| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
29/05/2017
|
proposal folders have not been received in this office so far
|
|
|
2
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
01/06/2017
|
The correction have been made as per the instruction received
|
|
|
3
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
21/09/2017
|
digital CA map may be sentas peremail sent to your good self
|
|
|
4
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
03/10/2017
|
The correction have been made as per the instruction received
|
|
|
5
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
23/10/2017
|
CA digital map not attached
|
|
|
6
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
27/10/2017
|
The correction have been made as per the instruction received
|
|
|
7
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
10/01/2018
|
The hard copy of the proposal has not been received in this office.Hence,may send the same simultaneously when the case is uploaded on line.
|
|
|
8
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
01/06/2018
|
digital map of CA and PCA required
|
|
|
9
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
07/06/2018
|
The correction have been made as per the instruction received
|
|
|
10
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
19/09/2018
|
Please attend the Observation
|
|
|
11
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
14/11/2019
|
The correction have been made as per the instruction received
|
|
|
12
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
11/03/2020
|
User agency has attended to all observations and all the requisite reports have been uploaded in additional column field.
|
|
|
13
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
18/03/2020
|
EDS
|
|
|
14
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
18/03/2020
|
EDS
|
|
|
15
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
18/03/2020
|
kindly attend to EDS
|
|
|
16
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
28/08/2020
|
The correction have been made as per the instruction received
|
|
|
17
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
01/09/2020
|
EDS raised by the Nodel Officer
|
|
|
18
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
18/09/2020
|
The correction have been made as per the instruction received
|
|
|
19
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
23/09/2020
|
Needful has been done
|
|
|
20
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
26/09/2020
|
EDS
|
|
|
21
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
14/10/2020
|
EDS raised by CCF
|
|
|
22
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
14/10/2020
|
The correction have been made as per the instruction received
|
|
|
23
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
16/10/2020
|
EDS reply.
|
|
|
24
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
20/10/2020
|
Needful has been done.
|
|
|
25
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
24/11/2020
|
No reply to point No. 9 has been given, in reply, need ful has been done has been mentioned. Still no working plan prescription has been given. Now map of CA site on toposheet and digital map of CA site have not been uploaded against appropriate column. Now these maps have been uploaded against additional information detail in online part II.
|
|
|
26
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
14/12/2020
|
EDS
|
|
|
27
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
21/01/2021
|
EDS reply.
|
|
|
28
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
21/01/2021
|
No reply to point No. 9 has been given, in reply, need ful has been done has been mentioned. Still no working plan prescription has been given. Now map of CA site on toposheet and digital map of CA site have not been uploaded against appropriate column. Now these maps have been uploaded against additional information detail in online part II.
|
|
|
29
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
21/01/2021
|
EDS reply.
|
|
|
30
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
21/01/2021
|
Needful has been done.
|
|
|
31
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
10/02/2021
|
Reply of point No. 9 has not been given correct.
|
|
|
32
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
11/02/2021
|
Reply of point No. 9 has not been given correct.
|
|
|
33
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
06/03/2021
|
EDS Reply
|
|
|
34
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
08/03/2021
|
the kml file uploaded on the portal,does not fall in India.
Kindly mention the details of the working plan prescription for the said area proposed to be diverted.
|
|
|
35
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
15/03/2021
|
the kml file uploaded on the portal,does not fall in India.
|
|
|
36
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
17/03/2021
|
The correction have been made as per the instruction received
|
|
|
37
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
19/03/2021
|
EDS reply
|
|
|
38
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
19/03/2021
|
Needful has been done.
|
|
|
39
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
30/03/2021
|
Still no working plan prescription is not clear against column no.5 in part II.
|
|
|
40
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
01/04/2021
|
The working plan prescription is not clear against column no.5 in part II.
|
|
|
41
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
05/04/2021
|
Needful has been done.
|
|
|
42
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
06/04/2021
|
Needful has been done
|
|
|
43
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
09/06/2021
|
A per latest guidelines of GoI, the calculation of penal NPV is also required to be done for the violated area. Further in the uploaded CA scheme and CA scheme placed in the proposal folder, the cost of plants have not been included. Revised CA scheme including the cost of plants is required to be uploaded and placed in the proposal folder.
|
|
|
44
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
10/06/2021
|
A per latest guidelines of GoI, the calculation of penal NPV is also required to be done for the violated area. Further in the uploaded CA scheme and CA scheme placed in the proposal folder, the cost of plants have not been included. Revised CA scheme including the cost of plants is required to be uploaded and placed in the proposal folder.
|
|
|
45
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
28/07/2021
|
Attending the EDS.
|
|
|
46
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
29/07/2021
|
Check list No.17,18, are not found uploaded. In Check list No. 20 the area has again wrongly been mentioned
as 2.289 instead of 0.654 which needs to be corrected and revised check list No. 20 be uploaded accordingly.
|
|
|
47
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
29/07/2021
|
Attending EDS.
