FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/MIN/147953/2021
(ii). Name of Project for which Forest Land is required :
Collection Of Minor Minerals (Reta,Bajri,Boulder) to existing Course of Natura water from Dabka River
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The project is situated on Dabka river in ramnager Block under Bailpadav range of trai western forest division, nanital district. During monsoon RBM (Reta,Bajri,Boulder) got collected in the river course which lead to flooding of the river. By extracting this RBM from the river bed, flooding can be
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Mining
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1050
(viii). Area of forest land proposed for diversion(in ha.):
112
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
10
A-2.
Details of User Agency
(i). Name :
UAFDC KHANAN RAMNAGAR DABKA
(ii). Address1 :
UTTRAKHAND VAN VIKAS NIGAM KHANAN RAMNAGAR AAMDANDA NAINITAL
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Nainital
(vi). Pin :
244715
(vii). Landmarks :
OPP- CORBET TIGER RESERVE BIJRANI GATE
(viii). Email address :
dabkaramnagar@gmail.com
(ix). Landline Telephone No. :
NIL
(x). Fax No. :
NIL
(xi). Mobile No. :
9568003237
(xii). Website (if any) :
uafdc.in
(xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
(xiv). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Dhiresh
(ii). Middle Name:
Chandra
(iii). Last Name:
Bisht
(iv). Gender:
Male
(v). Designation:
DIVISIONAL MANAGER
(vi). Address 1:
UTTRAKHAND VAN VIKAS NIGAM KHANAN RAMNAGAR AAMDANDA NAINITAL
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Nainital
(x). Tehsil:
Ramnagar
(xi). Pin:
244715
(xii). Landmarks:
OPP- CORBET TIGER RESERVE BIJRANI GATE
(xiii). Email Address:
dabkaramnagar@gmail.com
(xiv). Landline Telephone No.:
NIL
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9568003237
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-4.
Details of approvals under the Forest (Conservation) Act , 1980 accorded in the past
Serial No
Proposal No
MoEF File No
Date of approval
Area of forest land diverted
Period of diversion
1
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
15 Feb 2013
223
10
A-5.
Status of compliance to conditions stipulated in the previous approvals
Serial No
Proposal No
MoEF File No
Conditions stipulated by the MoEF
Details of the compliance
1
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
1-(I) Legal status of the diverted forest land shall remain unchanged. 2-(II) Compensatory afforestation over the degraded forest land equal in extent to the forest land being diverted shall be raised and maintained by the State Forest Department at the cost of the User Agency. 3-(III) All the funds received from the User Agency under the project shall be transferred to Ad-hoc CAMPA in the Saving Bank Account of the concerned State CAMPA in the Corporation Bank, CGO Complex, Lodhi Road, New Delhi. 4-(IV) No Collection of Minor Minerals shall be permitted from the portion of the Dabka River located on northern side of Ramnagar Highway. 5-(V) The collection of minor minerals after 31st day of January in a year shall be allowed only after receipt of certificate from the Monitoring Committee under the Chairmanship of the Principal Chief Conservator of Forests, Uttarakhand constituted vide Government of Uttarakhand’s letter No. 14-1/X-3-13-08(14)/2008-T.C. dated 29.01.2013 to the effect that the conditions stipulated in the approval accorded under the Forest (Conservation) Act, 1980 and the instructions issued by the Monitoring Committee have satisfactorily been complied in collection of the minor minerals during the previous calendar year. 6-(VI) To restore the functionality and utility of the migratory corridor linking Corbet Tiger Reserve with the Pawalgarh Conservation Reserve, the State Government may explore feasibility to relocate the settlements from the Sunderkhal Village by using State CAMPA funds. 7-(VII) The State Government Shall through the central soil & water conservation research & training institute (CSWCRTI) Dehradun Assess the quantity of minor minerals that may sustainably be collected the said portion of the Dabka River & intimate the same to the ministry of environment & Forest. 8-(VIII) The total quantity of minor minerals extracted during a year shall not be more than 8.49 lakh cubic meter as per E.C. (E.C. NO-J-11015/359/2009-IA-11(M) dated 15th april 2011. At present the quantity is fixed 63837.5600 cubic meter (112.00 Hac) as per study done in 2020-21 by CSWCRTI Dehradun after completing the target Govt. of Uttarakhand issuing the New target 317000.00 cubic meter as per Replenishment study done in 2020-21 by Go no- 351/VII-A-1/2021/5(39)/20/dated on 25-03-2021. Total quantity 380837.5600 cubic meter 9-(IX) To ensure extraction of minerals in a sustainable manner the user agency shall formulate a transparent and unbiased procedure for engagement of labours for extraction of the minor minerals from the forest land proposed for diversion. 