Sep 2018
|
Stage-I Approval on
|
:
|
16 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2021
|
|
|
|
|
6
|
Sikkim
|
FP/SK/ROAD/117027/2020
|
SK/ROAD-38/2021/FC
|
Diversion of 5.0112 Ha of forest land for construction of rongli Roleph Section of NH-717 B in East Sikkim District by NHIDCL
|
Road
|
NHIDCL RHENOK
|
5.0112
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2020
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2022
|
|
|
|
19 Dec 2022
|
7
|
Sikkim
|
FP/SK/TRANS/41597/2019
|
3- SK B 046/2020 SHI
|
Diversion of 0.7686 ha66kV S/C Namchi to New Namchi Transmission Line
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
0.7686
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2019
|
Stage-I Approval on
|
:
|
09 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2021
|
|
|
|
30 Aug 2021
|
8
|
Sikkim
|
FP/SK/ROAD/36709/2018
|
CPWD-02/2021/FC
|
Diversion of 40.376 ha of forest land for the const of road from Leema to Chhu Junction in North Sikkim by CPWD, GoI
|
Road
|
ITBP GANGTOK
|
40.376
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2018
|
Stage-I Approval on
|
:
|
15 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
31 Mar 2022
|
|
|
|
27 Apr 2022
|
9
|
Sikkim
|
FP/SK/ROAD/124229/2021
|
IRO/KOL/SK/ROAD/99/2022/FC
|
Diversion of 19.36 ha. of Forest land for Muguthang to 20r link road
|
Road
|
ITBP GANGTOK
|
19.36
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2021
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2023
|
|
|
|
27 Oct 2023
|
10
|
Sikkim
|
FP/SK/ROAD/122332/2021
|
SK/ROAD-72/2021/FC
|
Diversion of 1.0428 ha of forest land for construction of RCR from Narkhola to Upper Narkhola & Lower Narkhola in West Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.0428
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
31 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
11
|
Sikkim
|
FP/SK/RAIL/141727/2021
|
IRO/KOL/SK/RAIL/96/2022/FC
|
Diversion of 1.8282 ha of forest land for const of Rangpo railway yard in Sivok Rangpo Project at Mazitar E Sikkim by NFR, GoI
|
Railway
|
NORTH EAST FRONTIER RAILWAY
|
1.8282
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2021
|
Stage-I Approval on
|
:
|
11 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2022
|
|
|
|
13 Sep 2022
|
12
|
Sikkim
|
FP/SK/Others/33278/2018
|
3-SK B 058/2019-SHI
|
Diversion of 0.06 ha of forest land for construction of Educational Center cum School called Kingdom Hall of Jehovah's Witnesses by Gangtok Congregation of Jehovah's Witnesses in below Degree College Upper Burtuk, Gangtok, East Sikkim
|
Others
|
EDUCATIONAL CENTER CUM KINGDOM HALL OF JEHOVAHS WITNESSES
|
0.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
22 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
11 Nov 2021
|
|
|
|
24 Feb 2022
|
13
|
Sikkim
|
FP/SK/ROAD/36660/2018
|
1824/FCA/F&ED
|
Diversion of 7.838 ha. Forest Land for non forest use in Kerang Op Dorjila (Gurudongmar Bend to Dorjila) Border Road Forest Proposal
|
Road
|
ITBP GANGTOK
|
7.838
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2018
|
Stage-I Approval on
|
:
|
21 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2023
|
|
|
|
|
14
|
Sikkim
|
FP/SK/ROAD/153655/2022
|
IRO/KOL/SK/ROAD/153655/2022
|
Diversion of 0.234 ha of forest land for construction of link road from Durga Mandir to Kamrang College at Dambudara Namchi South Sikkim by Smart City Namchi under Namchi Municipal Council
|
Road
|
NAMCHI SMART CITY LIMITED
|
0.234
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2024
|
|
|
|
22 Nov 2024
|
15
|
Sikkim
|
FP/SK/RAIL/7527/2014
|
3 SK C 010/2015-SHI
|
SIVOK RANGPO NEW BROAD GAUGE RAIL LINE
|
Railway
|
NORTH EAST FRONTIER RAILWAY
|
11.8862
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2014
|
Stage-I Approval on
|
:
|
27 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2019
|
|
|
|
17 Aug 2015
|
16
|
Sikkim
|
FP/SK/Others/41900/2019
|
SK-UDHD-70/2021/FC
|
Diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
|
Others
|
UDD GOVT OF SIKKIM
|
2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2019
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2025
