| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
02/11/2020
|
Please provide the all related documents of proposed raod at the earliest.
|
|
|
2
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
04/11/2020
|
The correction have been made as per the instruction received
|
|
|
3
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
13/11/2020
|
Hard copy of the proposals are not received in this office.
|
|
|
4
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
10/12/2020
|
Please attend the observations as raised by the undersigned
|
|
|
5
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
10/02/2021
|
The correction have been made as per the instruction received
|
|
|
6
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
05/03/2021
|
The all documents has amalgamated in each proposal folders by user agency and this office. Submitted for favour of your kind information and further necessary action at your end please.
|
|
|
7
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
08/03/2021
|
Please attend the EDS.
|
|
|
8
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
16/03/2021
|
Please attend the observations as raised by the Worthy CCF Chamba at the earliest
|
|
|
9
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
26/03/2021
|
The correction have been made as per the instruction received
|
|
|
10
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
06/04/2021
|
As desired the correction have been made as per instruction received. Submitted for further necessary at your end, please.
|
|
|
11
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
28/04/2021
|
Please complete the proposal as per copy of EDS is attached.
|
|
|
12
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
29/04/2021
|
Please attend the EDS
|
|
|
13
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
30/04/2021
|
Please attend the EDS as raised by the Nodal Officer at the earliest
|
|
|
14
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
30/04/2021
|
The correction have been made as per the instruction received
|
|
|
15
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
03/05/2021
|
Please provide the hard copies at the earliest before sending the case online
|
|
|
16
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
04/05/2021
|
The correction have been made as per the instruction received
|
|
|
17
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
04/05/2021
|
Hard copies as well as soft copies not received in this office please ensure the submission
|
|
|
18
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
06/05/2021
|
The correction have been made as per the instruction received
|
|
|
19
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
06/05/2021
|
Please provide the hard copies alongwith KML
|
|
|
20
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
06/05/2021
|
The correction have been made as per the instruction received
|
|
|
21
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
07/05/2021
|
Please provide the hard copies of the same as well as KML file to this office at the earliest, so that further action could be initiated accordingly.
|
|
|
22
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
27/05/2021
|
The correction have been made as per the instruction received
|
|
|
23
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
31/05/2021
|
Please provide the hard copies to this office at the earliest
|
|
|
24
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
04/06/2021
|
The correction have been made as per the instruction received
|
|
|
25
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
15/06/2021
|
As desired the necessary correction have been made by user agency and this office. Submitted for favour of information and further necessary action at your end please.
|
|
|
26
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
21/06/2021
|
Point No. 2,3 & 4 are not found attended completely.
|
|
|
27
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
22/06/2021
|
As desired the necessary correction have been made. Submitted for further necessary action at your end please.
|
|
|
28
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
22/06/2021
|
EDS has been attended, reply attached.
|
|
|
29
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
30/06/2021
|
In reply to point No. 4 is not correct. There is difference in the shape and size of CA site digital map and map on toposheet uploaded against column No. 13 iv in online part II. The shape and size of CA site KML file, digital map and map on toposheet should match.
|
|
|
30
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
30/06/2021
|
In reply to point No. 4 is not correct. There is difference in the shape and size of CA site digital map and map on toposheet uploaded against column No. 13 iv in online part II. The shape and size of CA site KML file, digital map and map on toposheet should match.
|
|
|
31
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
02/07/2021
|
Please attend the observation as raised by the worthy CCF Chamba, and resubmit the accurate revised CA Toposheet, Geo-reference, & KML file to this office at the earliest, so that case could be sent to higher ups accordingly.
|
|
|
32
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
05/07/2021
|
The correction have been made as per the instruction received
|
|
|
33
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
05/07/2021
|
The observations not attended properly by your office please do the needful
|
|
|
34
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
05/07/2021
|
The correction have been made as per the instruction received
|
|
|
35
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
07/07/2021
|
As desired the needful has been done
|
|
|
36
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
09/07/2021
|
Needful has been done by the DFO Dalhousie.
|
|
|
37
|
State secretary
|
EDS
|
Nodal Officer
|
23/08/2021
|
ACS raised some observations
|
|
|
38
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
23/08/2021
|
ACS raised some observations
|
|
|
39
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
23/08/2021
|
Please attend the EDS.
