Ministry of Environment,Forest and Climate Change
Government of India
Chhattisgarh
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Chhattisgarh FP/CG/ROAD/35248/2018 FC-II/IROCH-11/2022 Panduka Mudagaon Road Road PROJECT DIRECTOR CSRSP PWD RAIPUR 24.569 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Aug 2018
Stage-I Approval on : 12 Oct 2022
Compliance Report Submitted by User Agency on : 27 Dec 2024
13 Jan 2025
2 Chhattisgarh FP/CG/ROAD/39744/2019 FC-I/IROCH-03/2021 NTPC Road widening Road NTPC TALAIPALLI COAL MINING PROJECT 1.732 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2019
Stage-I Approval on : 23 Feb 2021
Compliance Report Submitted by User Agency on : 05 Apr 2021
21 Dec 2021
3 Chhattisgarh FP/CG/ROAD/24943/2017 FC-II/IROCH-09/2021 Lohara-Rengadabri-Chowki Road Road CHHATTISGARH ROAD DEVELOPMENT CORPORATION LIMITED RAIPUR 5.53 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2017
Stage-I Approval on : 11 Oct 2021
Compliance Report Submitted by User Agency on : 18 Dec 2021
16 Feb 2022
4 Chhattisgarh FP/CG/ROAD/145443/2021 FC-I/IROCH-10/2022 CONTRUSTION OF NEW ROAD Road SBJ PROJECTS PRIVATE LIMTTED 0.2091 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jul 2021
Stage-I Approval on : 19 Apr 2022
Compliance Report Submitted by User Agency on : 30 Jun 2022
23 Nov 2022
5 Chhattisgarh FP/CG/RAIL/35461/2018 FC-II/IROCH-04/2020 NTPC Talaipalli Coal Mining Project Railway NTPC Limited 8.795 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Aug 2018
Stage-I Approval on : 31 Mar 2021
Compliance Report Submitted by User Agency on : 30 Jun 2021
21 Dec 2021
6 Chhattisgarh FP/CG/Others/25041/2017 FC-I/IROCH-02/2020 Kudargarh Ropeway Others CHHATTISGARH TOURISM BOARD 0.797 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Mar 2017
Stage-I Approval on : 17 Nov 2020
Compliance Report Submitted by User Agency on : 22 Jan 2022
21 Dec 2021
7 Chhattisgarh FP/CG/RAIL/32194/2018 FC-III/IROCH-05/2022 EAST RAIL CORRIDOR, CHHATTISGARH RAIL PROJECT. Railway CHHATTISGARH EAST RAILWAY LTD. 157.035 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Feb 2018
Stage-I Approval on : 02 Mar 2023
Compliance Report Submitted by User Agency on : 07 Mar 2025
13 Mar 2025
8 Chhattisgarh FP/CG/ROAD/28920/2017 FC-II-CH-89-2018-NGP Rehabilitation and Upgrading to 4- Lane with paved shoulders configuration of Bilaspur- Katghora Section of NH-111 in the State of Chhattisgarh. Pakage-I Bilaspur to Pathrapali (0+00 to 53+300) Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR 24.585 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Aug 2017
Stage-I Approval on : 14 Feb 2019
Compliance Report Submitted by User Agency on : 07 Nov 2023
27 Mar 2024
9 Chhattisgarh FP/CG/TRANS/18820/2016 FC-II/CH-69/2017-NGP 765 KV S?C CHAMPA DHARAMJAYGARH TRANSMISSION LINE Transmission Line CHHATTISGARH WR TRANSMISSION LIMITED 22.182 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Apr 2016
Stage-I Approval on : 21 Sep 2017
Compliance Report Submitted by User Agency on : 01 Mar 2018
02 Jun 2018
10 Chhattisgarh FP/CG/TRANS/22047/2016 FC-III/CH-27/2018-NGP Construction of Proposed 132kv Nagri-Indagaon Transmission Line Transmission Line C.S.P.T.C.L 111.456 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Oct 2016
Stage-I Approval on : 06 Jun 2018
Compliance Report Submitted by User Agency on : 10 Aug 2022
17 Nov 2022
