Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
18/02/2015
|
Kindly submit EDS
|
|
2
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
18/02/2015
|
sir, part II was earlier uploaded but was not reflecting. Spoke to FCA helpline Delhi and problem is resolved.
|
|
3
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
18/02/2015
|
sir, part II was earlier uploaded but was not reflecting. Spoke to FCA helpline Delhi and problem is resolved.
|
|
4
|
Regional Office
|
EDS
|
State secretary
|
01/04/2015
|
1. Land suitability certificate and digital map of proposed CA site has not been provided.
2. CA scheme file is neither available online nor it has been submitted with hard copy.
3. Details of amount of NPV to be deposited have not been provided
4. Certificate under Forest Rights Act-2006, has not been submitted in the prescribed format along with prescribed annexures.
5. In layout plan latitude and longitude of different points are given but it serves no purpose because it can not be made out to which points these references relate to. Proper digital map mentioning latitude and longitude may be submitted.
|
|
5
|
State secretary
|
EDS
|
Nodal Officer
|
21/09/2015
|
Kindly send the required information by GOI
|
|
6
|
Nodal Officer
|
EDS
|
CF (Kota)
|
22/09/2015
|
Kindly find an attachment of EDS raised by GOI dated 01.04.2015
|
|
7
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
23/09/2015
|
kindly submit EDS
|
|
8
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
06/10/2015
|
Reply the EDS point wise
|
|
9
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
17/11/2015
|
Reply enclosed nor NA please
|
|
10
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
04/12/2015
|
EDS replied and forwarded for kind and necessary action.
|
|
11
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
07/12/2015
|
correction have been made by DCF Baran
|
|
12
|
Nodal Officer
|
EDS
|
CF (Kota)
|
09/12/2015
|
Kindly provide information as required by MOEF CC Lucknow
|
|
13
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
11/12/2015
|
Kindly provide information as required by MOEF CC Lucknow
|
|
14
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
15/12/2015
|
Kindly rectified the observations by Moef & CC and send the desired information/documents immediately.
|
|
15
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
22/12/2015
|
reply of the EDS enclosed and all necessary documents is enclosed in Draft mode i.e. Revised KML file for the road and alternate land , SDM and gramsabha proceedings in prescribed format
|
|
16
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
15/01/2016
|
Reply of EDS enclosed in Draft mode annexures in prescribed format. revised kml file is attached in Draft mode also by user agency. submitted to NA please
|
|
17
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
18/01/2016
|
the observation by moef & cc with respected letter referred by DCF Baran have been removed by user agency hence the proposals are being forwarded for further n/a please.
|
|
18
|
Nodal Officer
|
EDS
|
CF (Kota)
|
01/02/2016
|
Some information are required in context of EDS raised by GOI. 1. Land suitability certificate 2. KML file of CA land 3. CA scheme 4. Details of NPV
|
|
19
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
05/02/2016
|
Kindly provide information as required by MOEF CC
|
|
20
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
08/02/2016
|
kindly reply EDS
|
|
21
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
27/02/2016
|
Reply of EDS:- 1.Land suitability certificate 2.CA Scheme attached 3.Details of NPV amount 4.KML file of CA land attached. all documents attached in Draft mode.
|
|
22
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
07/04/2016
|
EDS replied
|
|
23
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
12/04/2016
|
EDS not properly replied 1. CA Scheme incomplete 2.NPV details scanned copy of the NPV is distorted 3. Differentiate between forest area and non forest area on KML file and DGPS maps
|
|
24
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
20/04/2016
|
EDS not properly replied 1. CA Scheme incomplete 2.NPV details scanned copy of the NPV is distorted 3. Differentiate between forest area and non forest area on KML file and DGPS maps
|
|
25
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
01/05/2016
|
The correction have been made as per the instruction received
|
|
26
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
06/05/2016
|
EDS replied
|
|
27
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
09/05/2016
|
Necessary correction have been made in DGPS Map and the Revised and Updated rates will be shown after FSC.
|
|
28
|
Nodal Officer
|
EDS
|
CF (Kota)
|
17/05/2016
|
KML file is not uploaded. therefore the proposal could not process. Kindly provide KML file.
|
|
29
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
18/05/2016
|
KML file is not uploaded. therefore the proposal could not process. Kindly provide KML file.
