Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
27/04/2016
|
EDS sought
|
|
2
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
19/09/2016
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
29/01/2017
|
Pl complete part I & complete the proposal with nodal division DFO joginder Nagar
|
|
4
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
15/02/2017
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
16/09/2018
|
please attend the observations
|
|
6
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
26/11/2018
|
The correction have been made as per the instruction received
|
|
7
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
26/11/2018
|
Please attend the observation
|
|
8
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
26/11/2018
|
The correction have been made as per the instruction received
|
|
9
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
14/10/2019
|
As discussed ,please do send the required maps and kml files
|
|
10
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
16/10/2019
|
The correction have been made as per the instruction received
|
|
11
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
16/11/2019
|
Submit hard copy in four sets as per guidelines of this office.
|
|
12
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
29/11/2019
|
The correction have been made as per the instruction received
|
|
13
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
04/12/2019
|
Pls submit hard copy.
|
|
14
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
04/12/2019
|
Pls submit hard copy.
|
|
15
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
09/12/2019
|
Hard copy has submitted please.
|
|
16
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
10/12/2019
|
Hard copies has been submitted.
|
|
17
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
13/12/2019
|
Pls resubmit correct case as per EDS dated 13th Dec. 2019
|
|
18
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
13/12/2019
|
Pls resubmit correct case as per EDS dated 13th Dec. 2019
|
|
19
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
16/12/2019
|
Please attend the EDS
|
|
20
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
20/12/2019
|
The correction have been made as per the instruction received
|
|
21
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
24/12/2019
|
EDS attended pl
|
|
22
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
28/12/2019
|
EDS has been attended.
|
|
23
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
18/01/2020
|
Pls attend to EDS dated 15th Jan and resubmit the case after fresh enumeration as discussed during site inspection.
|
|
24
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
18/01/2020
|
Pls attend to EDS dated 15th Jan and resubmit the case after fresh enumeration as discussed during site inspection.
|
|
25
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
24/01/2020
|
Pls attend to EDS dated 15th Jan and resubmit the case after fresh enumeration as discussed during site inspection.
|
|
26
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
29/09/2020
|
The correction have been made as per the instruction received
|
|
27
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
30/09/2020
|
Pl submit the complete case file immediately
|
|
28
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
30/09/2020
|
The correction have been made as per the instruction received
|
|
29
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
08/10/2020
|
EDS has been attended please
|
|
30
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
08/10/2020
|
EDS
|
|
31
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
08/10/2020
|
The correction have been made as per the instruction received
|
|
32
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
08/10/2020
|
EDS has been attened.
|
|
33
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
12/10/2020
|
EDS
|
|
34
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
12/10/2020
|
EDS
|
|
35
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
14/10/2020
|
resubmitted as discussed.
|
|
36
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
22/10/2020
|
EDS has been attended
|
|
37
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
05/11/2020
|
Please complete the proposal as per copy of EDS is attached.
|
|
38
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
06/11/2020
|
EDS
|
|
39
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
06/11/2020
|
EDS
|
|
40
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
06/11/2020
|
EDS
|
|
41
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
01/12/2020
|
The correction have been made as per the instruction received
|
|
42
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
03/12/2020
|
EDS has been attended pl.
|
|
43
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
03/12/2020
|
EDS has been attended.
|
|
44
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
03/12/2020
|
EDS
|
|
45
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
03/12/2020
|
EDS has been attended.
|
|
46
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
11/12/2020
|
EDS has been attended.
|
|
47
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
04/01/2021
|
EDS
|
|
48
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
04/01/2021
|
pl. attend the EDS raised by Nodal Officer
|
|
49
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
04/01/2021
|
Please attend the EDS
|
|
50
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
07/01/2021
|
The correction have been made as per the instruction received
|
|
51
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
11/01/2021
|
EDS has been attended
|
|
52
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
23/01/2021
|
EDS has been attended please.
