Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/150531/2021
|
1(88)/23
|
Construction Of Road and 60 m Span Bridge From Village Devipura To gyanpurgodi in Nanakmatta Constancy under TSP
|
Road
|
District Youth Services & Sports Hamirpur
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
27 Aug 2024
|
2
|
Uttarakhand
|
FP/UK/ROAD/12372/2015
|
01(267)/2016
|
Construction of Pandavthali Uchola Mana Motor Road under District Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 May 2015
|
Stage-I Approval on
|
:
|
13 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2023
|
|
|
|
06 Nov 2023
|
3
|
Uttarakhand
|
FP/UK/ROAD/39862/2019
|
1(150)/2020
|
Construction of Gwaldam to Center School Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.981
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
07 Jun 2023
|
4
|
Uttarakhand
|
FP/UK/ROAD/16816/2015
|
1(33)/2017
|
Construction of Ghatora to Jhar Sirtoli Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.97
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2015
|
Stage-I Approval on
|
:
|
26 Jul 2017
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2022
|
|
|
|
04 May 2023
|
5
|
Uttarakhand
|
FP/UK/ROAD/11194/2015
|
1(339)/2015
|
Kaljikhal To Saknibadi motor road
|
Road
|
EXECUTIVE ENGINEER PMGSY DIV PWD SATPULI
|
4.427
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2015
|
Stage-I Approval on
|
:
|
31 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2023
|
|
|
|
23 Feb 2023
|
6
|
Uttarakhand
|
FP/UK/ROAD/7706/2014
|
1(140)/15
|
Berat Beran to Bagot motor road
|
Road
|
P.M.G.S.Y Didihat
|
1.44
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2014
|
Stage-I Approval on
|
:
|
12 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Nov 2022
|
|
|
|
22 Dec 2022
|
7
|
Uttarakhand
|
FP/UK/ROAD/34843/2018
|
1(205)/2020
|
Construction of 72 m span motor bridge over River Kosi in Era Jorasi Motor Road.
|
Road
|
EXECUTIVE ENGINEER
|
0.597
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2018
|
Stage-I Approval on
|
:
|
21 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2022
|
|
|
|
25 Nov 2022
|
8
|
Uttarakhand
|
FP/UK/ROAD/26275/2017
|
01(78)/2017
|
Koti Band to Budali Danda motor road
|
Road
|
PWD
|
0.4725
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2017
|
Stage-I Approval on
|
:
|
23 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
15 Sep 2022
|
|
|
|
22 Sep 2022
|
9
|
Uttarakhand
|
FP/UK/ROAD/43073/2019
|
1(128)/2020
|
Dhundsir Shivalya Link Motor road
|
Road
|
PWD
|
0.566
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Dec 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
16 Sep 2022
|
10
|
Uttarakhand
|
FP/UK/Approach/47289/2020
|
2(08)/22
|
Construction of Approach Road for GAIL's Receiving Terminal (RT)
|
Approach Access
|
GAIL INDIA LIMITED
|
0.0132
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jul 2020
|
Stage-I Approval on
|
:
|
26 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
15 Sep 2022
|
11
|
Uttarakhand
|
FP/UK/ROAD/50755/2020
|
1(216)/2020
|
Gaumukh to Village Dobh (Patiyon) Motor road
|
Road
|
PWD
|
0.095
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2020
|
Stage-I Approval on
|
:
|
31 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
04 May 2022
|
12
|
Uttarakhand
|
FP/UK/WATER/134917/2021
|
02(35)/2021
|
Nada drinking water scheme
|
Drinking Water
|
CONSTRUCTION DIVISION UTTARAKHAND PAYJAL NIGAM
|
0.22
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Mar 2021
|
Stage-I Approval on
|
:
|
22 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2022
|
|
|
|
27 Apr 2022
|
13
|
Uttarakhand
|
FP/UK/WATER/43413/2019
|
2(34)/2021
|
Pitthuwala Dtrinking Water Supply Scheme
|
Drinking Water