11 Chhattisgarh FP/CG/MIN/39334/2019 8-15/2021-FC Vol. CHHAL OPENCAST SEAM III 6 MTY Mining SOUTH EASTERN COALFIELDS LIMITED 55.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Mar 2019
Stage-I Approval on : 06 Jul 2022
Compliance Report Submitted by User Agency on : 29 Sep 2023
29 Jan 2024
12 Chhattisgarh FP/CG/ROAD/29577/2017 FC-II/IROCH-15/2023 CONSTRUCTION OF BYPASS ROAD AT KONDAGAON Road PUBLIC WORK DEPARTMENT 9.304 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2017
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 24 Jul 2023
18 Nov 2024
13 Chhattisgarh FP/CG/MIN/149564/2021 8-09/2023-FC Bhaskarpara Coal Mine Mining Prakash Industries Limited 515.581 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Nov 2021
Stage-I Approval on : 21 Aug 2023
Compliance Report Submitted by User Agency on : 12 Feb 2024
11 Jul 2024
14 Chhattisgarh FP/CG/Others/149523/2021 FC-I/IROCH-19/2023 Construction of high level bridge and approach road near CRPF Camp , Village - Birnasilli , Dist. - Dhamtari (Chhattisgarh) Others CHIEF ENGINEER, PWD BRIDGE ZONE, RAIPUR 0.828 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Nov 2021
Stage-I Approval on : 24 May 2023
Compliance Report Submitted by User Agency on : 07 Feb 2024
18 Mar 2024
15 Chhattisgarh FP/CG/TRANS/39462/2019 FC-II/IROCH-07/2021 : For providing 132 KV Supply from 132/33 KV Substation at Kondatarai to M/s NTPC Jurda (CG) Transmission Line CSPTCL 9.589 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Mar 2019
Stage-I Approval on : 07 Dec 2021
Compliance Report Submitted by User Agency on : 25 Jul 2024
30 Jan 2023
16 Chhattisgarh FP/CG/ROAD/122482/2021 FC-8/21/2023-IRO-RAIPUR Development of Economic Corridors Inter Corridors, Feeder Routes and National Corridors to improve the efficiency of freight movement in India under Bharatmala Pariyojana [Lot-3/Chhatishgarh /Package -1 (Urga – Pathalgaon Section of Raipur Dhanbad Economic Corridor)] Road National Highways Authority of India 169.0231 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jul 2021
Stage-I Approval on : 08 Feb 2024
Compliance Report Submitted by User Agency on : 21 Mar 2025
31 Mar 2025
17 Chhattisgarh FP/CG/MIN/20495/2016 8-06/2022-FC Gare Palma Sector II Coal Mine Mining MAHARASHTRA STATE POWER GENERATION CORPORATION LTD 214.869 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jul 2016
Stage-I Approval on : 02 Jun 2022
Compliance Report Submitted by User Agency on : 14 Dec 2022
27 Jan 2023
18 Chhattisgarh FP/CG/MIN/20495/2016 8-06/2022-FC Gare Palma Sector II Coal Mine Mining MAHARASHTRA STATE POWER GENERATION CORPORATION LTD 214.869 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jul 2016
Stage-I Approval on : 02 Jun 2022
Compliance Report Submitted by User Agency on : 14 Dec 2022
27 Jan 2023
19 Chhattisgarh FP/CG/Others/154619/2022 FC-II/IROCH-20/2023 Diversion of 15.6909 Ha. Forest Land (Reserved Forest, Protected Forest, Orange Forest And Revenue Forest) in Chhattisgarh State For non Forestry Purpose For Laying of Natural Gas Pipeline from Nagpur to Jharsuguda Under Mumbai- Nagpur-Jharsuguda Pipeline Project (MNJPL Project). Others GAIL INDIA LIMITED 15.6909 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Apr 2022
Stage-I Approval on : 24 May 2023
Compliance Report Submitted by User Agency on : 20 Sep 2023
21 Nov 2023
20 Chhattisgarh FP/CG/TRANS/43092/2019 FC-8/6/2023-IRO-RAIPUR Modification of 220 KV Transmission Line Transmission Line CSPTCL, KORBA 2.128 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Dec 2019
Stage-I Approval on : 26 Mar 2024