|
|
53
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
18/02/2021
|
All the CA scheme place in the proposal folders are on old wage rates. The cost of trees has not been found calculated in respected of Joginder Nagar Forest Division
|
|
54
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
19/02/2021
|
All the CA scheme place in the proposal folders are on old wage rates. The cost of trees has not been found calculated in respected of Joginder Nagar Forest Division
|
|
55
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
23/02/2021
|
EDS has been attended please
|
|
56
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
05/03/2021
|
EDS has been attended
|
|
57
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
23/03/2021
|
There is difference in CA scheme uploaded & detail of patches of CA in respect of J/Nagar Division.
|
|
58
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
23/03/2021
|
There is difference in CA scheme uploaded & detail of patches of CA in respect of J/Nagar Division.
|
|
59
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
23/03/2021
|
EDS has been attended pl.
|
|
60
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
23/03/2021
|
EDS has been attended to by DFO J/Nagar please.
|
|
61
|
State secretary
|
EDS
|
Nodal Officer
|
20/07/2021
|
For uploading PDF of Complete folder in part I
|
|
62
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
20/07/2021
|
For uploading PDF of Complete folder in part I
|
|
63
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
20/07/2021
|
For uploading PDF of Complete folder in part I
|
|
64
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
20/07/2021
|
For uploading PDF of Complete folder in part I
|
|
65
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
22/07/2021
|
For uploading PDF of complete folder in part-I
|
|
66
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
23/07/2021
|
The correction have been made as per the instruction received
|
|
67
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
24/07/2021
|
PDF of complete proposal folder has been uploaded by user agency in part-I
|
|
68
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
24/07/2021
|
EDS has been attended & the correction have been made as per instruction.
|
|
69
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
26/07/2021
|
EDS has been attended to by DFOs concerned please.
|
|
70
|
Nodal Officer
|
REPLY
|
State secretary
|
30/07/2021
|
Correction have been made
|
|
71
|
Head Office
|
EDS
|
State secretary
|
02/09/2021
|
eds
|
|
72
|
State secretary
|
EDS
|
Nodal Officer
|
06/09/2021
|
EDS
|
|
73
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
06/09/2021
|
EDS
|
|
74
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
13/09/2021
|
EDS
|
|
75
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
13/09/2021
|
EDS
|
|
76
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
13/09/2021
|
Please attend the EDS
|
|
77
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
29/12/2021
|
The correction have been made as per the instruction received
|
|
78
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
18/01/2022
|
Please submit the required certificates/ documents as discussed.
|
|
79
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
10/02/2022
|
The correction have been made as per the instruction received
|
|
80
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
15/02/2022
|
The reply of the observation has been attended and same stand submitted to Nodal officer cum DFO Jogindernagar.
|
|
81
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
15/02/2022
|
EDS has been attended please.
|
|
82
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
15/02/2022
|
EDS
|
|
83
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
15/02/2022
|
EDS
|
|
84
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
18/02/2022
|
EDS has been attended please.
|
|
85
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
18/02/2022
|
EDS has been attended.
|
|
86
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
28/02/2022
|
EDS has been attended please.
|
|
87
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
08/03/2022
|
eds
|
|
88
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
10/03/2022
|
EDS
|
|
89
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
10/03/2022
|
EDS
|
|
90
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
10/03/2022
|
Please attend the EDS
|
|
91
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
15/03/2022
|
The correction have been made as per the instruction received
|
|
92
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
16/03/2022
|
Objections are attended by the user agency
|
|
93
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
16/03/2022
|
The correction have been made as per the instruction received
|
|
94
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
16/03/2022
|
EDS has been attended please.
|
|
95
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
16/03/2022
|
EDS have been attended.