|
EE CONSTRUCTION DIVISION UTTARAKHAND PAYJAL NIGAM DEHRADUN
|
0.03
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Dec 2019
|
Stage-I Approval on
|
:
|
01 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2022
|
|
|
|
27 Apr 2022
|
14
|
Uttarakhand
|
FP/UK/ROAD/10743/2015
|
1(54)/2016
|
Construction of Gauna-Bhanali Link motor road from Nizmula-Pana motor road and 90 mtr span steel girder motor bridge
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.855
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Apr 2015
|
Stage-I Approval on
|
:
|
26 May 2016
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2022
|
|
|
|
26 Apr 2022
|
15
|
Uttarakhand
|
FP/UK/ROAD/7840/2014
|
1(37)/15
|
Charma Jaurasi To Bajani Motor Road
|
Road
|
P.M.G.S.Y Didihat
|
1.6542
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2014
|
Stage-I Approval on
|
:
|
27 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2022
|
|
|
|
22 Apr 2022
|
16
|
Uttarakhand
|
FP/UK/ROAD/42386/2019
|
1(23)/2020
|
Construction of Pandeygaon to Bhakar Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.875
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2019
|
Stage-I Approval on
|
:
|
27 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2022
|
|
|
|
18 Apr 2022
|
17
|
Uttarakhand
|
FP/UK/ROAD/45386/2020
|
1(58)/21
|
soda saroli main road to shirwalgarh village
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.2625
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 May 2020
|
Stage-I Approval on
|
:
|
04 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2022
|
|
|
|
05 Apr 2022
|
18
|
Uttarakhand
|
FP/UK/ROAD/22231/2016
|
1(34)/2018
|
Hindolakhal Payalgoan Motor road to Bitula, Noatha, Devali and Dalmasa waya Hindolakhal Mulyagoan Motor road
|
Road
|
PWD
|
0.711
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2016
|
Stage-I Approval on
|
:
|
19 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2022
|
|
|
|
05 Apr 2022
|
19
|
Uttarakhand
|
FP/UK/ROAD/42439/2019
|
1(21)/2021
|
Karnaprayag Nauti Paithani M/R to Dewalgarhsari M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.37
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2019
|
Stage-I Approval on
|
:
|
26 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Dec 2021
|
|
|
|
28 Mar 2022
|
20
|
Uttarakhand
|
FP/UK/WATER/41254/2019
|
2(12)/2020
|
Construction of Haldwani talli water supply scheme.
|
Drinking Water
|
EE WORLD BANK PROJECT UNIT UTTARAKHAND PEYJAL NIGAM
|
0.137
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2019
|
Stage-I Approval on
|
:
|
29 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2022
|
|
|
|
21 Mar 2022
|
21
|
Uttarakhand
|
FP/UK/Others/149185/2021
|
2(42)/2021
|
BSNL 03 MOBILE TOWERS INSTALLATION
|
Others
|
AGM (CM) BSNL DEHRADUN
|
0.0425
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2021
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2022
|
|
|
|
16 Mar 2022
|
22
|
Uttarakhand
|
FP/UK/ROAD/49082/2020
|
1(64)/21
|
Walmara to Satarh(kahedgaon) MR Stage I under PMGSY
|
Road
|
PIU SULT PMGSY
|
0.9331
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2020
|
Stage-I Approval on
|
:
|
21 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Dec 2021
|
|
|
|
30 Dec 2021
|
23
|
Uttarakhand
|
FP/UK/WATER/121733/2021
|
2(23)/2021
|
Construction of Over Head Tank at Banswada Balawala Dehradun
|
Drinking Water
|
UTTARAKHAND JAL SANSTHAN RAIPUR
|
0.0625
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
Stage-I Approval on
|
:
|
06 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2021
|
|
|
|
24 Dec 2021
|
24
|
Uttarakhand
|
FP/UK/ROAD/19447/2016
|
1(317)/2016
|
Gyansu Sald motor road to Gamdid gaon- Latur gaon motor road.