|
|
|
|
29 Jan 2025
|
17
|
Sikkim
|
FP/SK/TRANS/155580/2022
|
IRO/KOL/SK/TRANS/155580/2022
|
Diversion of 0.11 ha of forest land for laying of 66 KV Perbing to Sichey underground cable along with const. of protective step wall within Jhora Reserve and Road reserve
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
0.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2022
|
Stage-I Approval on
|
:
|
17 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 May 2023
|
|
|
|
12 May 2023
|
18
|
Sikkim
|
FP/SK/ROAD/115744/2020
|
SK/ROAD-43/2021/FC
|
Construction of 2-lane specification road with paved shoulder including Tunnel at Rabangla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package –III (Design Chainage from Km 32+500 to Km 33+60
|
Road
|
MORTH (NHIDCL)
|
0.8376
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
20 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2022
|
|
|
|
08 Feb 2023
|
19
|
Sikkim
|
FP/SK/ROAD/115643/2020
|
SK/ROAD-44/2021/FC
|
Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package - IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in
|
Road
|
MORTH (NHIDCL)
|
13.6755
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2023
|
|
|
|
20 Mar 2023
|
20
|
Sikkim
|
FP/SK/Others/44304/2020
|
SK/OTHERS-40/2021/FC
|
Diversion of Forest land for Muck Dumping at martam revenue block under singtam territorial range by NHIDCL
|
Others
|
MORTH (NHIDCL)
|
0.65
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2020
|
Stage-I Approval on
|
:
|
29 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jun 2022
|
|
|
|
23 Jun 2022
|
21
|
Sikkim
|
FP/SK/Others/33702/2018
|
3-SK B 0033/2019/SHI
|
Diversion of 0.092 ha of forest land for Construction of Food Godown at 13th Mile JN Road East Sikkim by Food,Civil Supply & Consumer Affairs Deptt. Govt. of Sikkim
|
Others
|
FOOD CIVIL SUPPLIES AND CONSUMER AFFAIRS DEPARTMENT GOVT OF SIKKIM
|
0.092
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2018
|
Stage-I Approval on
|
:
|
10 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2023
|
|
|
|
25 May 2023
|
22
|
Sikkim
|
FP/SK/ROAD/134543/2021
|
SK/ROAD-59/2021/FC
|
Diversion for Forest land for Construction of 2 lane and re-alignment of existing stretch between Legship to Gyalshing of NH-510 (From km 58.840 to km 75.000 PKG-V)
|
Road
|
MORTH (NHIDCL)
|
6.8305
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2021
|
Stage-I Approval on
|
:
|
17 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2022
|
|
|
|
06 Jul 2022
|
23
|
Sikkim
|
FP/SK/TRANS/47786/2020
|
SK/TRANS-36/2021/FC
|
Diversion of 10.046 Ha. of Forest land for laying of 66 KV D/C Chungthang - Lachen Transmission Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Sikkim by Energy and Power Department, Govt. Of Sikkim
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
10.046
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Aug 2020
|
Stage-I Approval on
|
:
|
27 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2021
|
|
|
|
19 Jan 2022
|
24
|
Sikkim
|
FP/SK/Others/48756/2020
|
1911/FCA/F&ED/2020
|
Diversion of 0.2140 ha of forest land for const of playground at Aritar East Sikkim by Sports & Youth Affairs Deptt. GoS
|
Others
|
SPORTS AND YOUTH AFFAIRS DEPARTMENT GOVERNMENT OF SIKKIM
|
0.214
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Aug 2020
|
Stage-I Approval on
|
:
|
11 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2022
|
|
|
|
10 Jan 2022
|
25
|
Sikkim
|
FP/SK/ROAD/49739/2020
|
SK/ROAD-41/2021/FC
|
Diversion of 1.3224 ha of forest land for const of road from Sikkip to Ambotey Chisopani under Melli (T) Range in S.Sikkim by RDD GoS
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.3224
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2020
|
Stage-I Approval on
|
:
|
26 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
21 Feb 2025
|
26
|
Sikkim
|
FP/SK/Others/151941/2022
|
IRO/KOL/SK/Others/151941/2022
|
Diversion of Forest Land of 2.394 Ha for establishment of National Institute of Technology at Dungdung Block, Khamdong in Gangtok District of Sikkim.