|
|
|
40
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
23/08/2021
|
Please attend the EDS as raised by the higher ups
|
|
|
41
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
18/09/2021
|
The correction have been made as per the instruction received
|
|
|
42
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
18/09/2021
|
As desired the necessary geo-logistic report send to your office good office for further necessary action at your end please.
|
|
|
43
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
20/09/2021
|
hard copies are not received in this office.
|
|
|
44
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
22/09/2021
|
Please provide the requisite report of state geo-logist in the possibility of soil erosion & feasibility fo the road
|
|
|
45
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
30/09/2021
|
The correction have been made as per the instruction received
|
|
|
46
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
01/10/2021
|
Hard copies had already been sent to your good office. submitted for further necessary action at your end please.
|
|
|
47
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
08/10/2021
|
EDS is attended please.
|
|
|
48
|
Nodal Officer
|
REPLY
|
State secretary
|
27/10/2021
|
Needful has been done.
|
|
|
49
|
State secretary
|
EDS
|
Nodal Officer
|
25/11/2021
|
ACS forests raised some observations
|
|
|
50
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
25/11/2021
|
ACS forests raised some observations
|
|
|
51
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
26/11/2021
|
ACS forests raised some observations, please attend at the earliest.
|
|
|
52
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
26/11/2021
|
Please provide the third party geological report from NIT at the earliest
|
|
|
53
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
04/03/2022
|
The correction have been made as per the instruction received
|
|
|
54
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
05/03/2022
|
As desired the state Geo-logist report has uploaded by user agency and the same send to your office for further necessary action at your end please.
|
|
|
55
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
08/03/2022
|
Requisite information has directly been sent to your office by DFO Dalhousie please. Submitted for favour of information and necessary action please.
|
|
|
56
|
Nodal Officer
|
REPLY
|
State secretary
|
15/03/2022
|
Needful has been done
|
|
|
57
|
Regional Office
|
EDS
|
State secretary
|
27/04/2022
|
The State Govt. may attend the shortcomings attached herewith
|
|
|
58
|
State secretary
|
EDS
|
Nodal Officer
|
28/04/2022
|
EDS
|
|
|
59
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
28/04/2022
|
EDS
|
|
|
60
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
28/04/2022
|
Please attend the EDS as raised by the GoI.
|
|
|
61
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
05/05/2022
|
Please attend the EDS as raised by the GoI at the earliest please.
|
|
|
62
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
31/05/2022
|
The correction have been made as per the instruction received
|
|
|
63
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
01/06/2022
|
Hard copies not received
|
|
|
64
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
08/06/2022
|
The correction have been made as per the instruction received
|
|
|
65
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
30/06/2022
|
Please upload FRA Certificate in online Part I
|
|
|
66
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
01/07/2022
|
The correction have been made as per the instruction received
|
|
|
67
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
02/07/2022
|
The all observations have been attended by user agency as well as this office submitted for further necessary action at your end please.
|
|
|
68
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
05/07/2022
|
Hard copy of the reply is still not received in this office.
|
|
|
69
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
06/07/2022
|
Hard copies sent to your good office yesterday submitted for your kind information and further necessary action at your end please.
|
|
|
70
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
11/07/2022
|
EDS has been attended please.
|
|
|
71
|
Nodal Officer
|
REPLY
|
State secretary
|
19/07/2022
|
Complete reply is submitted
|
|
|
72
|
State secretary
|
REPLY
|
Regional Office
|
19/07/2022
|
Complete reply is submitted
|
|
|
73
|
Regional Office
|
EDS
|
State secretary
|
08/08/2022
|
The State Govt. may attend the shortcomings attached herewith
|
|
|
74
|
State secretary
|
EDS
|
Nodal Officer
|
10/08/2022
|
EDS
|
|
|
75
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
10/08/2022
|
EDS
|
|
|
76
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
11/08/2022
|
Please attend the EDS raised by the GoI.
|
|
|
77
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
12/08/2022
|
Please attend the EDS at the earliest.
|
|
|
78
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
16/08/2022
|
The correction have been made as per the instruction received
|
|
|
79
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
24/08/2022
|
Hard copies not received regarding FRA in this office till today
|
|
|
80
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
15/09/2022
|
The correction have been made as per the instruction received
|
|
|
81
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
12/10/2022
|
The all observations have been attended as per instruction received submitted for favour of information and further necessary action at your end please.
|
|
|
82
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
17/10/2022
|
EDS
|
|
|
83
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
21/10/2022
|
Please attend the EDS as raised by the CCF Chamba at the earliest.
