Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/WATER/30357/2017
|
G.O.Rt.No.77
|
Hindupur Muncipality - Comprehensive Water Supply Improvement Scheme as a source of Gollapalli Reservoir under AMRUT
|
Drinking Water
|
SUPERINTENDING ENGINEER PUBLIC HEALTH ANANTAPUR
|
0.405
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2017
|
Stage-I Approval on
|
:
|
13 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 May 2021
|
|
|
|
07 Jan 2022
|
2
|
Andhra Pradesh
|
FP/AP/TRANS/22375/2016
|
GO.Rt.No.87, Dt:17.04.2017
|
33 KV Transmission Line
|
Transmission Line
|
APSPDCL DHONE
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2016
|
Stage-I Approval on
|
:
|
17 Apr 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2017
|
|
|
|
01 Aug 2017
|
3
|
Andhra Pradesh
|
FP/AP/ROAD/10475/2015
|
3343/ Section-II/2016
|
Rehabilitation & upgradation of NH-221 from km 32/735 to 71/200.
|
Road
|
HIGHWAYS
|
0.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Apr 2016
|
Stage-I Approval on
|
:
|
25 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2016
|
|
|
|
16 Feb 2017
|
4
|
Assam
|
FP/AS/OFC/155167/2022
|
ECF No.278364
|
Laying of Optical Fibre Cable at Sonowal Mariani Assam
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
06 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2024
|
|
|
|
20 Mar 2024
|
5
|
Assam
|
FP/AS/OFC/116541/2020
|
FRS.2/2022
|
Digboi-Duliajan NLD Optical Fiber Route Project
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOM LTD
|
0.915
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2020
|
Stage-I Approval on
|
:
|
18 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jun 2024
|
|
|
|
16 Dec 2023
|
6
|
Assam
|
FP/AS/ROAD/152364/2022
|
FRS.100/2022
|
Development and Improvement of Jagun Namchik Mioa Road (Assam Portion) including Bridge No. 9/1 over River Namchik in Tinsukia District
|
Road
|
DIGBOI AND MARGHERITA TERRITORIAL ROAD DIVISION
|
0.09563
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2022
|
Stage-I Approval on
|
:
|
11 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2023
|
|
|
|
12 Jul 2023
|
7
|
Assam
|
FP/AS/OFC/73279/2020
|
FRS.121/2021
|
Kaliabor Tezpur OFC Route
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOM LTD
|
0.092
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2020
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2022
|
|
|
|
11 Jul 2022
|
8
|
Bihar
|
FP/BR/Pipeline/45173/2020
|
Van Bhumi 112/2020
|
City Gas distribution network in (Khagaria, Saharsa and Madhepura)
|
Pipeline
|
Indian Oil Corporation Limited
|
1.22603
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2020
|
Stage-I Approval on
|
:
|
31 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
07 Sep 2021
|
9
|
Bihar
|
FP/BR/ROAD/44225/2020
|
van Bhumi 32/2020
|
To access the Xuan Zang Memorial hall only existing road is available, which is required to be widened
|
Road
|
REGISTRAR NAVA NALANDA MAHAVIHARA (DEEMED UNIVERSITY) NALANDA
|
1.4175
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jan 2020
|
Stage-I Approval on
|
:
|
05 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2021
|
|
|
|
08 Jul 2021
|
10
|
Bihar
|
FP/BR/Pipeline/44859/2020
|
Van Bhumi 138/2020
|
City Gas Distribution Project Jamui & Sheikhpura
|
Pipeline
|
Indian Oil Corporation Limited
|
1.6347453
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Feb 2020
|
Stage-I Approval on
|
:
|
19 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2021
|
|
|
|
01 Jul 2021
|
11
|
Bihar
|
FP/BR/TRANS/36604/2018
|
Van Bhumi 69/2020
|
400 kV DC (Tripple Snowbird) Sitamarhi - Motihari TL
|
Transmission Line
|
POWERGRID MITHILANCHAL TRANSMISSIOM LTD SITAMARHI
|
0.1852
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2018
|
Stage-I Approval on
|
:
|
22 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2020
|
|
|
|
21 Jan 2021
|
12
|
Bihar
|
FP/BR/Others/42540/2019
|
FC/79/2019
|
Permission for laying Optical Fiber Cable in different section in District Jamui 8 Block Sono, Jhajha, Sikndra, Chakai, Laxmipur Aliganj Khaira, Jamui Length of 618157 MTR
|
Others
|
M/S VINDHYA TELELINKS LIMITED
|
0.928803
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
Stage-I Approval on
|
:
|
10 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Apr 2020
|
|
|
|
21 Apr 2020
|
13
|
Bihar
|
FP/BR/Others/42542/2019
|
FC/80/2019
|
Permission for laying Optical Fiber Cable in different section in District Bank 8 Block Katoriya, Dhoraiya, Chandan, Baushi Fullidumer, Belhar, Barahat, Banka Total Length of 665510 MTR
|
Others
|
M/S VINDHYA TELELINKS LIMITED
|
2.86701
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
Stage-I Approval on
|
:
|
10 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Apr 2020
|
|
|
|
21 Apr 2020
|
14
|
Chandigarh
|
FP/CH/Others/33464/2018
|
953
|
Street Lighting
|
Others
|
EXECUTIVE ENGINEER ELECTRICAL DIVISION NO I CHANDIGARH