|
|
|
48
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
03/08/2021
|
Check list No. 17 & calculation sheet of NPV has not again been found uploaded which may be done.
|
|
|
49
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
10/08/2021
|
Attending EDS by DFO.
|
|
|
50
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
11/08/2021
|
Needful has been done.
|
|
|
51
|
Regional Office
|
EDS
|
State secretary
|
12/10/2021
|
State govt. may attend the shortcomings attached herewith
|
|
|
52
|
State secretary
|
EDS
|
Nodal Officer
|
12/10/2021
|
EDS
|
|
|
53
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
12/10/2021
|
EDS
|
|
|
54
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
13/10/2021
|
EDS
|
|
|
55
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
24/11/2021
|
EDS Raised
|
|
|
56
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
06/01/2022
|
The correction have been made as per the instruction received
|
|
|
57
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
07/01/2022
|
EDS Reply.
|
|
|
58
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
10/01/2022
|
Revised calculation of NPV as submitted in hard copy on 10.01.2022 may be uploaded on web portal also.
|
|
|
59
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
10/01/2022
|
Revised NPV Uploaded in Online Portal.
|
|
|
60
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
10/01/2022
|
Needful has been done
|
|
|
61
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
09/02/2022
|
The reply has not been submitted in hard copy.
|
|
|
62
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
10/02/2022
|
EDS
|
|
|
63
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
17/02/2022
|
EDS Reply.
|
|
|
64
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
25/02/2022
|
Needful has been done.
|
|
|
65
|
Nodal Officer
|
REPLY
|
State secretary
|
10/03/2022
|
Complete reply is submitted
|
|
|
66
|
State secretary
|
REPLY
|
Regional Office
|
10/03/2022
|
Complete reply is submitted
|
|
|
67
|
Regional Office
|
EDS
|
State secretary
|
11/04/2022
|
State Govt. may attend the shortcomings observed in the proposal.
|
|
|
68
|
State secretary
|
EDS
|
Nodal Officer
|
13/04/2022
|
EDS
|
|
|
69
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
13/04/2022
|
EDS
|
|
|
70
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
19/04/2022
|
EDS
|
|
|
71
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
21/04/2022
|
EDS attended
|
|
|
72
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
22/11/2022
|
The correction have been made as per the instruction received
|
|
|
73
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
24/11/2022
|
EDS Reply
|
|
|
74
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
05/12/2022
|
Needful has been done.
|
|
|
75
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
20/12/2022
|
Annexures No. 1 to Annexures No.5 has not been found uploaded with the reply.
|
|
|
76
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
21/12/2022
|
Annexures No. 1 to Annexures No.5 has not been found uploaded with the reply
|
|
|
77
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
21/12/2022
|
Needful has been done
|
|
|
78
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
21/12/2022
|
Needful has been done.
|
|
|
79
|
Nodal Officer
|
REPLY
|
State secretary
|
24/01/2023
|
Complete reply is submitted
|
|
|
80
|
State secretary
|
REPLY
|
Regional Office
|
24/01/2023
|
Complete reply is submitted
|
|
|
81
|
Regional Office
|
EDS
|
State secretary
|
20/02/2023
|
EDS
|
|
|
82
|
State secretary
|
EDS
|
Nodal Officer
|
22/02/2023
|
EDS
|
|
|
83
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
22/02/2023
|
EDS
|
|
|
84
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
22/02/2023
|
EDS
|
|
|
85
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
04/03/2023
|
Please name of the your staff posted in the period 1990 to 2001-02 when the said road was constructed
|
|
|
86
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
16/03/2023
|
The correction have been made as per the instruction received
|
|
|
87
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
16/03/2023
|
Please upload the letter
|
|
|
88
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
16/03/2023
|
The correction have been made as per the instruction received
|
|
|
89
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
23/03/2023
|
Needful has been done
|
|
|
90
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
28/03/2023
|
EDS
|
|
|
91
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
28/03/2023
|
Please attend the observation
|
|
|
92
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
31/03/2023
|
The correction have been made as per the instruction received
|
|
|
93
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
01/04/2023
|
Needful has been done
|
|
|
94
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
03/04/2023
|
EDS
|
|
|
95
|
DFO (Nahan)
|
EDS
|
User Agency (raujifsheikh@gmail.com)
|
03/04/2023
|
Please attend the observation
|
|
|
96
|
User Agency (raujifsheikh@gmail.com)
|
REPLY
|
DFO (Nahan)
|
05/04/2023
|
The correction have been made as per the instruction received
|
|
|
97
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
16/06/2023
|
Needful has been done
|
|
|
98
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
19/06/2023
|
Needful has been done.