Compliance Report Submitted by User Agency on : 04 Oct 2024
20 Dec 2024
21 Chhattisgarh FP/CG/SubStation/145115/2021 FC-I/IROCH-23/2023 Diversion of Forest Land for Non-Forest Purpose at 132/33 KV Sub-Station at Keshkal. Sub Station CSPTCL 3.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jul 2021
Stage-I Approval on : 03 Jul 2023
Compliance Report Submitted by User Agency on : 23 Apr 2024
20 Dec 2024
22 Chhattisgarh FP/CG/ROAD/34338/2018 FC-III/IROCH-01/2021 Chhattisgarh, Lot-3 (Bilaspur -Urga Section) Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR 47.552 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2018
Stage-I Approval on : 15 Feb 2021
Compliance Report Submitted by User Agency on : 24 Jan 2024
02 Aug 2022
23 Chhattisgarh FP/CG/ROAD/37444/2018 FC-I/IROCH-09/2021 National Highway Authority of India (NHAI) , proposed Up-gradation of Champa-Korba-Chhuri-Katghora Section of NH-149B in the state of Chhattisgarh to two/ four lane with paved shoulder configuration, Package-I (0+00 to 38+150). Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR 4.493 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Feb 2019
Stage-I Approval on : 03 Jan 2022
Compliance Report Submitted by User Agency on : 23 Dec 2024
30 Apr 2025
24 Chhattisgarh FP/CG/ROAD/24377/2017 FC-II-CH-111-2019-NGP KEREGAON-GATTASILLI-BIRGIDI ROAD Road EE PWD DHAMTARI 25.147 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Feb 2017
Stage-I Approval on : 30 Sep 2019
Compliance Report Submitted by User Agency on : 02 Jun 2020
15 Jun 2020
25 Chhattisgarh FP/CG/ROAD/29243/2017 FC-III/CH-40/2019-NGP Rehabilitation and upgradation to 2 lane/ 4 lane of NH-930,Jhalmala-Balod-Kusumkasa-Manpur-Kohka in the state of Chhattishgarh. Road NATIONAL HIGHWAY DIVISION PWD CHHATTISHGARH 73.426 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Sep 2017
Stage-I Approval on : 13 Nov 2020
Compliance Report Submitted by User Agency on : 23 Dec 2021
21 Dec 2021
26 Chhattisgarh FP/CG/ROAD/32638/2018 FC-I/IROCH-20/2023 Rehabilitation & Upgrading of Dewari-Toreshingha Road Road PROJECT DIRECTOR CSRSP PWD RAIPUR 2.767 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Mar 2018
Stage-I Approval on : 28 Apr 2023
Compliance Report Submitted by User Agency on : 12 Sep 2023
28 Mar 2024
27 Chhattisgarh FP/CG/OFC/43975/2020 F 5-04/2022/10-2 Bharatnet Phase-II Barnawapara Sanctuary Optical Fibre Cable CHIPS 1.137 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jan 2020
Stage-I Approval on : 27 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
15 May 2025
28 Chhattisgarh FP/CG/TRANS/16561/2015 FC-I/CH-81/2017-NGP 132 kv dcds line from paraswani substation to railway traction mhasamund Transmission Line C.S.P.T.C.L 2.37 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Nov 2015
Stage-I Approval on : 23 Apr 2018
Compliance Report Submitted by User Agency on : 10 Aug 2022
28 Oct 2022
29 Chhattisgarh FP/CG/ROAD/119866/2021 FC-III/IROCH-04/2022 Development of Economic Corridors, Inter-corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot-3/Odisha & Jharkhand/Package-2) Raipur-Vishakhapatnam (Ch. 0.000 - Ch. 124.661) in the State of Chhattisgarh under Bharatmala Pariyojana. (Forest Proposal is for between km 42+844 to Km 124.661) Road NHAI PIU DHAMTARI 228.0425 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Jan 2021
Stage-I Approval on : 12 Apr 2022
Compliance Report Submitted by User Agency on : 04 Jul 2025