|
Road
|
EXECUTIVE ENGINEER PD PWD UTTARKASHI
|
0.9825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2016
|
Stage-I Approval on
|
:
|
30 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2021
|
|
|
|
17 Dec 2021
|
25
|
Uttarakhand
|
FP/UK/ROAD/11610/2015
|
1(381)/2015
|
Malldoba to Naoghar State Motor Road
|
Road
|
EXICUTIVE ENGINEER
|
3.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2015
|
Stage-I Approval on
|
:
|
31 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2021
|
|
|
|
16 Dec 2021
|
26
|
Uttarakhand
|
FP/UK/WATER/41586/2019
|
2(32)/2020
|
Fedan Rayagi Drinking water supply scheme
|
Drinking Water
|
CONSTRUCTION DIVISION UTTARAKHAND PAYJAL NIGAM
|
0.059
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Aug 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2021
|
|
|
|
16 Dec 2021
|
27
|
Uttarakhand
|
FP/UK/ROAD/10355/2015
|
1(163)/15
|
construction of Bagoli to Chula motor road under PMGSY
|
Road
|
PMGSY
|
2.118
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2015
|
Stage-I Approval on
|
:
|
22 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2021
|
|
|
|
14 Dec 2021
|
28
|
Uttarakhand
|
FP/UK/ROAD/43062/2019
|
1(140)/2020
|
Toli_Bhood km 3.00 to Ghore ki Dandi MR
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.405
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2019
|
Stage-I Approval on
|
:
|
16 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2021
|
|
|
|
18 Nov 2021
|
29
|
Uttarakhand
|
FP/UK/WATER/124331/2021
|
2(16)/2021
|
Construction of Gumaniwala Water Supply Scheme (Peri Urban)
|
Drinking Water
|
UTTARAKHAND JAL SANSTHAN RISHIKESH
|
0.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2021
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Sep 2021
|
|
|
|
17 Nov 2021
|
30
|
Uttarakhand
|
FP/UK/ROAD/40911/2019
|
1(134)/2020
|
Construction of Harmani Karchuda Motor Road Km.1 to Vinagaun - Jhangorgaun - SC Basti Harmani - Harmani Talli Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.785
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jul 2019
|
Stage-I Approval on
|
:
|
12 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2021
|
|
|
|
04 Oct 2021
|
31
|
Uttarakhand
|
FP/UK/ROAD/44236/2020
|
1(141)/2020
|
CONSTRACTION OF KARNATAK KHOLA TO RAILAPALI AND CONNECTING SARKAR KI AALI TO VIKASH BHAWAN MOTER ROAD LENGTH 3.00KM
|
Road
|
EXECUTIVE ENGINEER
|
0.925
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2020
|
Stage-I Approval on
|
:
|
15 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2021
|
|
|
|
23 Aug 2021
|
32
|
Uttarakhand
|
FP/UK/IRRIG/8805/2014
|
1(246)/2016
|
Construction of Siyagad Canal
|
Irrigation
|
UTTARAKHAND IRRIGATION DEPARTMENT
|
0.231
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2015
|
Stage-I Approval on
|
:
|
17 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2021
|
|
|
|
13 Aug 2021
|
33
|
Uttarakhand
|
FP/UK/WATER/64675/2020
|
02(54)/2020
|
Jeevangarh Peri Urban Water Supply Scheme
|
Drinking Water
|
UTTARAKHAND JAL SANSTHAN
|
0.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2020
|
Stage-I Approval on
|
:
|
13 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2021
|
|
|
|
11 Aug 2021
|
34
|
Uttarakhand
|
FP/UK/ROAD/10151/2015
|
1(354)/2015
|
Bageshwar-Tallisera to Simtoli Motor Road
|
Road
|
EXICUTIVE ENGINEER
|
4.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2015
|
Stage-I Approval on
|
:
|
29 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Apr 2021
|
|
|
|
13 Jul 2021
|
35
|
Uttarakhand
|
FP/UK/ROAD/42393/2019
|
1(09)/2020
|
construction of nagrashu dandakhal MR km 15.00 to kwali (gadbu)
|
Road
|
PMGSY
|
0.8075
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Oct 2019
|
Stage-I Approval on
|
:
|
03 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2021
|
|
|
|
05 Jul 2021
|
36
|
Uttarakhand
|
FP/UK/ROAD/10576/2015
|
1(532)/2015
|
Rawatsera-Manakbhara Motor Road
|
Road
|
EXICUTIVE ENGINEER
|
4.124
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2015
|
Stage-I Approval on
|
:
|
08 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
12 Apr 2021
|
|
|
|
02 Jul 2021
|
37
|
Uttarakhand
|
FP/UK/ROAD/43884/2020
|
1(58)/2020
|
L031 Chailusain-Devikhet MR Km 5 to Bamoli MR Km 4.825
|
Road
|
PMGSY DUGADDA
|
0.437
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2020
|
Stage-I Approval on
|
:
|
09 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2022
|
|
|
|
02 Jul 2021
|
38
|
Uttarakhand
|
FP/UK/TRANS/47915/2020
|
2(35)/2020
|
Tower shifting of 132 KV Chila-Nazibabad Transmission Line
|
Transmission Line
|
POWER TRANSMISSION CORPORATION OF UTTRAKHAND LTD.
