| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
18/10/2021
|
Species wise and girth wise enumeration details of trees at FRL-2 and FRL 4 meter in the proposed forest area is needed to process the proposal. Hence it is directed to do the needful to demarcate the FRL area in the presence of forest authorities and submit the details of submergible area.
|
|
|
2
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
04/01/2022
|
The correction have been made as per the instruction received
|
|
|
3
|
Nodal Officer
|
EDS
|
CF (High Range Circle, Kottayam)
|
23/06/2022
|
Please inform the following
1.Whether the location cited for the project is covered under pattayam or not
2.Whether NOC given from Revenue department.
|
|
|
4
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
28/06/2022
|
Please inform the following 1.Whether the location cited for the project is covered under pattayam or not 2.Whether NOC given from Revenue department.
|
|
|
5
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
04/07/2022
|
Reply to the Query is submitted hereunder for kind information and further action.
1. Patta No. 392/2001 is issued for 0.39 Ha, out of which in survey number 184/7 0.04 Ha is included. The powerhouse (0.012 Ha) area is situated in the above land. Patta is issued under Kerala Land Assignment (Regularisation of encroachment of forest land prior 01.01.1977) rules, 1993, which disreserves conditionally as per rule 3, which are personal cultivation, or for house sites or for shop sites. As micro hydel project is not under the rule 3, FCA clearance is required for power house site (0.012 Ha) also.
2. Since for the purpose of micro hydel power generation, the status of above land is forests, no NOC from revenue department is seen attached.
|
|
|
6
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
15/07/2022
|
Reply dated 4.7.22 may be reviewed and resubmitted
|
|
|
7
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
16/07/2022
|
The power house 0.012 Ha area is also situated in forest land. Hence the project may be accepted. Copy of the Sketch attached
|
|
|
8
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
16/07/2022
|
The correction have been made as per the instruction received
|
|
|
9
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
16/07/2022
|
The power house (0.012 Ha) area is also situated in forest land. Hence the project may be accepted.
|
|
|
10
|
CF (High Range Circle, Kottayam)
|
REPLY
|
Nodal Officer
|
20/09/2022
|
The power house(0.012Ha) is also situated in forest land. Since the powerhouse is also situated in forest, no NOC is attached along with the application. DFO has uploaded the reply.
|
|
|
11
|
Regional Office
|
EDS
|
State secretary
|
16/03/2023
|
State Government has been requested vide IRO letter dated 16-03-2023 to furnish the details of violation taken along with officials involved since the vegetation in the area has been cleared in 2021 as per Google time series and State Governments comments on the earlier diverted proposal.
|
|
|
12
|
State secretary
|
EDS
|
Nodal Officer
|
22/03/2023
|
for furnishing the details sought by MoEF
|
|
|
13
|
Nodal Officer
|
EDS
|
CF (High Range Circle, Kottayam)
|
28/04/2023
|
The information/ clarification sought by MoEF provided for further processing of the proposal.
|
|
|
14
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
19/09/2023
|
The clarification sought by MoEF may be provides. Letter attached for information
|
|
|
15
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
22/02/2025
|
Clarification sought whether the proposed area LA is Pattaya land whose patta was issued in 2009 under regularization of forest encroachment rules 1993. Divisional Surveyor has been surveyed the site and as per the report of the RFO it has been reported vide this office letter dated 14.06.2024 & 06.11.2024 that the proposed site is completely forest land in Thodupuzha reserve.
|
|
|
16
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
27/02/2025
|
The correction have been made as per the instruction received
|
|
|
17
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
27/02/2025
|
Clarification sought whether the proposed area LA is Pattaya land whose patta was issued in 2009 under regularization of forest encroachment rules 1993. Divisional Surveyor has been surveyed the site and as per the report of the RFO it has been reported vide this office letter dated 14.06.2024 & 06.11.2024 that the proposed site is completely forest land in Thodupuzha reserve.
|
|
|
18
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
06/03/2025
|
The work regarding the above project is started before getting approval under FC Act. Hence the report on violation including the name of erring officers is not furnished. Please furnish at the earliest.
|
|
|
19
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
07/03/2025
|
The Division surveyor inspected the said land with Range forest Officer Mullaringd and Range Forest Officer has been reported that the land identified for the said project is not with in the patta land and also stated that the land comes under Thodupuzha Reserve in Mullarigad Range so that the land requested for diversion is fully coming with in the forest land.