|
|
|
99
|
Nodal Officer
|
REPLY
|
State secretary
|
22/06/2023
|
Complete reply is submitted
|
|
|
100
|
State secretary
|
REPLY
|
Regional Office
|
22/06/2023
|
Complete reply is submitted
|
|
|
101
|
Regional Office
|
EDS
|
State secretary
|
12/01/2024
|
REPLY NOT ACCEPTED
|
|
|
102
|
State secretary
|
EDS
|
Nodal Officer
|
15/01/2024
|
EDS
|
|
|
103
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
15/01/2024
|
EDS
|
|
|
104
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
15/01/2024
|
EDS
|
|
|
105
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
25/01/2024
|
Please attend the observation
|
|
|
106
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
07/10/2024
|
The correction have been made as per the instruction received
|
|
|
107
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
21/10/2024
|
Needful has been done
|
|
|
108
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
22/10/2024
|
Please upload all the related document in proper manner.
|
|
|
109
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
23/10/2024
|
Please upload all the related document in proper manner.
|
|
|
110
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
05/11/2024
|
The correction have been made as per the instruction received
|
|
|
111
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
06/11/2024
|
Needful has been done by the UA
|
|
|
112
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
11/11/2024
|
Needful has been done.
|
|
|
113
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
11/11/2024
|
Needful done
|
|
|
114
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
11/11/2024
|
Needful has been done.
|
|
|
115
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
21/11/2024
|
In response to observation No. 1, only status of the road in violation pertains to particular division, whereas, complete status of 2183 roads are to be submitted.
|
|
|
116
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
21/11/2024
|
In response to observation No. 1, only status of the road in violation pertains to particular division, whereas, complete status of 2183 roads are to be submitted.
|
|
|
117
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
21/11/2024
|
In response to observation No. 1, only status of the road in violation pertains to particular division, whereas, complete status of 2183 roads are to be submitted.
|
|
|
118
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
04/03/2025
|
The correction have been made as per the instruction received
|
|
|
119
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
07/03/2025
|
List of 2183 roads has not been attached
|
|
|
120
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
10/03/2025
|
The correction have been made as per the instruction received
|
|
|
121
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
22/03/2025
|
Needful has been done
|
|
|
122
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
24/03/2025
|
Observation as raised by Nodal Officer is not attended , please submit the the complete status of 2183 roads which pertains to 12th Circle Nahan.
|
|
|
123
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
24/03/2025
|
Observation Raised by CF Nahan, Please submit the the complete status of 2183 roads which pertains to 12th Circle Nahan.
|
|
|
124
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
07/04/2025
|
The correction have been made as per the instruction received
|
|
|
125
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
08/04/2025
|
It is intimated by the UA the correction have been made as per the instruction received .
|
|
|
126
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
09/04/2025
|
Forwarded letter of DFO has not been uploaded.
|
|
|
127
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
11/04/2025
|
Needful has been done
|
|
|
128
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
19/04/2025
|
Needful has been done.
|
|
|
129
|
Nodal Officer
|
EDS
|
CF (Nahan)
|
23/04/2025
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one circle does not serve the purpose. please provide the complete status of 2183 roads constructed in violation.
|
|
|
130
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
23/04/2025
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one circle does not serve the purpose. please provide the complete status of 2183 roads constructed in violation.
|
|
|
131
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
30/04/2025
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one circle does not serve the purpose. please provide the complete status of 2183 roads constructed in violation.
|
|
|
132
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
17/02/2026
|
The correction have been made as per the instruction received
|
|
|
133
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
18/02/2026
|
Please submit the copy of EDS Reply
|
|
|
134
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
20/02/2026
|
The correction have been made as per the instruction received
|
|
|
135
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
02/03/2026
|
Needful has been done
|
|
|
136
|
CF (Nahan)
|
EDS
|
DFO (Nahan)
|
03/03/2026
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one division does not serve the purpose. please provide the complete status of 2183 roads constructed in violation alongwith its abstract.
|
|
|
137
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
03/03/2026
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one division does not serve the purpose. please provide the complete status of 2183 roads constructed in violation alongwith its abstract.
|
|
|
138
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
23/03/2026
|
The correction have been made as per the instruction received
|
|
|
139
|
DFO (Nahan)
|
EDS
|
User Agency (hp-nah@nic.in)
|
24/03/2026
|
Complete status of 2183 roads i.e. cases approved, under process and yet to be processed is required. merely submitting the status of one division does not serve the purpose. please provide the complete status of 2183 roads constructed in violation alongwith its abstract.
|
|
|
140
|
User Agency (hp-nah@nic.in)
|
REPLY
|
DFO (Nahan)
|
14/07/2026
|
The correction have been made as per the instruction received
|
|
|
141
|
DFO (Nahan)
|
REPLY
|
CF (Nahan)
|
16/07/2026
|
Needful has been done
|
|
|
142
|
CF (Nahan)
|
REPLY
|
Nodal Officer
|
18/07/2026
|
Needful has been done.
|
|
|
143
|
Nodal Officer
|
REPLY
|
State secretary
|
21/07/2026
|
Complete reply is submitted
|
|
|
144
|
State secretary
|
REPLY
|
Regional Office
|
21/07/2026
|
Complete reply is submitted
|
|