FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/SK/ROAD/36660/2018
(ii). Name of Project for which Forest Land is required :
Diversion of 7.838 ha. Forest Land for non forest use in Kerang Op Dorjila (Gurudongmar Bend to Dorjila) Border Road Forest Proposal
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Present project road is a high altitude hill road to Indo-China border road in the State of Sikkim. The project road starts from Kerang (Gurudongmar Bend) and terminates at Op Dorjila (Dorjila) with a design length of 4.31 km.
(iv). State :
Sikkim
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
7484
(viii). Area of forest land proposed for diversion(in ha.):
7.838
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
100
A-2.
Details of User Agency
(i). Name :
ITBP GANGTOK
(ii). Address1 :
Sector Head Quarter ITBP
(iii). Address2 :
Metro Point Tadong
(iv). State :
Sikkim
(v). District :
Gangtok
(vi). Pin :
737102
(vii). Landmark :
Near Ranka Monastery
(viii). Email address :
itcellgtk@itbp.gov.in
(ix). Landline Telephone No. :
3592-252527
(x). Fax No. :
3592-252528
(xi). Mobile No. :
9434760997
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Central Government
A-3.
Details of Person Making Application
(i). First Name:
Shiv Charan Lal Meena
(ii). Middle Name:
NIL
(iii). Last Name:
NIL
(iv). Gender:
Male
(v). Designation:
ExecutiveEngineer
(vi). Address 1:
BRPD- 1, CPWD, Opp- Post Office
(vii). Address 2:
S. T. Lama Building, 3rd Floor, Chungthang
(viii). State:
Sikkim
(ix). District:
Mangan
(x). Tehsil:
Chungthang
(xi). Pin:
737120
(xii). Landmark:
Opposite Post Office
(xiii). Email Address:
eeccdsikkim@gmail.com
(xiv). Landline Telephone No.:
3592-252527
(xv). Fax No.:
03592252528
(xvi). Mobile No.:
7597336900
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
North Territorial
7.838
0
Total
7.838
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Mangan
7.838
0
Total
7.838
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
BOP_Gurudongmar Bend Dorjila
7.838
0
Total
7.838
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road New Alignment
7.758
0
2
Muck Point 1
0.02
0
3
Muck Point 2
0.02
0
4
Muck Point 3
0.02
0
5
Muck Point 4
0.02
0
Total
7.838
0
C.
Maps of forest land proposed to be diverted
Division 1. : North Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
7.838
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
7.838
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
This is a new proposed road alignment for Indo-Chi
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
200
(iii). Temporary Employment(Number of person-days):
1000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
This is sanction order of Ministry of Home Affairs, Govt. of India for which CPWD is authorised.
2
This is GR of General Approval for Forest Clearance in Roads of ITBP.
3
This is answer of EDS asked by the Nodal Officer.
4
All Undertakings_Kerang to OP Dorjila Road
5
Area Statement_Kerang to OP Dorjila Road
6
Authorisation Letter_Kerang to OP Dorjila Road
7
Check List_Kerang to OP Dorjila Road
8
Cost Benefit Analysis_Kerang to OP Dorjila Road
9
DPR Cover Page_Kerang to OP Dorjila Road
10
DPR_Kerang to OP Dorjila Road
11
Digital Map_Kerang to OP Dorjila Road
12
EDS Raised By Nodal Officer_Kerang to OP Dorjila Road
13
Form A_Kerang to OP Dorjila Road
14
FRA Certificate_Kerang to OP Dorjila Road
15
Front Page FCA_Kerang to OP Dorjila Road
16
Georeference Map_Kerang to OP Dorjila Road
17
Forest Joint Inspection Report_Kerang to OP Dorjila Road
18
justification Letter_Kerang to OP Dorjila Road
19
Forest Enumeration List_Kerang to OP Dorjila Road
20
KML Files_Kerang to OP Dorjila Road
21
Muck Disposal Plan_Kerang to OP Dorjila Road
22
Revenue Department Joint Inspection Report_Kerang to OP Dorjila Road
23
Road Buffer 18m_Kerang to OP Dorjila Road
24
Rough Sketch Map_Kerang to OP Dorjila Road
25
Acknowledgement Slip
Print