|
0.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2018
|
Stage-I Approval on
|
:
|
16 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2021
|
|
|
|
05 Apr 2021
|
15
|
Chandigarh
|
FP/CH/Others/38318/2019
|
2318
|
Providing street lights on Jungle road Dhanas
|
Others
|
MUNICIPAL COORPORATION CHANDIGARH
|
0.0468
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2019
|
Stage-I Approval on
|
:
|
22 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2021
|
|
|
|
07 Aug 2020
|
16
|
Chandigarh
|
FP/CH/TRANS/31962/2018
|
26/6/18
|
Construction of 220 KV U/G cable T/L at Hallomajra GIS CHD
|
Transmission Line
|
POWERGRID FATEHGARH TRANSMISSION LIMITED
|
0.1672
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2018
|
Stage-I Approval on
|
:
|
05 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2021
|
|
|
|
23 Jul 2018
|
17
|
Chandigarh
|
FP/CH/TRANS/29650/2017
|
FOR/18/4253
|
Construction of 220 KV U/G Cable T/L at HalloMajra GIS CHD
|
Transmission Line
|
POWERGRID FATEHGARH TRANSMISSION LIMITED
|
0.1962
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2017
|
Stage-I Approval on
|
:
|
23 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2021
|
|
|
|
15 May 2018
|
18
|
Chandigarh
|
FP/CH/Others/16272/2015
|
For/16/160
|
City Gas Distribution Project Chandigarh
|
Others
|
INDIAN OIL ADANI GAS PVT LTD
|
0.0228
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2015
|
Stage-I Approval on
|
:
|
26 May 2016
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2016
|
|
|
|
27 Jun 2016
|
19
|
Chhattisgarh
|
FP/CG/Others/43957/2020
|
F-5-1-2020/10-2
|
Govt. Medical College Telgara Dist Kanker
|
Others
|
CHIEF MEDICAL & HEALTH OFFICER
|
30.529
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2020
|
Stage-I Approval on
|
:
|
07 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2024
|
|
|
|
11 Jul 2024
|
20
|
Chhattisgarh
|
FP/CG/Others/43957/2020
|
F-5-1-2020/10-2
|
Govt. Medical College Telgara Dist Kanker
|
Others
|
CHIEF MEDICAL & HEALTH OFFICER
|
30.529
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2020
|
Stage-I Approval on
|
:
|
07 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2024
|
|
|
|
11 Jul 2024
|
21
|
Dadar & Nagar Haveli
|
FP/DN/VELEC/29928/2017
|
7-5/3-FD/604/
|
Installation of HT line at Bildhari-Ruimal
|
Village Electricity
|
DNHPDCL
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2017
|
Stage-I Approval on
|
:
|
26 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2024
|
|
|
|
08 Aug 2024
|
22
|
Dadar & Nagar Haveli
|
FP/DN/VELEC/30058/2017
|
DN-027/2017
|
Erection of 100KVA Transformer center with HT line at village Sindoni-Loharmal
|
Village Electricity
|
DNHPDCL
|
0.91
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Nov 2017
|
Stage-I Approval on
|
:
|
26 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2024
|
|
|
|
08 Aug 2024
|
23
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/151726/2022
|
7-5/3-FD/654
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Kala – Karachgam – Velugam Industrial Area Connectivity & Near Namo Medical Collage Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.3009
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2022
|
Stage-I Approval on
|
:
|
20 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Oct 2023
|
|
|
|
23 Jan 2024
|
24
|
Dadar & Nagar Haveli
|
FP/DN/Others/149878/2021
|
7-2/3-FD/653
|
Bhilosa Private Limited Pipeline
|
Others
|
GUJARAT STATE PETRONET LTD
|
0.4098
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2021
|
Stage-I Approval on
|
:
|
31 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
07 Nov 2023
|
25
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/147607/2021
|
7-2/3-FD/650
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Surangi – Velugam Road, Surangi Connectivity, River crossing at Surangi – Velugam Road, Surangi Connectivity & River crossing at Udhawa – Khanvel
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.0735
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2021
|
Stage-I Approval on
|
:
|
05 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Dec 2022
|
|
|
|
06 Apr 2023
|
26
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/36313/2018
|
7-5/3-FD/629
|
Diversion of protected forest land for the widening of existing 4 lane to 6 lane road stretch on Silvassa - Naroli road under Beautification & strenghthening of road including up gradation of storm wa
|
Road
|
EXECUTIVE ENGINEER ROAD DIVISION
|
0.772
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Oct 2018
|
Stage-I Approval on
|
:
|
24 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2023
|
|
|
|
06 Apr 2023
|
27
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/148523/2021
|
7-5/3-FD/652/
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Anklas – Nagvas village & Looping DNH (PE) Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.0418