10-(X) Fifty percent of the net profit earned by the user agency from the collection of minor minerals shall be deposited in a Special Purpose Vehicle (SPV) to be constituted by the State Government under the Chairmanship of the Chief Wildlife Warden, Government of Uttarakhand. The amount to be deposited in the SPV shall be used exclusively for river training activities and management & protection of forest & wildlife in vicinity of forest land diverted for collection of minor minerals. 11-(XI) Extraction of minor minerals shall be restricted to the middle half of the width of river bed after leaving intact the one-fourth of width of the river bed along its each bank. 12-(XII) To ensure maintenance of river geometry, collection of minor minerals during a working season shall start from centre of the river width and shall gradually extend to the boundary of the permissible area. The maximum permissible depth for collection of minor minerals at centre of the river width shall be limited to 3 m and it shall gradually reduce till reaches boundary of the permissible zone. 13-(XIII) To regulate and maintain record of the quantity of minor minerals extracted during a season, the State Forest Department shall set up adequate number of check post during the collection season. 14-(XIV) Extraction of minor mineral shall be restricted from 1st October to 31st May of the subsequent year. 15-(XV) Minor minerals shall be collected manually be using hand tools. Use of explosive and heavy machineries for breaking/collection of minor minerals shall be strictly prohibited. 16-(XVI) Collection time shall be from sun-rise to sun-set. 17-(XVII) No labour camp shall be set up in the forest area for the labourers engaged in collection of the minor minerals. 18-(XVIII) Breaking of boulders shall be undertaken outside the forest boundaries. 19-(XIX) The labour engaged in collection work will be provided free fuel wood/alternate source of energy to avoid any pressure on adjoining forest land. 20-(XX) The boundary of the forest land being diverted shall be demarcated on ground at the project cost, by erecting four foot high reinforced cement concrete pillars, each inscribed with its serial number DGPS coordinates, forward and back bearing and distance from adjoin pillars etc. 21-(XXI) The forest land shall not be used for any purpose other than that specified in the proposal. 22-(XXII) The user agency shall submit annual self – monitoring report containing status of compliance to conditions stipulated in the approval to the State Government and concerned Regional Office of this Ministry. 23-(XXIII) Any other condition that the Central Regional Office of the Ministry, Lucknow and the State Government of Uttarakhand may stipulate, from time to time, in the interest of conservation, protection and development of forests & wildlife; 24-(XXIV) The User Agency and the State Government shall ensure compliance to provisions of the all Acts, Rules, Regulations and Guidelines, for the time being in force, as applicable to the project.
1-Yes, it is being followed with, as per stipulated condition. 2-Yes, it is being done by Forest Department with the funds realized from UKFDC. 3-The fund is being transferred to the concerned agency. 4-Yes, it is being Strictly followed with, as per stipulated condition. 5-Yes, the condition is being followed accordingly in collection of the minor minerals during the previous calendar year. 6-It is being act accordingly by the Forest Department. 7-Yes, the condition is being followed accordingly. 8-The condition is being complied with, summary of the report for the year 2020-21 and Replenishment Study Report is enclosed. 9-Yes, the condition is Followed in stipulated manner. 10-Yes, it is being complied with by depositing the fund raised in SPV constituted by Government of Uttarakhand. 11-The condition is being complied accordingly. 12-Yes the condition followed is being complied with. 13-Yes the condition is being folllowed, by the Forest Department. 14-Yes the condition is being followed accordingly in a stipulated manner. 15-The condition is strictly followed. 16-Yes, The condition is being followed accordingly. 17-Yes, The condition is being followed according to order. 18-Yes, The stipulated condition followed accordingly. 19-The condition is being complied with, by providing fuel wood to laborers engaged in collection work. Report enclosed. 20-The condition is being complied with, the boundary of the forest land is demarcated by erecting pillars by the Forest Department on start of working season. 21-The condition is being strictly followed. 22-The monitoring report is submitted annually according to order. 23-No other condition has been stipulated so far by the central regional office and Govt. of Uttarakhand. 24-The compliance of the provision of the acts, rules, regulations, guidelines as applicable to the project is being ensured.
A-6.