30 Chhattisgarh FP/CG/Others/25789/2017 FC-I/IROCH-05/2021 CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS KAJAL REVER Others PWD BRIDGE RAIPUR 1.701 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2017
Stage-I Approval on : 03 Jan 2022
Compliance Report Submitted by User Agency on : 06 Jul 2022
20 Jan 2023
31 Chhattisgarh FP/CG/Others/43957/2020 F-5-1-2020/10-2 Govt. Medical College Telgara Dist Kanker Others CHIEF MEDICAL & HEALTH OFFICER 30.529 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jan 2020
Stage-I Approval on : 07 Mar 2020
Compliance Report Submitted by User Agency on : 10 Jun 2024
11 Jul 2024
32 Chhattisgarh FP/CG/Others/43957/2020 F-5-1-2020/10-2 Govt. Medical College Telgara Dist Kanker Others CHIEF MEDICAL & HEALTH OFFICER 30.529 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jan 2020
Stage-I Approval on : 07 Mar 2020
Compliance Report Submitted by User Agency on : 10 Jun 2024
11 Jul 2024
33 Chhattisgarh FP/CG/HYD/25660/2017 FC-II-CH-115/2019-NGP Malka Renewable Energy Private Limited Hydel MALKA RENEWABLE ENERGY PRIVATE LIMITED 6.69 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Apr 2017
Stage-I Approval on : 15 Nov 2019
Compliance Report Submitted by User Agency on : 11 Apr 2022
02 Aug 2022
34 Chhattisgarh FP/CG/ROAD/40258/2019 FC-II/IROCH-06/2021 Construction of C.C. Road Hardibazar Bypass, Length 11.76 Km. (via Ratija, Renki , Bamhanikona, Saraishingar) Road EE PMGSY KORBA 15.4 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2019
Stage-I Approval on : 11 Oct 2021
Compliance Report Submitted by User Agency on : 24 Mar 2022
28 Dec 2022
35 Chhattisgarh FP/CG/Pipeline/151253/2022 FC-I/IROCH-18/2022 B S Sponge Pvt Ltd Laying of Pipeline Pipeline B.S.SPONGE PVT. LTD. 0.144 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jan 2022
Stage-I Approval on : 22 Dec 2022
Compliance Report Submitted by User Agency on : 17 Aug 2024
27 Jan 2025
36 Chhattisgarh FP/CG/Others/9380/2015 FC-II/CH-96/2018-NGP SLURRY PIPELINE PROJECT - ASSOCIATED FACILITIES OF CONVEYOR GALLERY, IRON ORE CONCENTRATE PIPELINE AND TAILING DAM PIPELINE Others NMDC LIMITED 7.116 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jan 2015
Stage-I Approval on : 24 Nov 2020
Compliance Report Submitted by User Agency on : 25 Oct 2021
21 Dec 2021
37 Chhattisgarh FP/CG/Others/28644/2017 FC-I/CH-176/2020-NGP Explosive Storage at Tilda, Raipur District of Chhattisgarh State Others GULF OIL CORPORATION LIMITED BILASPUR 4 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Aug 2017
Stage-I Approval on : 15 Mar 2021
Compliance Report Submitted by User Agency on : 23 Jul 2022
22 Dec 2022
38 Chhattisgarh FP/CG/OFC/43274/2019 F 5-37/2023/10-2 BharatNet Phase-II Elephant Reserve Ambikapur Optical Fibre Cable CHIPS 1.462 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jan 2020
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
16 May 2025
39 Chhattisgarh FP/CG/TRANS/18792/2016 FC-II/CH-59/2017-NGP 765 KV D/C RAIPUR RAJNANDGAON WARORA TRANSMISSION LINE Transmission Line RAIPUR RAJNANDGAON WARORA TRANSMISSION LIMITED 10.0555 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Apr 2016
Stage-I Approval on : 07 Jul 2017
Compliance Report Submitted by User Agency on : 03 Jan 2025
02 Jun 2018
40 Chhattisgarh FP/CG/TRANS/22299/2016 FC-II/CH-53/2016-NGP CONSTRUCTION OF 132 KV TRANSMISSION LINE FOR PROPOSED 132/33 KV SUBSTATION RAJPUR (CG) Transmission Line CSPTCL 18.204 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Nov 2016