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2021
|
Stage-I Approval on
|
:
|
30 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2023
|
|
|
|
06 Apr 2023
|
28
|
Dadar & Nagar Haveli
|
FP/DN/TRANS/145817/2021
|
7-5/3-FD/645/
|
Erection of underground 11 KV transmission line of M/s Jai Corp Ltd
|
Transmission Line
|
JAI CORP LTD
|
0.135
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2021
|
Stage-I Approval on
|
:
|
24 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2022
|
|
|
|
06 Apr 2023
|
29
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/47191/2020
|
7-5/3-FD/637
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Rockwool India Ltd. Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.167
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
Stage-I Approval on
|
:
|
25 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2022
|
|
|
|
14 Sep 2022
|
30
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/149192/2021
|
F.No. 7-2/3-FD/651
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Mandoni Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.426
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2021
|
Stage-I Approval on
|
:
|
19 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2022
|
|
|
|
14 Sep 2022
|
31
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/124427/2021
|
7-5/3-FD/644
|
Silvassa Spur Pipeline
|
Pipeline
|
PIPELINE INFRASTRUCTURE LIMITED
|
0.1278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2021
|
Stage-I Approval on
|
:
|
20 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Dec 2021
|
|
|
|
15 Nov 2021
|
32
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/44305/2020
|
7-5/3-FD/636
|
Gas Distribution Network in Dadra & Nagar Haveli Area (Maliba (HPCL) Petroleum Connectivity, Mahalaxmi Petroleum Connectivity & Khanvel Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.5029
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2020
|
Stage-I Approval on
|
:
|
12 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2021
|
|
|
|
19 Nov 2020
|
33
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/44749/2020
|
7-5/3-FD/635
|
Gas Distribution Network in Dadra & Nagar Haveli Area (KLJ Plasticizers Ltd. (Sili) CA-1 Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.2446
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2020
|
Stage-I Approval on
|
:
|
12 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2021
|
|
|
|
19 Nov 2020
|
34
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30019/2017
|
7-5/3-FD/595
|
Diversion of protected forest area for the Integrated Water Management Plan WD-III for Amboli , Kala, Karachgam , Kherdi , Parzai & Dolara village
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.997
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2017
|
Stage-I Approval on
|
:
|
05 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2023
|
|
|
|
23 Oct 2020
|
35
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30043/2017
|
7-5/3-FD/594
|
Diversion of protected forest area for the Integrated Water Management Plan WD-III for Khadoli , Tinoda & Bindrabin village.
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.951
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2017
|
Stage-I Approval on
|
:
|
05 Nov 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2023
|
|
|
|
01 Oct 2020
|
36
|
Dadar & Nagar Haveli
|
FP/DN/WATER/24717/2017
|
7-5/3-FD/592
|
Diversion of Protected forest area for the Integrated Water Management Plan WD-III for Khanvel , Chauda & Rudana Patelad
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2017
|
Stage-I Approval on
|
:
|
05 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2023
|
|
|
|
30 Sep 2020
|
37
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30051/2017
|
7-5/3-FD/593
|
Diversion of protected forest area for the Integrated Water Management Plan WD-III for Surangi , Apti & Velugam village
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.713
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2017
|
Stage-I Approval on
|
:
|
01 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2023
|
|
|
|
24 Jul 2020
|
38
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30803/2017
|
DN-037/2017
|
Diversion of protected forest area for the Integrated Water Management Plan WD-II for Mota Randha, Nana Randha and Bonta village
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.89
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Dec 2017
|
Stage-I Approval on
|
:
|
18 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
08 May 2020
|
39
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30609/2017
|
DN-038/2017
|
Diversion of protected forest area for the Integrated Water Management Plan WD-II for Umarkui , Saily and Rakholi village.