Details of payments made in respect of the approval under the Forest (Conservation) Act , 1980 accorded in the past
Serial No
Proposal No
MoEF File No
Item/Nature
Amount paid (in Rupees)
Date of Payment
1
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
40776
10 Dec 2020
2
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
424521
06 Jan 2021
3
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
601545
08 Feb 2021
4
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
571141
06 Mar 2021
5
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
47266
19 Mar 2021
6
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
159333
11 May 2021
7
FP/UK/OTHERS/688/2009
8-61/1999-FC(PT-II)
Compensatory Afforestation
433162
23 Jun 2021
A-7.
Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
(i). Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency:
No
Serial No
Area
No of patch
Area of patch
Uploaded patch
Uploaded GPS
Date of return
Authority
Uploaded documentary proof
NIL
A-9.
Details of Transfer of Lease
Serial No
Name of person
Address of person
Date of transfer
MMDR File
Transfer Deed
Conservation
MoEF_file No
Date of approval
MoEF file
NIL
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
(i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. :
No
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Tarai West,Ramnagar
112
0
Total
112
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Nainital
112
0
Total
112
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
CHOI
42
0
2
GABUA KHAS
35
0
3
NATHUPUR
35
0
112
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
MINNING AREA CHOI TO NATHUPUR
112
0
Total
112
0
C.
Maps of forest land proposed to be diverted
Division 1. : Tarai West,Ramnagar
(i). Area of forest land proposed to be diverted(in ha.) :
112
(ii).Shape of forest land proposed to be diverted :
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
60
(iii). Temporary Employment(Number of person-days):
1200
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC application yet to be submitted
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Renewal of mining lease, for the forest area already broken/used for mining, dumping or overburden, construction of roads, ropeways, buildings, etc.
M.
Mining Details
M-1.1 .
Details of grant/renewal of mining lease in the past
Serial No
Period
Date of grant/renewal
Designation of authority
Copy of grant of the mining lease
Date of execution
Copy of the lease deed
1
15 Feb 2013 To 15 Feb 2023
15 Feb 2013
AIG of Forest
No Data
19 Feb 2013
(i)
Nature and quantity of mineral actually extracted from the forest and non-forest land
NIL
Serial No
Mineral
Qty. of ore proposed to be extracted during the lease period
Qty. of ore actually extracted during the lease period
Forest land
Non-Forest land
Forest land
Non-Forest land
1
Extraction of minor mineral , river bed material
112
0
112
0
Application under the Mineral Concession Rules, 1960 for renewal of the mining lease :
No
M-2 .
Details of Mining Plan
(i)
Date of approval of mining plan :
24 May 2021
(ii)
Approval authority :
Director Bhu Khanan, Uttarakhand, Dehradun
(iii)
Copy of approval of mining plan :
(iv)
Copy of approved mining plan :
(v)
Nature of mining (underground/opencast) :
Opencast
(vi)
Copy of the detailed land use plan in 14,000 scale prepared by using DGPS or Total Station :
(vii). Copy of map of the outer boundary of mining lease area:
M-3 .
Details of prospecting undertaken to assess mineral reserves
(i)
Detailed prospecting to assess mineral reserve in the lease has been undertaken :
Yes
Serial No
Designation of authority
Date of extension
From date
To Date
Copy of the prospecting licence
1
AIG of Forest and Principal Secretary State Gov.
15 Feb 2013
15 Feb 2013
15 Feb 2023
No Data
M-4 .
Details of extension (if any) of original prospecting licence issued in the past
(i)
Extension of original prospecting license was extended :
No
Serial No
Designation of authority
Date of grant
From date
To Date
Copy of the approval accorded for extension
NIL
M-5 .
Brief details of prospecting activities undertaken in the mining lease
(i)
Detail of prospecting activity under taken in the mining lease :
TO BE FILLED (PENDING)
M-5.1 .
Details of bore holes drilled for prospecting
Serial No
No. of Bore holes
Diameters(inch)
No. of Bore holes
Diameters(inch)
1
0
0
0
0
M-5.2 .
Estimated Reserve along with accuracy and confidence level
Serial No
Mineral
Estimated Reserve in forest land
Estimated Reserve in non-forest land
Estimated Reserve
%accuracy
%confidence level
Estimated Reserve
%accuracy
%confidence level
1
Extraction of minor mineral , river bed material
18
100
100
0
0
0
M-6 .