|
|
|
20
|
CF (High Range Circle, Kottayam)
|
REPLY
|
Nodal Officer
|
10/03/2025
|
The information/ clarification sought by MoEFCC is furnished for further necessary action.
|
|
|
21
|
Nodal Officer
|
REPLY
|
State secretary
|
16/04/2025
|
Reply to EDS submitted may kindly be seen.
|
|
|
22
|
State secretary
|
REPLY
|
Regional Office
|
26/04/2025
|
reply to EDS submitted for kind perusal
|
|
|
23
|
Head Office
|
EDS
|
State secretary
|
13/06/2025
|
EDS
|
|
|
24
|
State secretary
|
EDS
|
Nodal Officer
|
25/06/2025
|
Urgent action and details
|
|
|
25
|
Nodal Officer
|
EDS
|
CF (High Range Circle, Kottayam)
|
01/07/2025
|
The information/ clarification sought by MoEFCC may be furnished for further necessary action.
|
|
|
26
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
19/07/2025
|
Reply to the query raised by the Nodal Officeron the letter Dated12.06.2025 of MoEF
|
|
|
27
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
01/08/2025
|
Reply to the query iv &v dated 12.06.2025 of by MoEFCC
|
|
|
28
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
02/08/2025
|
The correction have been made as per the instruction received
|
|
|
29
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
02/08/2025
|
No documents related to EDS have been uploaded.
|
|
|
30
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
02/08/2025
|
The correction have been made as per the instruction received
|
|
|
31
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
16/08/2025
|
I am submitting herewith the reply to query i,ii &iii as below.
i. Clarify whether the instant proposal is the first hydro-electric project in the river - An application for Pattayakudy Hydro Electric Project in Edathana thodu, a tributary of Kothamangalam thodu near the Vellakkayam Hydro Electric Project has been submitted through Parivesh Portal and received Stage I approval which is first Hydro Electric project in this river. Pattayakudy Hydro Electric Project and Vellakkayam Hydro Electric Project are tributaries of Kothamangalam thodu in which water flows to Kothamangalam thodu.
ii. Submit an action taken report against the said violation in the instant proposal - As soon as the information regarding the construction of Vellakayam Micro Hydro Electric Project by Mr.Y.Sleeba
|
|
|
32
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
18/08/2025
|
Incomplete Information
|
|
|
33
|
DFO (Kothamangalam)
|
REPLY
|
CF (High Range Circle, Kottayam)
|
18/08/2025
|
Reply to the query attached.
i) whether the instant proposal is the first hydro-electric project in the river :- An application for Pattayakudy Hydro Electric Project in Edathana thodu, a tributary of Kothamangalam thodu near the Vellakkayam Hydro Electric Project has been submitted through Parivesh Portal and received Stage I approval which is first Hydro Electric project in this river.
ii) action taken report against the said violation in the instant proposal :-.As soon as the information regarding the construction of Vellakayam Micro Hydro Electric Project by Mr.Y.Sleebachan was received, the then Mullaringad Range Forest Officer conducted an enquiry in to the matter and issued a stop memo on 01.03.2021. No further violation of Forest Conservation Act of any kind has happened in the a
|
|
|
34
|
CF (High Range Circle, Kottayam)
|
EDS
|
DFO (Kothamangalam)
|
23/08/2025
|
Details on queries 4 and 5 may be furnished from the UA.
|
|
|
35
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
15/09/2025
|
Details on queries 4 and 5 may be furnished from the UA.
|
|
|
36
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
19/09/2025
|
The correction have been made as per the instruction received
|
|
|
37
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
20/09/2025
|
Details of kml files entered is not same as in item B-2.4 Component wise breakup. The proposal is returing on request of UA to upload correct kml files
|
|
|
38
|
User Agency (sleebapower@gmail.com)
|
REPLY
|
DFO (Kothamangalam)
|
29/09/2025
|
The correction have been made as per the instruction received
|
|
|
39
|
DFO (Kothamangalam)
|
EDS
|
User Agency (sleebapower@gmail.com)
|
04/10/2025
|
CIS study report not sumitted. Submit proposal along with CIA or CSS impact acessment report.
|
|