|
Others
|
EDUCATION DEPT
|
2.394
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2022
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2022
|
|
|
|
23 Dec 2022
|
27
|
Sikkim
|
FP/SK/ROAD/49640/2020
|
Sk-NHIDCL-10/2021/FC
|
Diversion of 119.92 ha of forest land for const of road from Roleph to Menla under East Sikkim by NHIDCL
|
Road
|
NHIDCL RHENOK
|
119.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2020
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
13 Jan 2025
|
28
|
Sikkim
|
FP/SK/ROAD/138431/2021
|
IRO/KOL/SK/ROAD/138431/2021
|
Construction of Rural Connectivity Road from NSH via Tadong to Upper Phodong
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.376
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
29
|
Sikkim
|
FP/SK/TRANS/122230/2021
|
SK/TRANS-52/2021/FC
|
Diversion of 7.6195 Ha. of Forest land for laying of 220 KV D/C Dikchu-Singhik Transmission Line in North & East district of Sikkim by Energy & Power deptt., Govt. of Sikkim
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
7.6195
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Feb 2021
|
Stage-I Approval on
|
:
|
27 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2021
|
|
|
|
19 Jan 2022
|
30
|
Sikkim
|
FP/SK/ROAD/19382/2016
|
1700/SCaS/FEWMD
|
Diversion of forest land for const. of road from Bhusuk to Shotoklakha, Gangtok East Sikkim
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.081
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2016
|
Stage-I Approval on
|
:
|
26 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2025
|
|
|
|
24 Jun 2017
|
31
|
Sikkim
|
FP/SK/Others/146747/2021
|
IRO/KOL/SK/Others/146747/2021
|
Diversion of 0.0016 ha of Forest land for installation of Automatic Data Acquisition & Real Time Data Transmission system through Satellite for Snow Gauges and Rainfall measurement at Sherathang in East District of Sikkim
|
Others
|
TEESTA & BHAGIRATHI -DAMODAR BASIN ORGANISATION
|
0.0016
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Sep 2021
|
Stage-I Approval on
|
:
|
31 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2023
|
|
|
|
03 Mar 2023
|
32
|
Sikkim
|
FP/SK/ROAD/45772/2020
|
SK/ROAD-56/2021/FC
|
Diversion of 2.37 ha of forest land for const of RCR from Chamchey to Tinkitam via Lakamdung in South Sikkim by RDD, GoS
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
2.37
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2020
|
Stage-I Approval on
|
:
|
06 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2025
|
|
|
|
17 Mar 2025
|
33
|
Sikkim
|
FP/SK/SCH/149945/2021
|
IRO/KOL/SK/SCH/149945/2021
|
Diversion of 0.4520 ha of forest land for regularization of land occupied by Govt Sec School, Rongneck East Sikkim by Education Department Govt. of Sikkim
|
School
|
GOVT SEC SCHOOL, RONGNECK DECHELING GANGTOK EAST SIKKIM
|
0.452
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2021
|
Stage-I Approval on
|
:
|
13 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2023
|
|
|
|
22 Nov 2023
|
34
|
Sikkim
|
FP/SK/Others/122241/2021
|
IRO/KOL/SK/OTHERS/122241/2021
|
Diversion of 0.0195 ha of Forest Land for construction of Sajha Samaj Ghar/Community hall in Samdur Ranipool in East District of Sikkim by Samdur Samaj.
