  (i). Proposal No. : FP/AR/TRANS/45195/2020   (ii). Name of Project for which Forest Land is required : Construction of 132 kV S/C (on D/C Tower) Transmission Line from Tawang to Lumla under Cpmrehensive Scheme, for Strenghthening of Transmission and Distribution System in Arunachal Pradesh.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed 132kV S/C (on D/C Tower) Transmission line from Tawang to Lumla is a sub-project conceived under Govt. of India’s ambitious project namely, 'Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Pradesh.'   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2900   (viii). Area of forest land proposed for diversion(in ha.): 70.864   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : BIDYUT BHAWAN, ZIRO POINT TINIALI,   (iii). Address2 : ITANAGAR, ARUNACHAL PRADESH   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : NEAR ZIRO POINT TINIALI   (viii). Email address : baishyasantana@gmail.com   (ix). Landline Telephone No. : 360-2257301   (x). Fax No. : 360-   (xi). Mobile No. : 9436255253   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: TARIK   (ii). Middle Name: NIL   (iii). Last Name: MIZE   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: O/O EXECUTIVE ENGINEER TAWANG DIVISION   (vii). Address 2: DEPARTMENT OF POWER TAWANG   (viii). State: Arunachal Pradesh   (ix). District: Tawang   (x). Tehsil: Tawang Circle   (xi). Pin: 790104   (xii). Landmark: Tawang   (xiii). Email Address: electricaltawangfc@gmail.com   (xiv). Landline Telephone No.: 3764-222249   (xv). Fax No.: 03794223745   (xvi). Mobile No.: 9436059758   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang SF Division. Tawang70.8640
Total70.8640
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang70.8640
Total70.8640
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Changbu1.5720
2Khinmey3.4420
3Sartha0.5440
4Daragao2.0460
5Namet0.5330
6Bomdir2.0980
7Dharamkang1.4620
8Paikhar1.4520
9Gyangar1.4920
10Bomba2.4850
11Lamtheng0.5320
12Tiley1.210
13Pempaling3.610
14Gormang2.7170
15Yusume4.3740
16Tsegar2.780
17Kangteng2.4430
18Kudung4.5320
19Sakyur11.4830
20Khrilham3.3060
21Mangnam10.3390
22Umla3.5560
23Khunba2.0420
24Lumla0.8140
Total 70.864 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1RIGHT OF WAY 132 kV TRANSMISSION LINE.70.8640
Total 70.864 0
C. Maps of forest land proposed to be diverted
Division 1. : Tawang SF Division. Tawang
  (i). Area of forest land proposed to be diverted(in ha.) : 70.864   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.70.864    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 24   (iii). Temporary Employment(Number of person-days): 50000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1AUTORIZATION Annexure I
2Annexure II Cost of NPV, Addt. NPV
3Annexure III Minimum use of forest land
4Annexure IV Compliance under FRA
5Annexure V Survey done by TS
6Annexure VI Undertaking for CA
7Annexure VII Undertaking for CBA
8Annexure VIII Undertaking for Safety Zone
9Annexure IX Undertaking for Cost Extraction
103D Tower Drawing
11CBA Statement
12Justification for locating the project
13MoP
14MoU
15Proposed route alternative
16Statement of Forest Land to be diverted
17Three Alternative Route map
18TOPO Map
19Tower Diagram
20Tower Schedule Route 1
21Tower Schedule Route 2
22Tower Schedule Route 3
23Village wise break up
24Geo Ref. Map
25Diversion proposal for 132kV S/C (on D/C tower) Tawang Lumla transmission line - Non-availability of Survey of India Topo-Sheet