|
0.3969
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2020
|
Stage-I Approval on
|
:
|
17 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Mar 2021
|
|
|
|
21 Jun 2021
|
39
|
Uttarakhand
|
FP/UK/ROAD/30385/2017
|
292/x-4-18/1(66)/2018
|
Badshahithaul to saundkoti Lamkot Motor Road
|
Road
|
PMGSY ID IIND NEW TEHRI
|
0.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2017
|
Stage-I Approval on
|
:
|
27 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 Mar 2021
|
|
|
|
04 Jun 2021
|
40
|
Uttarakhand
|
FP/UK/ROAD/38453/2019
|
1(165)/2020
|
Masi-Gairkhet to Parthola Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.837
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2019
|
Stage-I Approval on
|
:
|
29 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Feb 2021
|
|
|
|
15 Apr 2021
|
41
|
Uttarakhand
|
FP/UK/ROAD/40356/2019
|
1(151)
|
Darimkhola to Sakaniyakot Motor Road (Link Road) Under PMGSY
|
Road
|
PMGSY
|
0.455
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 May 2019
|
Stage-I Approval on
|
:
|
26 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2021
|
|
|
|
30 Mar 2021
|
42
|
Uttarakhand
|
FP/UK/ROAD/42092/2019
|
1(139)/2020
|
Shitlakhet Bora State To Syahi devi Temple Motor Road in Disst. Almora Length 3.800KM
|
Road
|
EXECUTIVE ENGINEER
|
0.125
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2019
|
Stage-I Approval on
|
:
|
14 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2021
|
|
|
|
23 Mar 2021
|
43
|
Uttarakhand
|
FP/UK/ROAD/10484/2015
|
1(549)/2016
|
Dewaldhar to Kalchunda Motor Road under PMGSY
|
Road
|
RES PMGSY KARANPERAYAG
|
2.853
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2015
|
Stage-I Approval on
|
:
|
30 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2020
|
|
|
|
22 Dec 2020
|
44
|
Uttarakhand
|
FP/UK/WATER/45024/2020
|
2(23)/2020
|
Upper Garhwali Drinking Water Scheme
|
Drinking Water
|
UTTARAKHAND JAL SANSTHAN RAIPUR
|
0.075
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2020
|
Stage-I Approval on
|
:
|
10 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2020
|
|
|
|
22 Dec 2020
|
45
|
Uttarakhand
|
FP/UK/SubStation/44563/2020
|
2(30)/2020
|
GIS substation
|
Sub Station
|
E.D.D KOTDWARA
|
0.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2020
|
Stage-I Approval on
|
:
|
04 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2020
|
|
|
|
21 Dec 2020
|
46
|
Uttarakhand
|
FP/UK/ROAD/29708/2017
|
1(136)/2017
|
construction of Bhanj-Gwad-Machkandi motor road
|
Road
|
EECDPWDUKM
|
0.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2017
|
Stage-I Approval on
|
:
|
09 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2019
|
|
|
|
11 Dec 2020
|
47
|
Uttarakhand
|
FP/UK/ROAD/9887/2015
|
1(378)/2015
|
Gadwal Gad Motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
2.681
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2015
|
Stage-I Approval on
|
:
|
31 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2018
|
|
|
|
25 Nov 2020
|
48
|
Uttarakhand
|
FP/UK/ROAD/9173/2015
|
1(50)/15
|
Ghatta Bagad to Tankul Motor Road
|
Road
|
PMGSY
|
2.056
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
Stage-I Approval on
|
:
|
30 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jul 2018
|
|
|
|
05 Nov 2020
|
49
|
Uttarakhand
|
FP/UK/ROAD/11865/2015
|
1(264)/2015
|
maurnaula -jaiti motor road km 21 to chaukuna motor road
|
Road
|
PMGSY
|
4.004
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2015
|
Stage-I Approval on
|
:
|
01 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2019
|
|
|
|
05 Nov 2020
|
50
|
Uttarakhand
|
FP/UK/ROAD/33331/2018
|
329/X-4-7/1(35)/2017
|
Dwarahat Someshwar to Almiyagaon Motor road, Length 3.00, Block Dwarahat, Distt. Almora, Legislative assembly area Dwarahat.
|
Road
|
PMGSY
|
0.605
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2018
|
Stage-I Approval on
|
:
|
31 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2019
|
|
|
|
05 Nov 2020
|
|