|
Others
|
SAJHA SAMAJ RANIPOOL, EAST SIKKIM
|
0.0195
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2021
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2022
|
|
|
|
06 Jul 2022
|
35
|
Sikkim
|
FP/SK/ROAD/36928/2018
|
SK/ROAD-82/2021/FC
|
Diversion of 141.124 ha. forest land for non forest use in Toong Partem Pt. 4865 Tamze Border Road Forest Proposal
|
Road
|
ITBP GANGTOK
|
141.124
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2018
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
14 Jan 2025
|
36
|
Sikkim
|
FP/SK/ROAD/40520/2019
|
SK/ROAD-71/2021/FC
|
Diversion of 0.9790 ha of forest land for const of RC Road from NHS via Samdonche to Upper Gaikhana in Phodong North Sikkim by RM&DD, GoS
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.979
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jun 2019
|
Stage-I Approval on
|
:
|
25 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
21 Feb 2025
|
37
|
Sikkim
|
FP/SK/ROAD/32936/2018
|
1776/FCA/F&ED
|
Diversion of 0.2987 ha of forest land for construction of Rural Connectivity Road from Kabirthang to Ratomatey School in west district of Sikkim by RMDD, Govt. of Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.2987
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Feb 2025
|
|
|
|
|
38
|
Sikkim
|
FP/SK/ROAD/125015/2021
|
SK/ROAD/58/2021/FC
|
Construction of 2-lane specification road with Paved shoulder as re-alignment of existing stretch between Legship to Gyalshing of NH-510 (From km 75.000 to km 90.210 PKG-VI)
|
Road
|
MORTH (NHIDCL)
|
2.6808
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
29 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2022
|
|
|
|
26 Jul 2022
|
39
|
Sikkim
|
FP/SK/Others/71680/2020
|
SK/OTHERS-63/2021/FC
|
Diversion 0.0083 ha of forest land for const of Sanskrit Pathshala at Radang East Sikkim by Radang Sewa Samiti
|
Others
|
RADANG SEWA SAMITI
|
0.0083
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2020
|
Stage-I Approval on
|
:
|
10 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2022
|
|
|
|
09 Jun 2022
|
40
|
Sikkim
|
FP/SK/Others/146631/2021
|
IRO/KOL/SK/Others/146631/2021
|
Installation of Automatic Data Acquisition & Real Time data Transmission system through Satellite for Rainfall, Water Level & Snow measurement at 11 Nos. of Locations in North Sikkim
|
Others
|
TEESTA & BHAGIRATHI -DAMODAR BASIN ORGANISATION
|
0.0116
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2021
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Aug 2023
|
|
|
|
11 Aug 2023
|
41
|
Sikkim
|
FP/SK/TRANS/148885/2021
|
IRO/KOL/SK/TRANS/148885/2021
|
Proposal for diversion of 8.3801 Ha of forest land for laying of 132KV D/C Dikchupool to Perbing TL under "Comprehensive Scheme for strengthening of Transmission & Distribution System in Sikkim" in East Sikkim by Energy and Power Deptt, Govt. of Sikkim
|
Transmission Line
|
ENERGY POWER DEPARTMENT SIKKIM
|
8.3801
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2021
|
Stage-I Approval on
|
:
|
25 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2023
|
|
|
|
11 Apr 2023
|
42
|
Sikkim
|
FP/SK/ROAD/38700/2019
|
3-SK B 104/2019-SHI
|
Diversion of 4.8397 ha of forest land for const of RCR from Adarsh Goan to Burul via Rikkip Tshalamathang in South Sikkim by RMDD, Govt. of Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
4.8397
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2019
|
Stage-I Approval on
|
:
|
18 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2025
|
|
|
|
|
43
|
Sikkim
|
FP/SK/Others/43155/2019
|
UDHD-01/2021/FC
|
Diversion of 1.0935 ha of forest land for const of Car Parking & Kissan Market at Gyalshing West Sikkim by UDHD Deptt, GoS
|
Others
|
URBAN DEVELOPMENT AND HOUSING DEPARTMENT
|
1.0935
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2019
|
Stage-I Approval on
|
:
|
04 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2022
|
|
|
|
06 Jul 2022
|
44
|
Sikkim
|
FP/SK/ROAD/42726/2019
|
FP/SK/ROAD/42726/2019
|
Diversion of 2.3812 ha of forest land for const of road from Jorthang Bazar to Ugen Choeling Gumpa Jorthang, S. Sikkim by UD Deptt. GoS
|
Road
|
URBAN DEVELOPMENT AND HOUSING DEPARTMENT
|
2.3812
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Nov 2019
|
Stage-I Approval on
|
:
|
31 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2025
|
|
|
|
10 Mar 2025
|