Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Arunachal Pradesh
|
FP/AR/ROAD/142365/2021
|
3-AN-C-129/2022-GHY
|
Construction of Foot track from Tappa to karu km 43.2
|
Road
|
BORDER ROADS ORGANISATION 756 TASK FORCE
|
22.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2021
|
Stage-I Approval on
|
:
|
01 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2025
|
|
|
|
07 May 2025
|
2
|
Arunachal Pradesh
|
FP/AR/ROAD/49048/2020
|
3-AN-B-062/2021-GHY
|
Construction of Pinjoli Br
|
Road
|
BORDER ROADS ORGANISATION 14 TF
|
0.162
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2020
|
Stage-I Approval on
|
:
|
27 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2025
|
|
|
|
06 Mar 2025
|
3
|
Arunachal Pradesh
|
FP/AR/ROAD/142357/2021
|
3-AN-C-098/2022-GHY
|
Nelya-Hatonga Road
|
Road
|
BORDER ROADS ORGANISATION 763 TF
|
16.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 May 2021
|
Stage-I Approval on
|
:
|
05 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
18 Feb 2025
|
4
|
Arunachal Pradesh
|
FP/AR/TRANS/150476/2021
|
3-AN-A-165/2023/GHY
|
Contraction of 132 KV S/C (D/C tower) BOMDILA - KALAKTANG TRANSMISSION LINE line under Arunachal Pradesh Comprehensive Scheme of Transmission & Distribution system
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
77.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2021
|
Stage-I Approval on
|
:
|
22 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2024
|
|
|
|
12 Feb 2025
|
5
|
Arunachal Pradesh
|
FP/AR/ROAD/116857/2020
|
3-AN-A-179/2023/GHY
|
Diversion of Forest Land for Construction of Nelya-Dhaula Road from Km 0.910 to Km 34.124 and link road to Bhawani post of Km 2.39 (Net length= Km 35.604) by Border Roads Organisation under Tawang District of Arunachal Pradesh
|
Road
|
BORDER ROADS ORGANISATION 763 TF
|
89.298
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2020
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
23 Jan 2025
|
6
|
Arunachal Pradesh
|
FP/AR/MIN/65716/2020
|
3-AN-C-049/2021/GHY
|
Forest Diversion Proposal for Oil & Gas well Drilling, Production Installation and Central Effluent Pit (CEP) for an area of 29.32 Ha in Kumchai oilfield under Ningru PML of Oil India Limited in Nampo
|
Mining
|
OIL INDIA LIMITED
|
29.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2020
|
Stage-I Approval on
|
:
|
30 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2024
|
|
|
|
19 Dec 2024
|
7
|
Arunachal Pradesh
|
FP/AR/ROAD/145483/2021
|
3-AN-C-176/2023-GHY
|
Additional forest proposal for muck disposal area for widening/Improvement of existing road to NHDL specification of Road Hayuliang -Changwinti (Km 45.05 to km 50.820) and Changwinti-Walong-Namti ( km 0.00 to Km 54.450) Net Length 60.220 Km under project
|
Road
|
116 RCC
|
21.3454
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2021
|
Stage-I Approval on
|
:
|
05 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2024
|
|
|
|
11 Dec 2024
|
8
|
Arunachal Pradesh
|
FP/AR/MIN/36885/2018
|
3-AN-C-014/2020-SHI
|
Regularization of site specific Forest Clearance under Ningru PML of OIL in Arunachal Pradesh as per grant of PML
|
Mining
|
OIL INDIA LIMITED NEF PROJECT
|
34.508
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Nov 2018
|
Stage-I Approval on
|
:
|
08 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
30 Oct 2024
|
9
|
Arunachal Pradesh
|
FP/AR/TRANS/153585/2022
|
3-AN-A-170/2023/GHY
|
Construction of 132 Kv S/C on D/C transmission line from Tezu to Halaipani under Comprehensive scheme for strengthening of T & D system in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
257.769
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2022
|
Stage-I Approval on
|
:
|
28 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2024
|
|
|
|
30 Oct 2024
|
10
|
Arunachal Pradesh
|
FP/AR/TRANS/150699/2021
|
3-AN-A-159/2023-GHY
|
Construction of 132 kV S/C on D/C Tower from Yingkiong to Tuting under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