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Dec 2017
|
Stage-I Approval on
|
:
|
18 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
08 Apr 2020
|
40
|
Dadar & Nagar Haveli
|
FP/DN/WATER/19445/2016
|
7-5/3-FD/565
|
Providing drinking water supply scheme for Gunsa and Bildhari
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.4125
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 May 2016
|
Stage-I Approval on
|
:
|
30 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
08 Feb 2018
|
|
|
|
08 Apr 2020
|
41
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/34241/2018
|
7-5/3-FD/613
|
Diversion of Reserved forest land for the Construction of road from Bildhari Patelpada to Ruimal
|
Road
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.87
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2018
|
Stage-I Approval on
|
:
|
05 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2020
|
|
|
|
19 Mar 2020
|
42
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/40212/2019
|
7-5/3-FD/632/
|
Bhilosa Industries Connectivity
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.323
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2019
|
Stage-I Approval on
|
:
|
22 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2021
|
|
|
|
12 Mar 2020
|
43
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/35449/2018
|
7-5/3-FD/622
|
Diversion of Reserved forest land for Construction of an approach road from Chisda to Shelti Vanganpada
|
Road
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.798
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Aug 2018
|
Stage-I Approval on
|
:
|
19 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
07 Feb 2020
|
44
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/33515/2018
|
7-5/3-FD/609
|
Diversion of Reserved forest land for the Construction of approach road from Bedpa Kalsemal to Maharasthra Border
|
Road
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.618
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 May 2018
|
Stage-I Approval on
|
:
|
11 Jun 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
07 Feb 2020
|
45
|
Dadar & Nagar Haveli
|
FP/DN/Others/32949/2018
|
7-5/3-FD/630
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Dadra Nagar Haveli District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
4.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Apr 2018
|
Stage-I Approval on
|
:
|
06 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2020
|
|
|
|
14 Jan 2020
|
46
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/43020/2019
|
7-5/3-FD/633
|
Construction of Bypass road from Dudhani-Ghodbari Junction to the newly constructed Dudhnai - Kauncha HIgh Level Bridge
|
Road
|
EXECUTIVE ENGINEER ROAD DIVISION
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2019
|
Stage-I Approval on
|
:
|
27 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2023
|
|
|
|
08 Jan 2020
|
47
|
Dadar & Nagar Haveli
|
FP/DN/Others/35702/2018
|
7-5/3-FD/624/
|
Gas Distribution network for Chikhli, Surangi, Khadoli, Khanvel, Kala & Kherdi Village Surrounding Area Dadra and Nagar Haveli
|
Others
|
GUJARAT GAS LIMITED
|
0.7608
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2018
|
Stage-I Approval on
|
:
|
08 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2019
|
|
|
|
07 Jan 2020
|
48
|
Dadar & Nagar Haveli
|
FP/DN/WATER/30025/2017
|
7-5/3-FD/591
|
Diversion of protected forest area for the Integrated Water Management Plan WD-III for Umarvani,Khutali, Khanvel , Talavli & Shelti village.
|
Drinking Water
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.989
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2017
|
Stage-I Approval on
|
:
|
12 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
14 Dec 2019
|
49
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/33504/2018
|
7-5/3-FD/611
|
Construction of approach road from Sindoni Patelpada to Samashan
|
Road
|
EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI
|
0.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 May 2018
|
Stage-I Approval on
|
:
|
01 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2019
|
|
|
|
05 Dec 2019
|
50
|
Dadar & Nagar Haveli
|
FP/DN/Others/30063/2017
|
7-5/3-FD/596
|
Athola Connectivity - DNH GA 2017-18
|
Others
|
GUJARAT GAS LIMITED
|
0.202
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2017
|
Stage-I Approval on
|
:
|
16 Apr 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2019
|
|
|
|
05 Nov 2019
|
|