FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/36930/2018   (ii). Name of Project for which Forest Land is required : Naugaon to Selakot Kane Rikhad Mehragaon Link Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This is a PMGSY Link road length 16.00 Km. The Project requires 8.96 Hec. Forest Land and 2.24 Hec. Nap Land. The road will Start from Chalnichina which is at Km. 11.00 of Suwakhan Chharoja M.R. and end point of road is Mehragaon.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1275   (viii). Area of forest land proposed for diversion(in ha.): 8.96   (ix). Non-forest land required for this project(in ha.): 2.658   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PMGSY   (ii). Address1 : PMGSY IRRIGATION DIVISION PWD ALMORA   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263601   (vii). Landmark : LOWER MALL ROAD   (viii). Email address : eepmgsyalmora1@rediffmail.com   (ix). Landline Telephone No. : 5962-233732   (x). Fax No. : 5962-5962   (xi). Mobile No. : 9412035453   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: himanshu   (ii). Middle Name: NIL   (iii). Last Name: pant   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: PMGSY IRRIGATION DIVISION PWD ALMORA   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Almora   (xi). Pin: 263601   (xii). Landmark: LOWER MALL ROAD   (xiii). Email Address: eepmgsyalmora1@rediffmail.com   (xiv). Landline Telephone No.: 5962-233732   (xv). Fax No.: 05962233732   (xvi). Mobile No.: 9012075816   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Civil Soyam,Almora8.962.658
Total8.962.658
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora8.962.658
Total8.962.658
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1RF Selakot comp-1&20.280
2Naugaon2.170.861
3Meharagaon1.450.87
4Selakot2.170.547
5Kot2.890.38
Total 8.96 2.658
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Construction8.962.239
2Muck Disposal00.419
Total 8.96 2.658
C. Maps of forest land proposed to be diverted
Division 1. : Civil Soyam,Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 8.96   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.96    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 37000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Almora
  (a). Village: Dyari   (b). Area(in ha.): 17.92   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 054   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Alter Net Alignment
2Bar Chart
3CA Scheme
4Certificate Work has not been statred
5Check List
6Geological Report
7Muck Disposal Plan
8NOC of Local Gram Shabha
9Related Certificate
10Road Side Plantation
11Task Force Report
12Aerial distance.pdf
13hard copy recving
14benefited habitation
15Lenght and Width Details of the Road
16NPV
17reply of EDS
18Administrative and financial Sanction of the Project.
19Certificate that no historical monumental or religious place will be affected
20Undertaking to provide alternative fuel wood ,kerosene or LPG to labourers involved in the projectUndertaking to provide alternative fuel wood ,kerosene or LPG to labourer involved in the project
21Undertaking regarding no animal will be affected side plantation
22certificate that no violation of the FA 1980 has taken place
23Manak shartein
24Details of trees with their Scientific Name
25Land schedule
26No alternative suitable non-forest land is available for the project and that demand is barest to the minimum
27reply of EDS dt 29 feb 2020