|
|
96
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
23/03/2022
|
needful has been done
|
|
97
|
Nodal Officer
|
REPLY
|
State secretary
|
26/03/2022
|
Complete reply is submitted
|
|
98
|
State secretary
|
REPLY
|
Head Office
|
28/03/2022
|
Complete reply is submitted
|
|
99
|
Head Office
|
EDS
|
State secretary
|
24/05/2022
|
EDS by MoEF
|
|
100
|
State secretary
|
EDS
|
Nodal Officer
|
25/05/2022
|
EDS
|
|
101
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
25/05/2022
|
EDS
|
|
102
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
30/05/2022
|
EDS
|
|
103
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
30/05/2022
|
EDS
|
|
104
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
30/05/2022
|
Please attend the EDS
|
|
105
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
15/07/2022
|
The correction have been made as per the instruction received
|
|
106
|
DFO (Mandi)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
15/07/2022
|
EDS
|
|
107
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
15/07/2022
|
The correction have been made as per the instruction received
|
|
108
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtpbnhppcl@gmail.com)
|
15/07/2022
|
attend to EDS
|
|
109
|
User Agency (gmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
15/07/2022
|
The correction have been made as per the instruction received
|
|
110
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
27/07/2022
|
EDS has been attended please.
|
|
111
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
28/07/2022
|
EDS has been attended.
|
|
112
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
29/07/2022
|
EDS has been attended please.
|
|
113
|
Nodal Officer
|
REPLY
|
State secretary
|
18/08/2022
|
Complete reply is submitted
|
|
114
|
State secretary
|
REPLY
|
Head Office
|
18/08/2022
|
Complete reply is submitted
|
|
115
|
Head Office
|
EDS
|
State secretary
|
03/10/2022
|
eds
|
|
116
|
State secretary
|
EDS
|
Nodal Officer
|
12/10/2022
|
EDS
|
|
117
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
14/10/2022
|
EDS
|
|
118
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
14/10/2022
|
EDS
|
|
119
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
14/10/2022
|
EDS
|
|
120
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
17/10/2022
|
EDS has been attended.
|
|
121
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
17/10/2022
|
EDS has been attended please.
|
|
122
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
17/11/2022
|
EDS has been attended please.
|
|
123
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
17/12/2022
|
EDS
|
|
124
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
19/12/2022
|
EDS
|
|
125
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
19/12/2022
|
EDS
|
|
126
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
19/12/2022
|
The EDS has been attended. The KML file of comp. No. Sinhal Area 10 ha has been re uploaded.
|
|
127
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
20/12/2022
|
EDS has been attended please
|
|
128
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
21/12/2022
|
The EDS has been attended. The KML file of comp. No. Sinhal Area 10 ha has been re -uploaded.
|
|
129
|
Nodal Officer
|
REPLY
|
State secretary
|
30/12/2022
|
Revised KML file has been uploaded.
|
|
130
|
State secretary
|
REPLY
|
Head Office
|
30/12/2022
|
Revised KML file has been uploaded.
|
|
131
|
Head Office
|
EDS
|
State secretary
|
20/02/2023
|
EDS
|
|
132
|
State secretary
|
EDS
|
Nodal Officer
|
22/02/2023
|
EDS
|
|
133
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
22/02/2023
|
EDS
|
|
134
|
CF (Mandi)
|
EDS
|
DFO (Mandi)
|
22/02/2023
|
EDS
|
|
135
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
22/02/2023
|
EDS
|
|
136
|
DFO (J/Nagar)
|
EDS
|
User Agency (gmtmtpbnhppcl@gmail.com)
|
22/02/2023
|
Please attend the EDS
|
|
137
|
DFO (Mandi)
|
EDS
|
User Agency (gmtmtpbnhppcl@gmail.com)
|
03/05/2023
|
EDS
|
|
138
|
User Agency (gmtmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
21/08/2023
|
The correction have been made as per the instruction received
|
|
139
|
User Agency (gmtmtpbnhppcl@gmail.com)
|
REPLY
|
DFO (Mandi)
|
21/08/2023
|
The correction have been made as per the instruction received
|
|
140
|
DFO (Mandi)
|
REPLY
|
CF (Mandi)
|
28/08/2023
|
EDS has been attended.
|
|
141
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
30/08/2023
|
Compliance to EDS raised on dated 22/02/23 in respect of Thana Plaun HEP (191MW), HPPCL
|
|
142
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
04/09/2023
|
EDS has been attended please.
|
|
143
|
Nodal Officer
|
REPLY
|
State secretary
|
08/09/2023
|
Complete reply is submitted
|
|
144
|
State secretary
|
REPLY
|
Head Office
|
08/09/2023
|
Complete reply is submitted
|
|