FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/153699/2022   (ii). Name of Project for which Forest Land is required : Construction of 220kV S/C Transmission line on D/C towers laying between proposed ABCSIPL 300MW Solar Power Plant to PGCIL 765/400/220kV GSS at Near Village - Badi Sird, Tehsil-BAP, District – Jodhpur in the State of Rajasthan ((Total Length 11.540 km)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of 220kV S/C Transmission line on D/C towers laying between proposed ABCSIPL 300MW Solar Power Plant to PGCIL 765/400/220kV GSS at Near Village - Badi Sird, Tehsil-BAP, District – Jodhpur in the State of Rajasthan ((Total Length 11.540 km)   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1500   (viii). Area of forest land proposed for diversion(in ha.): 0.175   (ix). Non-forest land required for this project(in ha.): 40.215   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : ABC SOLAR (INDIA) PRIVATE LIMITED   (ii). Address1 : House No. 6-3-680/813, P.No.03. 2nd Floor, PMR Plaza, Thakur Mansion Lane, Somajiguda, Hyderabad   (iii). Address2 : NIL   (iv). State : Telangana   (v). District : Hyderabad   (vi). Pin : 500082   (vii). Landmarks : NIL   (viii). Email address : powerapprovals@axisenergy.in   (ix). Landline Telephone No. : 040-23412312   (x). Fax No. : NIL   (xi). Mobile No. : 9166162200   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Sanjay   (ii). Middle Name: NIL   (iii). Last Name: Purohit   (iv). Gender: Male   (v). Designation: Authorized Signatory   (vi). Address 1: Sanjay Purohit S/o Nemraj Purohit, Merta House, Opposite Police Chowki, Jalori Gate, Jodhpur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jodhpur   (x). Tehsil: Jodhpur   (xi). Pin: 342001   (xii). Landmarks: NIL   (xiii). Email Address: powerapprovals@axisenergy.in   (xiv). Landline Telephone No.: NIL   (xv). Fax No.: NIL   (xvi). Mobile No.: 9166162200   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur Territorial0.17540.215
Total0.17540.215
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur0.17540.215
Total0.17540.215
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Badi Sird0.17523.317
2Kan Singh Ki Sird016.898
0.175 40.215
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation Area04.59
2Stringing Area0.07515.2679
3Remaining ROW0.120.3571
Total 0.175 40.215
C. Maps of forest land proposed to be diverted
Division 1. : Jodhpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.175   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : Two
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.0875    View File
2.0.0875    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Only Single NH Crossing is Involved.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 2   (iii). Temporary Employment(Number of person-days): 250
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1Reply of 19.01.2023 EDS.
2NHAI NoC.
3MoEF&CC Reply of EDS Raised on dated 28.08.2023.
4Reply of EDS Raised On dated 10.05.2023.
5Gazette Notification Copy.
6Project report.
7Wild Life NOC.
8BG letter for NHAI NoC.
9JUSTIFICATION FOR LOCATING PROJECT IN FOREST AREA.
10UNDERTAKING FOR FRA CERTIFICATE.
11Administrative and Financial Approval.
12COMPLETE ALIGNMENT TOWER COORDINATES.
13Component Wise Area Calculation Sheet.
14Details of Permanent Employment to be generated.
15CERTIFICATE FOR MINIMUM USE OF FOREST LAND.
16UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING TRANSMISSION LINE.
17Undertaking for Muck Disposal Plan.
18Undertaking for SUBMISSION OF NHAI NOC.
19UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND.
20Undertaking for no Deemed Forest Land is involved in Proposed Transmission Line.
21UNDERTAKING FOR NO ANY OTHER FEASIBLE ALTERNATIVE.
22UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION.
23UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.
24Undertaking for Payment of Cost of Medicinal Plant under Transmission line.
25UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST LAND.
26UNDERTAKING FOR PAYMENT OF CA ON TWO TIME DEGRADED FOREST LAND IF APPLICABLE.
27Undertaking for Use of Any Material From Forest Land.
28UNDERTAKING FOR USE OF FOREST LAND.
29Undertaking to Pay the Cost of Plantation.
30Segment wise Area Calculation Sheet.
31Village Wise Area Calculation sheet.
32Khasra Map and Jamabandi Nakal.
33Bar Chart Status.
34Geo Referenced Digital Map 50000 scale.
35Geo Referenced Digital Map zoom view with Coordinates.
36Geo Referenced Toposheet Map 50000 scale.
37Geo Referenced Full Toposheet Map 50000 scale 45A7.
38Company Incorporation Documents.