Details of approval under the Forest(Consevation) Act,1980 obtained for undertaking prospecting activities in the forest land located in the mining lease
(i)
Approval under the Forest(Conservation) Act, 1980 for undertaking prospecting activities in the forest land :
No
M-7 .
Mineral wise details
Number of minerals :
NIL
Serial No
Minerals
Estimated non forest land
Estimated forest land
Proposed annual extraction
Estimated life of mine
Total extraction
Estimated mineral
1
Extraction of minor mineral , river bed material
0
18
18
10
18
18
(i) Proposed use of the minerals proposed to be raised from the mining lease :
Non captive
(ii) Copy of details of the plan for the transportation of the minerals :
No Data
Additional information Details
Documents
S.No
Documents
Remarks
1
Dabka Qwery 15-sept-2022 reply
2
3
विभिंन मदों मे प्रदत्त राजस्व
4
Dabka MOEFF Qwery reply 30-12-2022
5
TOPOSHEET
6
GEO REFERENCE MAP
7
GOOGLE MAP
8
Near Dabka River Villages Detail and NOC
9
परियोजना की लंबाई चौड़ाई का विवरण
10
बिना अनुमति कार्य प्रारंभ ना होने का प्रमाण पत्र
11
COST OF PROJECT DABKA
12
लागू शर्तों के पालन का प्रमाण पत्र
13
ICAR REPORT VOL TARGET DABKA
14
मानक शर्तों के मान्य होने का प्रमाण पत्र
15
Acknowledgement Slip DABKA Hard Copy submitted
16
श्रमिकों को जलोनी लकड़ी उपलब्ध कराए जाने का प्रमाण पत्र
17
वन अधिनियम द्वारा उपखनिज चुगान कार्य
18
भूवैज्ञानिक की संस्तुतियों एवं सुझावों का अनुपालन
19
धार्मिक पौराणिक ऐतिहासिक महत्व के स्थल ना होने का प्रमाण
20
एनOपीOवी देयता से छूट का प्रमाण पत्र
21
TASK FORCE CERTIFICATE
22
वृक्ष विहीन होने का प्रमाण पत्र
23
वनाधिकारी द्वारा प्रदत्त प्रमाण पत्र
24
वन संरक्षण अधिनियम, 1980
25
वन्य जीव एवं वनस्पतियों को क्षति न पहुंचाए जाने का प्रमाण पत्र
26
आर सी सी पीलरों पर व्यय का वहन उत्तराखंड वन विकास निगम द्वारा
27
CTO DABKA up to 2023
28
वृक्षारोपण के0 एम0 एल0 फाइल_1
29
DABKA EDS 31 JANUARY
30
Minning plan Dabka latest 24-05-2021
31
परियोजना का ब्यौरा
32
ऑनलाइन प्रस्ताव संख्या
33
पर्यावरण संरक्षण अधिनियम 1986
34
जलोनी एवं वैकल्पिक ऊर्जा
35
Layout Plan मे परिवर्तन
36
न्यूनीकरण हेतु आवश्यक उपाय
37
परियोजना निर्माण संस्तुति
38
प्रस्ताव नियम-41
39
पूर्व पर्यावरण स्वीकृति
40
sachiv lease deed dabka
41
DABKA FILE COVER
42
Letter of Intent (LOI)-05 Letter no-1531
43
Daabka FC Division
44
DAABKA IA Division ExtensionofvalidityofECletter
45
DLM AUTHORIZED FC UPLOAD
46
मशीनरी उपकरणों का प्रयोग_7
47
MD AUTHORIZED TO DLM KOSI & DABKA
48
dabka minning site map pdf
49
Morphological Study
50
लैंड शेड्यूल
51
Guide Line Sustainable Sand Mining Management
52
JOINT INSPECTION BY MINING DEPARTMENT DABKA RIVER
53
Praptra 1-5
54
वैकल्पिक संरेखण को निरस्त प्रमाण पत्र
55
विदोहन एवं एकत्रीकरण के संबंध में
56
Dabka villages family & population
57
Self Compliance Report
58
मा0 न्यायालय एवं राष्ट्रीय हरित प्राधिकरण
59
वैधानिक स्थिति अपरिवर्तित
60
वन भूमि को वन विभाग को वापस करने के संबंध में
61
प्रस्तावित वन भूमि को हस्तांतरित न करने के संबंध में
62
आर0 सी0 सी 0पिलर
63
जिला स्तरीय बैठक दाबका_3