|
|
30
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
09/06/2016
|
Replay to EDS
|
|
31
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
19/06/2016
|
The correction have been made as per the instruction received
|
|
32
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
24/06/2016
|
Digital maps in polygon formet recived by user agency and submitted for NA please
|
|
33
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
28/06/2016
|
Correction have been made by DCF Baran. So proposal forwarded for n/a.
|
|
34
|
Nodal Officer
|
EDS
|
CF (Kota)
|
14/07/2016
|
Some additional information are required. Kindly provide.
|
|
35
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/07/2016
|
Some additional information are required. Kindly provide.
|
|
36
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
27/07/2016
|
Some additional information are required. Kindly provide.
|
|
37
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
02/06/2017
|
The correction have been made as per the instruction received
|
|
38
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
27/06/2017
|
The correction have been made as per the instruction received
|
|
39
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
03/07/2017
|
Correction have been made by DCF Baran for forwarded n/a
|
|
40
|
Nodal Officer
|
EDS
|
CF (Kota)
|
28/07/2017
|
Kindly provide information as per attached document.
|
|
41
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
31/07/2017
|
Kindly provide information as per attached document.
|
|
42
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
25/08/2017
|
Kindly provide information as per attached document
|
|
43
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
14/09/2017
|
The correction have been made as per the instruction received
|
|
44
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
28/09/2017
|
The essential details have been attached
|
|
45
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
06/10/2017
|
The correction have been made as per the instruction received
|
|
46
|
Nodal Officer
|
EDS
|
CF (Kota)
|
08/01/2018
|
Kindly provide complete information as per attached documents.
|
|
47
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
08/01/2018
|
Kindly provide complete information as per attached documents.
|
|
48
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
09/01/2018
|
Essential Details Sought by Forest Department
|
|
49
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
12/01/2018
|
The correction have been made as per the instruction received
|
|
50
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
23/01/2018
|
Essential Details Sir plz attached file
|
|
51
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
25/01/2018
|
Kindly provide complete information as per attached documents.
|
|
52
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
29/01/2018
|
Essential Details Sir plz Attached file
|
|
53
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
29/01/2018
|
The correction have been made as per the instruction received
|
|
54
|
Nodal Officer
|
EDS
|
CF (Kota)
|
27/02/2018
|
Your reply is not satisfactory. Kindly provide information as per attached document.
|
|
55
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
27/02/2018
|
Your reply is not satisfactory. Kindly provide information as per attached document.
|
|
56
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
28/02/2018
|
Essential Details Sought by Forest Department
|
|
57
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
19/03/2018
|
The correction have been made as per the instruction received
|
|
58
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
24/05/2018
|
Essential Details Sought by Forest Department
|
|
59
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
16/06/2018
|
The correction have been made as per the instruction received
|
|
60
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
17/06/2018
|
Essential Details sir plz attached file
|
|
61
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
18/06/2018
|
the correction have been made as per the instruction received.
|
|
62
|
Nodal Officer
|
EDS
|
CF (Kota)
|
24/07/2018
|
Kindly provide information as per attached document.
|
|
63
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
25/07/2018
|
Kindly provide information as per attached document.
|
|
64
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
31/10/2018
|
Essential Details Sir plz attached file
|
|
65
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
14/11/2018
|
The correction have been made as per the instruction received
|
|
66
|
Nodal Officer
|
EDS
|
CF (Kota)
|
31/12/2018
|
DCF submit the information on one hard copy but not furnish in online proposal part II. Kindly submit all the information in part II and give 2 additional copy.
|
|
67
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
02/01/2019
|
DCF submit the information on one hard copy but not furnish in online proposal part II. Kindly submit all the information in part II and give 2 additional copy.
|
|
68
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
22/01/2019
|
Essential Details sir pls attached file
|
|
69
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
07/02/2019
|
The correction have been made as per the instruction received 31.12.2018
|
|
70
|
Nodal Officer
|
EDS
|
CF (Kota)
|
29/03/2019
|
Hard copy not received of correction which you made till 29.3.2019. Kindly provide hard copy
|
|
71
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
02/04/2019
|
Hard Copy Direct sent by DCF Baran wide letter no. 16165 dt. 31.10.2018 and this office has been also sent forwarding letter no. 8057 dt. 13.11.2018.
|
|
72
|
Nodal Officer
|
EDS
|
CF (Kota)
|
03/04/2019
|
Kindly read the observation dated 31.12.2018. DCF submit the information on one hard copy but not furnish in online proposal part II. Kindly submit all the information in part II and give 2 additional copy.do not send the proposal without reading the observation.