Stage-I Approval on : 03 May 2017
Compliance Report Submitted by User Agency on : 22 Feb 2018
16 Aug 2018
41 Chhattisgarh FP/CG/ROAD/36751/2018 FC-I/IROCH-14/2022 Widening of Existing Road From Bakaruma - Lailunga Road. Road PROJECT DIRECTOR CSRSP PWD RAIPUR 3.843 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Mar 2020
Stage-I Approval on : 27 Feb 2023
Compliance Report Submitted by User Agency on : 08 May 2023
30 Jan 2024
42 Chhattisgarh FP/CG/RAIL/48681/2020 FC-II/IROCH-05/2021 3rd Line in between Paniajob-Bortalao in lieu of 3rd line Project between Rajnandgaon- Nagpur (Kalumna) Railway SOUTH EAST CENTRAL RAILWAY RAIPUR 20.954 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2020
Stage-I Approval on : 23 Feb 2021
Compliance Report Submitted by User Agency on : 30 Jun 2021
26 Nov 2021
43 Chhattisgarh FP/CG/TRANS/21354/2016 FC-III/CH-21/2017-NGP CONSTRUCTION OF 765 KV DOUBLE CIRCUIT JHARSUGUDA (SUNDARGARH) – RAIPUR POOL TRANSMISSION LINE Transmission Line ODISHA GENERATION PHASE II TRANSMISSION LIMITED 71.761 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Sep 2016
Stage-I Approval on : 17 Oct 2017
Compliance Report Submitted by User Agency on : 23 Feb 2020
21 Dec 2021
44 Chhattisgarh FP/CG/ROAD/38519/2019 FC-III/CH-42/2019-NGP Diversion of 83.6241 Ha Forest for Rehabilitation and Upgrading to 4- Lane with paved shoulders configuration of Bilaspur- Katghora Section of NH-111 in the State of Chhattisgarh Pkg.-II(Km. 53+300 to Km 92+500)-Pathrapali to Katghora Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR 83.6421 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Feb 2019
Stage-I Approval on : 31 Jul 2020
Compliance Report Submitted by User Agency on : 22 Nov 2023
09 Apr 2024
45 Chhattisgarh FP/CG/Others/7694/2014 FC-III-CH-23-2017-NGP NMDC SLURRY PIPELINE PROJECT Others NMDC LIMITED 83.831 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Nov 2014
Stage-I Approval on : 08 Feb 2018
Compliance Report Submitted by User Agency on : 18 Feb 2020
20 Nov 2020
46 Chhattisgarh FP/CG/SubStation/145951/2021 FC-II/IROCH-17/2023 220/132/33 KV SUBSTATION DHARAMJAIGARH AT VILLAGE HATI, AREA 6.823 HECTARE Sub Station CSPTCL 6.823 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 04 Jul 2023
Compliance Report Submitted by User Agency on : 02 Jan 2025
47 Chhattisgarh FP/CG/OFC/45530/2020 F 5-27/2023/10-2 BharatNet Project Phase-II Udanti Sitanadi Tiger Reserve, Gariyaband Optical Fibre Cable CHIPS 8.965 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
16 May 2025
48 Chhattisgarh FP/CG/OFC/45471/2020 F 5-55/2023/10-2 BharatNet Project Phase-II Indrawati Tiger Reserve Bijapur Optical Fibre Cable CHIPS 5.88 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 27 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
16 May 2025
49 Chhattisgarh FP/CG/MIN/13199/2015 8-41/2017-FC GEVRA OPENCAST Mining SOUTH EASTERN COALFIELDS LTD 112.385 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jun 2015
Stage-I Approval on : 27 Sep 2017
Compliance Report Submitted by User Agency on : 10 Nov 2021
21 Jun 2022
50 Chhattisgarh FP/CG/TRANS/9820/2015 FC-II/CH-26/2015-NGP 400kV D/C Transmission Line from Balco to PGCIL Dharamjaygarh Pooling station at Bhaisma, Dist: Korba. Transmission Line BALCO 17.245 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Feb 2015
Stage-I Approval on : 17 Mar 2016
Compliance Report Submitted by User Agency on : 03 Jan 2025
08 Jun 2016
12