211.68
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2022
|
Stage-I Approval on
|
:
|
15 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
18 Sep 2024
|
11
|
Arunachal Pradesh
|
FP/AR/ROAD/149902/2021
|
3-AN-C-201/2023/GHY
|
Widening/Improvement of Kaying - Tato Road From Km 11.350 To Km 19.950 And Km 28.600 To Km 86.600 (Total Length 66.600 Km) From Existing Road To NHDL Specifications Under Project Brahmank In Arunachal
|
Road
|
BORDER ROAD ORGANIZATIONS
|
39.093
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
22 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2024
|
|
|
|
18 Sep 2024
|
12
|
Arunachal Pradesh
|
FP/AR/TRANS/153996/2022
|
3-AN-A-169/2023/GHY
|
Construction of 132 kV D/C on S/C Tower from Kambang to Machuka under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
251.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
10 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
18 Sep 2024
|
13
|
Arunachal Pradesh
|
FP/AR/TRANS/152556/2022
|
3-AN-A-160/2023/GHY
|
Construction of 132 kV S/C on D/C Tower from Along to Yeingkiong under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
257.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2022
|
Stage-I Approval on
|
:
|
29 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
18 Sep 2024
|
14
|
Arunachal Pradesh
|
FP/AR/TRANS/153117/2022
|
3-AN-C-150/2022/GHY
|
Construction of 132 kV S/C on D/C Tower from Roing to Dambuk under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
18.244
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Mar 2022
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2024
|
|
|
|
18 Sep 2024
|
15
|
Arunachal Pradesh
|
FP/AR/TRANS/153626/2022
|
3-AN-A-167/2023/GHY
|
Construction of 132 kV S/C on D/C Tower from Palin to Koloriang under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
91.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2022
|
Stage-I Approval on
|
:
|
28 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
18 Sep 2024
|
16
|
Arunachal Pradesh
|
FP/AR/ROAD/157299/2022
|
F. No. 3 AN A /154/2023/GHY
|
Improvement of road Migging-Tuting from Design Chainage 15.000 to 35.134 to NH Double Lane specification in the state of Arunachal Pradesh.
|
Road
|
105 RCC (GREF)
|
65.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2022
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Aug 2024
|
|
|
|
04 Sep 2024
|
17
|
Arunachal Pradesh
|
FP/AR/ROAD/142632/2021
|
3-AN-C-164/2023/GHY
|
Widening/Improvement of Existing Road Namti – Kibithu Between Km 0.000 To 20.310 To NHDL Specifications, Construction Of Road Kibithu-Thochu-Wacha Between Km 0.000 To Km 9.750 (Green Field Alignment)
|
Road
|
116 RCC
|
34.9816
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 May 2021
|
Stage-I Approval on
|
:
|
22 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2023
|
|
|
|
09 Jul 2024
|
18
|
Arunachal Pradesh
|
FP/AR/ROAD/148555/2021
|
3-AN-A-182/2023/GHY
|
Mipi Andrala Project
|
Road
|
BRO ARUNACHAL PRADESH
|
144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2021
|
Stage-I Approval on
|
:
|
04 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2024
|
|
|
|
28 Jun 2024
|
19
|
Arunachal Pradesh
|
FP/AR/ROAD/142263/2021
|
3-AN-C-137/2022-GHY
|
Construction of Foot Track from Milli - Semai km 32.406 for ITBP
|
Road
|
BORDER ROADS ORGANISATION 756 TASK FORCE
|
17.203
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2021
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Apr 2024
|
|
|
|
20 Jun 2024
|
20
|
Arunachal Pradesh
|
FP/AR/ROAD/142359/2021
|
3-AN-C-127/2022-GHY
|
Construction of Foot Track Sarli - Phule Km 13.50 for ITBP
|
Road
|
BORDER ROADS ORGANISATION 756 TASK FORCE
|
7.75
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2021
|
Stage-I Approval on
|
:
|
31 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Apr 2024
|
|
|
|
20 Jun 2024
|
21
|
Arunachal Pradesh
|
FP/AR/ROAD/142363/2021
|
3-AN-C-113/2022-GHY