|
|
|
84
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
07/12/2022
|
The correction have been made as per the instruction received
|
|
|
85
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
28/12/2022
|
All observations has been attended by user agency as well as this office this is for favour of your kind information and further necessary action at your end please.
|
|
|
86
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
23/01/2023
|
EDS raised has been attended by UA and DFO. All the necessary documents have been uploaded on the portal please.
|
|
|
87
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
21/02/2023
|
CCF Chamba has not been uploaded the reply on the Web portal.
|
|
|
88
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
28/02/2023
|
EDS has been attended please.
|
|
|
89
|
Nodal Officer
|
REPLY
|
State secretary
|
13/04/2023
|
Complete reply is submitted
|
|
|
90
|
State secretary
|
REPLY
|
Regional Office
|
13/04/2023
|
Complete reply is submitted
|
|
|
91
|
Regional Office
|
EDS
|
State secretary
|
26/05/2023
|
The State Government may attend the shortcomings attached herewith.
|
|
|
92
|
State secretary
|
EDS
|
Nodal Officer
|
26/05/2023
|
EDS
|
|
|
93
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
26/05/2023
|
EDS
|
|
|
94
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
27/05/2023
|
Minutes of REC- to comply please.
|
|
|
95
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
05/06/2023
|
Minutes of REC- to comply please.
|
|
|
96
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
05/08/2023
|
The correction have been made as per the instruction received
|
|
|
97
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
24/08/2023
|
Attend the EDS
|
|
|
98
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
30/08/2023
|
The correction have been made as per the instruction received
|
|
|
99
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
27/09/2023
|
As desired the all observations have been attended by the user agency as well as this office submitted for further necessary action at your end please.
|
|
|
100
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
29/09/2023
|
Please attend the EDS to complete.
|
|
|
101
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
07/10/2023
|
Please attend the EDS
|
|
|
102
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
21/10/2023
|
The correction have been made as per the instruction received
|
|
|
103
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
30/10/2023
|
Point.1 Undertaking regarding reduce the number of trees is not found uploaded duly authenticated by the concerned DFO.
Point No.4 Undertaking regarding safe disposal of muck and adoption of proper protective measure is not found uploaded.
|
|
|
104
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
28/11/2023
|
The correction have been made as per the instruction received
|
|
|
105
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
05/12/2023
|
Please upload the undertaking regarding reduce the number of trees duly authenticated by the DFO & regarding safe disposal of muck and adoption of proper protective measure seprately and also upload the legible proceedings of FRA.
|
|
|
106
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
08/02/2024
|
The correction have been made as per the instruction received
|
|
|
107
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
19/02/2024
|
As desired needful has been done
|
|
|
108
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
22/02/2024
|
Proof of Legal Status of CA land is not found uploaded.
|
|
|
109
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
22/02/2024
|
As desired needful has been done
|
|
|
110
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
27/02/2024
|
EDS has been attended please.
|
|
|
111
|
Nodal Officer
|
EDS
|
CF (Chamba)
|
29/02/2024
|
None of the observations have been attended properly except point No. 6 . Please go through each observations and submit the reply accordingly.
|
|
|
112
|
CF (Chamba)
|
EDS
|
DFO (Dalhousie)
|
04/03/2024
|
None of the observations have been attended properly except point No. 6 . Please go through each observations and submit the reply accordingly. -- From Nodal Officer FCA--
|
|
|
113
|
DFO (Dalhousie)
|
EDS
|
User Agency (ee-dal-hp@nic.in)
|
06/03/2024
|
None of the observations have been attended properly except point No. 6 . Please go through each observations and submit the reply accordingly. -- From Nodal Officer FCA--
|
|
|
114
|
User Agency (ee-dal-hp@nic.in)
|
REPLY
|
DFO (Dalhousie)
|
12/09/2024
|
The correction have been made as per the instruction received
|
|
|
115
|
DFO (Dalhousie)
|
REPLY
|
CF (Chamba)
|
09/10/2024
|
As desired needful has been done
|
|
|
116
|
CF (Chamba)
|
REPLY
|
Nodal Officer
|
14/10/2024
|
Observations have been attended by UA/DFO
|
|
|
117
|
Nodal Officer
|
REPLY
|
State secretary
|
21/10/2024
|
Complete reply is submitted
|
|
|
118
|
State secretary
|
REPLY
|
Regional Office
|
21/10/2024
|
Complete reply is submitted
|
|