FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/MZ/ROAD/117867/2020
(ii). Name of Project for which Forest Land is required :
Rehabilitation and Up-gradation to 2-lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing Chainage km 0+000 to km 69+015 (Design Chainage km 0+000 to km 62+200)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The existing road is a single lane BT surface road, which was constructed by BRO in year 1961 to 1965 and maintained upto 2016 by PWD. At present the road is badly damaged and deteriorated because of inadequate and improper road side drainage system. Due to this prevailing road condition the travel
(iv). State :
Mizoram
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
99739
(viii). Area of forest land proposed for diversion(in ha.):
27.850022
(ix). Non-forest land required for this project(in ha.):
102.064888
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
NHIDCL
(ii). Address1 :
NHIDCL OFFICE,EDDIE KHAWLHRING BUILDING, NIKANG VENG, CP ROAD, TLANGNUAM, AIZAWL
(iii). Address2 :
NIL
(iv). State :
Mizoram
(v). District :
Aizawl
(vi). Pin :
796005
(vii). Landmark :
NEAR PLAYGROUND
(viii). Email address :
aizawl.nhidcl@gmail.com
(ix). Landline Telephone No. :
11-23461603
(x). Fax No. :
11-
(xi). Mobile No. :
9414370651
(xii). Website (if any) :
www.nhidcl.com
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
ASHOK
(ii). Middle Name:
KUMAR
(iii). Last Name:
SHRIVASTAVA
(iv). Gender:
Male
(v). Designation:
GM
(vi). Address 1:
NHIDCL OFFICE, Project Monitoring Unit-Seling, Mizoram, C/o Tourist Lodge Thingsulthliah
(vii). Address 2:
Near Power House on Hospital Road
(viii). State:
Mizoram
(ix). District:
Aizawl
(x). Tehsil:
NIL
(xi). Pin:
796161
(xii). Landmark:
Tourist Lodge Thingsulthliah
(xiii). Email Address:
pmu.seling@nhidcl.com
(xiv). Landline Telephone No.:
389-2950166
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9818941494
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Approved
FP/MZ/ROAD/23965/2017
No. 3-MZ C 076/2017-SHI/830-831
11.61
0
18 May 2018
20 Aug 2019
Total
11.61
0
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Aizawl
21.121033
81.355124
2.
Champhai
6.728989
20.709764
Total
27.850022
102.064888
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Aizawl
21.121033
81.355124
1.
Champhai
6.728989
20.709764
Total
27.850022
102.064888
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Thingsulthliah
4.269654
21.916477
2
Keifang (pkg-1)
1.829619
0.252403
3
Keifang (pkg-2)
1.526247
42.85916
4
Ruallung/Rulchawm (pkg-3)
5.991991
15.62823
5
Ruallung/Rulchawm (pkg-4)
7.503522
0.698854
6
Dulte
6.728989
20.709764
Total
27.850022
102.064888
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Design Chainage km 9.520 to 12.400
4.269654
21.916477
2
Design Chainage km 12.400 to 13.510
1.829619
0.252403
3
Design Chainage km 13.510 to 14.510
1.526247
42.85916
4
Design Chainage km 41.480 to 45.040
5.991991
15.62823
5
Design Chainage km 45.040 to 49.132
7.503522
0.698854
6
Design Chainage km 49.132 to 53.960
6.728988
20.709764
Total
27.850021
102.064888
C.
Maps of forest land proposed to be diverted
Division 1. : Aizawl
(i). Area of forest land proposed to be diverted(in ha.) :
21.121033
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Five
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
4.26
View File
2.
1.82
View File
3.
1.52
View File
4.
5.99
View File
5.
7.5
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Champhai
(i). Area of forest land proposed to be diverted(in ha.) :
6.728989
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
6.72
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
Nil
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
50
(iii). Temporary Employment(Number of person-days):
2000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Forest Area intimation by DFO Champhai
2
Technical Report
3
Undertaking for No additional Path
4
Undertaking for No change in Layout
5
Undertaking for No Transfer of Forest land
6
Undertaking for NPV & Addl NPV
7
Undertaking for Survey by Total Station
8
Undertaking for use of Fuel
9
Block Map of Aizawl District
10
Block Map of Saitual District
11
Block Map of Khawzawl District
12
Proof of submission of Proposal in Hardcopy in 03 sets
13
Compliance to EDS of DFO Aizawl for CA land request to Revenue Dept Govt. of Mizoram
14
Mutation of 29.080 Ha of non-forest land in lieu of 27.850022 of forest lands
15
EDS Reg:As desired, the compliance is hereby submitted. It is requested to make further processing for Stage I Approval.
16
Reply of EDS sought by DFO Champhai
17
REPLY TO EDS 4
18
REPLY TO EDS 3
19
REPLY TO EDS 7 & 8
Print