|
Construction of Foot Track Huri-Tappa Km 20.44 for ITBP
|
Road
|
BORDER ROADS ORGANISATION 756 TASK FORCE
|
11.22
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2021
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Apr 2024
|
|
|
|
10 May 2024
|
22
|
Arunachal Pradesh
|
FP/AR/ROAD/155849/2022
|
3-AN-B-158/2022/GHY
|
Proposal for diversion of 3.04 ha forestland for construction of 2 lanning of Arrowa to Tidding road from Km 0 to Km 1.76 in Lohit District on EPC mode in the state of Arunachal Pradesh
|
Road
|
NHIDCL
|
3.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2022
|
Stage-I Approval on
|
:
|
26 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2024
|
|
|
|
01 Mar 2024
|
23
|
Arunachal Pradesh
|
FP/AR/TRANS/145264/2021
|
3-AN-A-140/2023/GHY
|
Construction of 132kV Transmission line from Changlang to Jairampur under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
136.458
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Aug 2021
|
Stage-I Approval on
|
:
|
14 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
30 Jan 2024
|
24
|
Arunachal Pradesh
|
FP/AR/TRANS/148735/2021
|
3-AN-A-134/2022/GHY
|
Construction of 132kV S/C (on D/C tower) Khupi to Bomdila transmission line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
120.266
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Oct 2021
|
Stage-I Approval on
|
:
|
01 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Oct 2023
|
|
|
|
03 Nov 2023
|
25
|
Arunachal Pradesh
|
FP/AR/ROAD/37045/2018
|
3-AN-A-094/2022/GHY
|
Diversion of Forest Land for Construction of Tadadege - Henkaer Road from 0.00 km to 28.55 km by CPWD under West Siang District of Arunachal Pradesh
|
Road
|
RO ITANAGAR MORT&H
|
61.39
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2018
|
Stage-I Approval on
|
:
|
07 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jun 2023
|
|
|
|
27 Oct 2023
|
26
|
Arunachal Pradesh
|
FP/AR/TRANS/148319/2021
|
3-AN-A-141/2022/GHY
|
Construction of 132 kV S/C on D/C Tower from Along to Kambang under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
95.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Oct 2021
|
Stage-I Approval on
|
:
|
23 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2023
|
|
|
|
13 Oct 2023
|
27
|
Arunachal Pradesh
|
FP/AR/TRANS/152572/2022
|
3-AN-A-142/2022/GHY
|
Construction of 132kV S/C (on D/C tower) Bomdila to Tawang transmission line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
137.315
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2022
|
Stage-I Approval on
|
:
|
14 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Oct 2023
|
|
|
|
13 Oct 2023
|
28
|
Arunachal Pradesh
|
FP/AR/TRANS/145387/2021
|
3-AN-A-143/2022/GHY
|
CONSTRUCTION OF 132 KV S/C T/L FROM KHONSA TO CHANGLANG UNDER COMPREHENSIVE SCHEME FOR STRENGTHENING OF TRANSMISSION AND DISTRIBUTION SYSTEM IN ARUNACHAL PRADESH
|
Transmission Line
|
DEPARTMENT OF POWER ARUNACHAL PRADESH
|
70.214
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2021
|
Stage-I Approval on
|
:
|
23 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
13 Oct 2023
|
29
|
Arunachal Pradesh
|
FP/AR/TRANS/145383/2021
|
3-AN-A-141/2022/GHY
|
CONSTRUCTION OF 132 KV T/L (S/C ON D/C TOWER) FROM KHONSA TO LONGDING (INITIALLY TO BE CHARGED AT 33KV) UNDER COMPREHENSIVE SCHEME FOR STRENGTHENING OF TRANSMISSION AND DISTRIBUTION SYSTEM IN ARUNACHA
|
Transmission Line
|
DEPARTMENT OF POWER ARUNACHAL PRADESH
|
65.256
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2021
|
Stage-I Approval on
|
:
|
09 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2023
|
|
|
|
13 Oct 2023
|
30
|
Arunachal Pradesh
|
FP/AR/HYD/48835/2020
|
3-AN-B-002-2021-GHY
|
Ressing HEP (12MW)
|
Hydel
|
GEKAM POWER PRIVATE LIMITED
|
2.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2020
|
Stage-I Approval on
|
:
|
06 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
22 Sep 2023
|
31
|
Arunachal Pradesh
|
FP/AR/TRANS/153621/2022
