Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/02/2015
|
Kindly submit EDS
|
|
2
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
18/02/2015
|
sir, signed copy of site inspection report is uploaded.
|
|
3
|
Regional Office
|
EDS
|
State secretary
|
01/04/2015
|
1. Land suitability certificate and digital map of proposed CA site has not been provided.
2. CA scheme file is neither available online nor it has been submitted with hard copy.
3. Details of amount of NPV to be deposited have not been provided
4. Certificate under Forest Rights Act-2006, has not been submitted in the prescribed format along with prescribed annexures.
5. In layout plan latitude and longitude of different points are given but it serves no purpose because it can not be made out to which points these references relate to. Proper digital map mentioning latitude and longitude may be submitted.
|
|
4
|
State secretary
|
EDS
|
Nodal Officer
|
21/09/2015
|
Kindly send the required information by GOI
|
|
5
|
Nodal Officer
|
EDS
|
CF (Kota)
|
22/09/2015
|
Kindly find an attachment of EDS raised by GOI dated 01.04.2015
|
|
6
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
23/09/2015
|
kindly submit EDS
|
|
7
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
06/10/2015
|
Kindly reply the EDS pointwise online
|
|
8
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
06/10/2015
|
letter not visible
|
|
9
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
06/10/2015
|
letter is given in hard copy. kindly reply EDS online
|
|
10
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
17/11/2015
|
Reply enclosed nor NA please
|
|
11
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
04/12/2015
|
EDS replied and forwarded for kind and necessary action.
|
|
12
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
07/12/2015
|
correction have been made by DCF Baran
|
|
13
|
Nodal Officer
|
EDS
|
CF (Kota)
|
09/12/2015
|
Kindly provide information as required by MOEF CC
|
|
14
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
11/12/2015
|
Kindly provide information as required by MOEF CC Lucknow
|
|
15
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
15/12/2015
|
Kindly rectified the observations by Moef & CC and send the desired information/documents immediately.
|
|
16
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
24/12/2015
|
Reply of EDS enclosed and other Required Documents enclosed in Draft mode of the proposals
|
|
17
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
15/01/2016
|
Reply of EDS enclosed in Draft mode annexures in prescribed format. revised kml file is attached in Draft mode also by user agency. submitted to NA please
|
|
18
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
18/01/2016
|
the observation by moef & cc with respected letter referred by DCF Baran have been removed by user agency hence the proposals are being forwarded for further n/a please.
|
|
19
|
Nodal Officer
|
EDS
|
CF (Kota)
|
02/02/2016
|
Some information are required. 1. Land suitability certificate 2. CA scheme 3. Details of NPV
|
|
20
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
05/02/2016
|
Kindly provide information as required by MOEF CC
|
|
21
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
08/02/2016
|
kindly reply EDS
|
|
22
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
17/02/2016
|
Reply of EDS- 1.Land Suatability Certificate attached in Draft mode 2.CA Scheme Letter Attached in Draft mode 3.Details of NPV Attched in Draft mode for further Action Please
|
|
23
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
21/02/2016
|
EDS replied
|
|
24
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
23/02/2016
|
CA-Scheme is not proper the modal cost rates are 166 while the rates have been revised. So CA-Scheme should be as per revised wage rates.
|
|
25
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
25/02/2016
|
CA amount will be demanded from user agency based on revised rates. CA scheme is a model which is same as uploaded along with the proposal
|
|
26
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
25/02/2016
|
Forwarded for necessary action.
|
|
27
|
Nodal Officer
|
REPLY
|
State secretary
|
04/03/2016
|
Compliance of EDS of MOEF lucknow regarding Digital map land suitability certificate NPV calculation revised FRA certificate CA Scheme has been provided by User Agency in part I of the proposal online. Hence the proposal is forwarded for further action
|
|
28
|
State secretary
|
REPLY
|
Regional Office
|
15/03/2016
|
Agreed with the comments of APCCF & Nodal Officer FCA, Rajasthan-Jaipur. Kindly process the proposal.
|
|
29
|
Regional Office
|
EDS
|
State secretary
|
06/04/2016
|
Digital Map
|
|
30
|
State secretary
|
EDS
|
Nodal Officer
|
07/04/2016
|
Kindly provide required information by GOI.
|
|
31
|
Nodal Officer
|
EDS
|
CF (Kota)
|
11/04/2016
|
Quarry regarding KMl file raised by MOEF. Kindly provide information
|
|
32
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
11/04/2016
|
Quarry regarding KMl file raised by MOEF. Kindly provide information
|
|
33
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
20/04/2016
|
Quarry regarding KMl file raised by MOEF. Kindly provide information
|
|
34
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
28/04/2016
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
04/05/2016
|
As per reply given by UA corrections incorporated and same is forwarded for further action.
|
|
36
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
09/05/2016
|
Necessary correction have been made in DGPS Map and the Revised and Updated rates will be shown after FSC.
|
|
37
|
Nodal Officer
|
EDS
|
CF (Kota)
|
17/05/2016
|
KML file are in polyline. Please provide KML file in Polygon shape.
|
|
38
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
18/05/2016
|
KML file are in polyline. Please provide KML file in Polygon shape.
|
|
39
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
09/06/2016
|
Replay to EDS
|
|
40
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
19/06/2016
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
24/06/2016
|
Digital maps in polygon formet recived by user agency and submitted for NA please
|
|
42
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
28/06/2016
|
Correction have been made by DCF Baran. So proposal forwarded for n/a.
|
|
43
|
Nodal Officer
|
REPLY
|
State secretary
|
06/07/2016
|
Compliance of EDS for digital map has been done by UA. Hence the proposal is forwarded.
|
|
44
|
State secretary
|
REPLY
|
Regional Office
|
05/08/2016
|
Agreed with the comments of APCCF & Nodal Officer FCA, Rajasthan-Jaipur. Kindly process the proposal.
|
|