|
|
73
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
04/04/2019
|
Kindly read the observation dated 31.12.2018. DCF submit the information on one hard copy but not furnish in online proposal part II. Kindly submit all the information in part II and give 2 additional copy.do not send the proposal without reading the observation.
|
|
74
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
09/05/2019
|
Essential Details
|
|
75
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/05/2019
|
Kindly provide information as per attached document.
|
|
76
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
28/05/2019
|
Essential Details sir please attached file
|
|
77
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
03/06/2019
|
The correction have been made as per the instruction received 31.12.2018
|
|
78
|
Nodal Officer
|
EDS
|
CF (Kota)
|
19/08/2019
|
Kindly provide information as per attached document.
|
|
79
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
21/08/2019
|
Kindly provide information as per attached document.
|
|
80
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
20/09/2019
|
Sir attach this file
|
|
81
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
11/03/2020
|
The correction have been made as per the instruction received
|
|
82
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
06/05/2020
|
sr attched file
|
|
83
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
11/06/2020
|
The correction have been made as per the instruction received
|
|
84
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
25/06/2020
|
Replay EDS 16.8.2019
|
|
85
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
25/06/2020
|
Replay EDS 16.8.2019
|
|
86
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
30/06/2020
|
Your uploaded document is not Shown. Please correct document upload
|
|
87
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
30/06/2020
|
Reply EDS 30.6.2020
|
|
88
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
08/07/2020
|
The correction have been made as per the instruction received 19.08.2019
|
|
89
|
Nodal Officer
|
EDS
|
CF (Kota)
|
13/07/2020
|
The following shortcomings are found in the proposal-
1. The document uploaded for authorized person in incomplete. Please upload it completely.
2. Original GT sheet is not uploade and not given in hard copy.
|
|
90
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/07/2020
|
The following shortcomings are found in the proposal- 1. The document uploaded for authorized person in incomplete. Please upload it completely. 2. Original GT sheet is not uploade and not given in hard copy.
|
|
91
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
15/07/2020
|
replay EDS 14.7.2020
|
|
92
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
17/08/2020
|
The correction have been made as per the instruction received
|
|
93
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
08/09/2020
|
please reply EDS
|
|
94
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
21/09/2020
|
The correction have been made as per the instruction received
|
|
95
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
14/10/2020
|
plz replay eds 14-7-2020
|
|
96
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
04/11/2020
|
The correction have been made as per the instruction received
|
|
97
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
04/11/2020
|
sr reply eds 14-7-2020
|
|
98
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
20/11/2020
|
The correction have been made as per the instruction received 13.07.2020
|
|
99
|
Nodal Officer
|
REPLY
|
State secretary
|
01/12/2020
|
Please find attached EDS compliance report.
|
|
100
|
State secretary
|
REPLY
|
Regional Office
|
15/01/2021
|
reply
|
|
101
|
Regional Office
|
EDS
|
State secretary
|
06/04/2021
|
EDS
|
|
102
|
State secretary
|
EDS
|
Nodal Officer
|
19/04/2021
|
please reply the EDS
|
|
103
|
Nodal Officer
|
EDS
|
CF (Kota)
|
22/04/2021
|
Please find attached EDS for compliance.
|
|
104
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
22/04/2021
|
Please find attached EDS for compliance.
|
|
105
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
01/07/2021
|
eds reply plz
|
|
106
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
03/05/2023
|
The correction have been made as per the instruction received
|
|
107
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
04/05/2023
|
The name of the officer employee guilty of Violation has not been submitted by the user agency.
|
|
108
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
16/08/2023
|
The correction have been made as per the instruction received
|
|
109
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
06/09/2023
|
EDS reply please
|
|
110
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
08/09/2023
|
The correction have been made as per the instruction received
|
|
111
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
11/09/2023
|
eds reply
|
|
112
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
21/09/2023
|
The correction have been made as per the instruction received
|
|
113
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
30/10/2023
|
eds reply
|
|
114
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
18/02/2025
|
The correction have been made as per the instruction received
|
|
115
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
04/03/2025
|
plz submit report
|
|
116
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
02/04/2025
|
The correction have been made as per the instruction received
|
|
117
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
07/05/2025
|
please joint report for violation
|
|
118
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
31/07/2025
|
The correction have been made as per the instruction received
|
|