|
3-AN-A-133/2022/GHY
|
Construction of 132 kV S/C on D/C Tower from Yachuli to Palin under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
101.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2022
|
Stage-I Approval on
|
:
|
21 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2023
|
|
|
|
18 Jul 2023
|
32
|
Arunachal Pradesh
|
FP/AR/TRANS/153903/2022
|
3-AN-A-156/2023/GHY
|
Construction of 132 kV S/C on D/C Tower from Daporijo to Nacho under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
196.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2022
|
Stage-I Approval on
|
:
|
17 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2023
|
|
|
|
18 Jul 2023
|
33
|
Arunachal Pradesh
|
FP/AR/ROAD/144693/2021
|
3-AN-C-097/2022-GHY
|
Construction of Foot Track from Sariyo to Longchu km 53.51 km
|
Road
|
RO ITANAGAR MORT&H
|
35.305
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
11 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2023
|
|
|
|
16 Jun 2023
|
34
|
Arunachal Pradesh
|
FP/AR/TRANS/41434/2019
|
3-AN-A-069/2020-GHY
|
Construction of 132 Kv S/C on D/C Transmission line from Ziro(PG) to Ziro (New) under Comp.Scheme T & D in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER ARUNACHAL PRADESH
|
33.183
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2019
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Mar 2023
|
|
|
|
11 Apr 2023
|
35
|
Arunachal Pradesh
|
FP/AR/ROAD/36526/2018
|
3-AN-C-007/2021-GHY
|
Diversion of Forest Land for Construction of Lada - Bisai Road from 0.00 km to 32.357 km by CPWD under East Kameng District of Arunachal Pradesh
|
Road
|
RO ITANAGAR MORT&H
|
70.0626
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Dec 2018
|
Stage-I Approval on
|
:
|
11 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
15 Mar 2023
|
36
|
Arunachal Pradesh
|
FP/AR/ROAD/36490/2018
|
3-AN-C-009/2021-GHY
|
Diversion of Forest Land for Construction of Doginala-Gau Road from 0.00 km to 15.328 km by CPWD under Upper Subansiri District of Arunachal Pradesh
|
Road
|
RO ITANAGAR MORT&H
|
32.5904
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Nov 2018
|
Stage-I Approval on
|
:
|
11 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
13 Mar 2023
|
37
|
Arunachal Pradesh
|
FP/AR/TRANS/35448/2018
|
3-AN-A -112/2019-SHI
|
Construction of 132kV T/L from Namsai to Miao under Comprehensive Scheme for Strengthening of Transmission and Distribution in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
110.817
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2018
|
Stage-I Approval on
|
:
|
25 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Oct 2022
|
|
|
|
16 Feb 2023
|
38
|
Arunachal Pradesh
|
FP/AR/Pipeline/54968/2020
|
3-AN-C-046/2021-GHY
|
Kumchai EPS to Kusijan FGGS Gas & Oil Pipeline
|
Pipeline
|
OIL INDIA LIMITED
|
12.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Nov 2020
|
Stage-I Approval on
|
:
|
18 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2023
|
|
|
|
09 Feb 2023
|
39
|
Arunachal Pradesh
|
FP/AR/VELEC/35182/2018
|
3-AN-C-081/2021-SHI
|
Proposal for diversion of 43.43 Ha. forest land for construction of 33 kV Miao- Diyun Distribution Line
|
Village Electricity
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
43.43
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2018
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2022
|
|
|
|
12 Dec 2022
|
40
|
Arunachal Pradesh
|
FP/AR/TRANS/43326/2019
|
3-AN-A-034/2021-GHY
|
Construction of 132 kV Single Circuit Transmission Line on Double Circuit Towers from Pasighat (Old) Dura Korang To Mariyang Under Comprehensive Scheme in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER ARUNACHAL PRADESH
|
127.911
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2019
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
12 Dec 2022
|
41
|
Arunachal Pradesh
|
FP/AR/VELEC/35184/2018
|
3-AN-C-080/2021-SHI
|
Proposal for diversion of 27.34 Ha. forest land for construction of 33 kV Miao- Kharsang Distribution Line
|
Village Electricity
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
27.34
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2018
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2022
|
|
|
|
06 Dec 2022
|
42
|
Arunachal Pradesh
|
FP/AR/Others/120310/2021
|
FNO 3 AN B 078/2021/GHY
|
Gohpur - Itanagar Natural Gas Pipeline Project
|
Others
|
INDRADHANUSH GAS GRID LIMITED
|
1.5775
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2021
|
Stage-I Approval on
|
:
|
24 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2022
|
|
|
|
23 Nov 2022
|
43
|
Arunachal Pradesh
|
FP/AR/TRANS/45195/2020
|
3-AN-A-035/2021-GHY
|
Construction of 132 kV S/C (on D/C Tower) Transmission Line from Tawang to Lumla under Cpmrehensive Scheme, for Strenghthening of Transmission and Distribution System in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
70.864
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2020
|
Stage-I Approval on
|
:
|
10 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2022
|
|
|
|
14 Nov 2022
|
44
|
Arunachal Pradesh
|
FP/AR/TRANS/41550/2019
|
3-AN-C-039/2021-GHY
|
Construction of 33 Kv line from Yachuli to Hapoli under Comprehensive scheme for strengthening of Transmission & distribution in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER ARUNACHAL PRADESH
|
29.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2019
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
18 Aug 2022
|
45
|
Arunachal Pradesh
|
FP/AR/TRANS/40560/2019
|
3-AN-A-022/2021-GHY
|
Construction of 132 KV S/C on D/C Transmission line from Naharlagun to Gerukamukh under Comp.Scheme T & D in Arunachal Pradesh.
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
230.44
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2019
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2022
|
|
|
|
20 Jul 2022
|
46
|
Arunachal Pradesh
|
FP/AR/TRANS/142551/2021
|
3-AN-C-088/2022/GHY
|
Construction of 132kV D/C LILO of one circuit of Pare HEP – North Lakhimpur (AEGCL) line at Nirjuli (POWERGRID) substation in Arunachal Pradesh
|
Transmission Line
|
VAPI II-NORTH LAKHIMPUR TRANSMISSION LIMITED
|
30.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2021
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2022
|
|
|
|
15 Jul 2022
|
47
|
Arunachal Pradesh
|
FP/AR/TRANS/43444/2019
|
3-AN-A-011/2021-GHY
|
Construction of 132 kV S/C (on D/C tower) Khupi to Seppa transmission line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh
|
Transmission Line
|
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
|
130.062
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2019
|
Stage-I Approval on
|
:
|
08 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2022
|
|
|
|
11 Jul 2022
|
48
|
Arunachal Pradesh
|
FP/AR/TRANS/144909/2021
|
FNO 3 AN C/092/2022/GHY
|
Construction of 132kV D/C Roing-Chapakhowa Transmission Line under NERSS-X.
|
Transmission Line
|
POWERGRID
|
15.034
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jul 2021
|
Stage-I Approval on
|
:
|
09 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jul 2022
|
|
|
|
11 Jul 2022
|
49
|
Arunachal Pradesh
|
FP/AR/TRANS/140671/2021
|
3-ANC052/2021-GHY
|
Construction of 132 kV D/C Pare HEP to Lakhimpur Transmission Line
|
Transmission Line
|
VAPI II-NORTH LAKHIMPUR TRANSMISSION LIMITED
|
24.602
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Apr 2021
|
Stage-I Approval on
|
:
|
09 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 May 2022
|
|
|
|
31 May 2022
|
50
|
Arunachal Pradesh
|
FP/AR/ROAD/41095/2019
|
F. no. 3-AN A 015/2021-GHY
|
DIVERSION OF FOREST LAND FOR THE CONSTRUCTION OF TATO TO MENCHUKA ROAD FROM 0+000 KM TO 41+275 KM BY BRO BRAMHANK UNDER WEST SIANG DISTRICT IN THE STATE OF ARUNACHAL PRADESH
|
Road
|
BRO
|
49.53
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2019
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2021
|
|
|
|
22 Feb 2022
|
|