Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
13/09/2019
|
eds
|
|
2
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
02/12/2019
|
The correction have been made as per the instruction received
|
|
3
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
31/01/2020
|
EDS
|
|
4
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
01/02/2020
|
Please attend to EDS
|
|
5
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
03/02/2020
|
Please attend To EDS
|
|
6
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
19/02/2020
|
The correction have been made as per the instruction received
|
|
7
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
25/02/2020
|
EDS has been attended please.
|
|
8
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
02/03/2020
|
EDS been attended to please.
|
|
9
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
11/03/2020
|
Obtain the Comments of chief wild life warden letter for which has already been written to chief wild life warden at this office.
|
|
10
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
11/03/2020
|
EDS
Obtain the Comments of chief wild life warden letter for which has already been written to chief wild life warden at this office.
|
|
11
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
11/03/2020
|
Obtain the Comments of chief wild life warden
|
|
12
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
26/08/2020
|
The correction have been made as per the instruction received
|
|
13
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
31/08/2020
|
EDS has been attended please.
|
|
14
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
05/09/2020
|
EDS has been attended to by field agencies.
|
|
15
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
21/09/2020
|
EDS
|
|
16
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
23/09/2020
|
EDS
|
|
17
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
23/09/2020
|
EDS has been attended pl
|
|
18
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
25/09/2020
|
EDS attended
|
|
19
|
Regional Office
|
EDS
|
State secretary
|
12/03/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
20
|
State secretary
|
EDS
|
Nodal Officer
|
16/03/2021
|
EDS
|
|
21
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
16/03/2021
|
EDS
|
|
22
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
18/03/2021
|
Pl attend the EDSs raised by higher ups
|
|
23
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
18/03/2021
|
Please attend the EDS
|
|
24
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
06/07/2021
|
The correction have been made as per the instruction received
|
|
25
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
07/07/2021
|
Please submit the reply in hard copy
|
|
26
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
07/07/2021
|
The correction have been made as per the instruction received
|
|
27
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
08/07/2021
|
Please submit the reply in hard copy alongwith required documents/ certificate
|
|
28
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
14/07/2021
|
The correction have been made as per the instruction received
|
|
29
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
15/07/2021
|
Please submit the reply on point No. 5 with required document
|
|
30
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
24/07/2021
|
The correction have been made as per the instruction received
|
|
31
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
03/08/2021
|
EDS has been attended please.
|
|
32
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
13/08/2021
|
EDS has been attended please.
|
|
33
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
31/08/2021
|
Kindly attend the observation as per attachment
|
|
34
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
03/09/2021
|
EDS
|
|
35
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
03/09/2021
|
Please attend EDS
|
|
36
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
17/09/2021
|
The correction have been made as per the instruction received
|
|
37
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
17/09/2021
|
Please submit the reply in hard copy alongwith required documents/ certificate
|
|
38
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
22/10/2021
|
The correction have been made as per the instruction received
|
|
39
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
23/10/2021
|
EDS has been attended please.
|
|
40
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
27/10/2021
|
EDS has been attended please.
|
|
41
|
Nodal Officer
|
REPLY
|
State secretary
|
17/11/2021
|
Complete reply is submitted
|
|
42
|
State secretary
|
REPLY
|
Regional Office
|
17/11/2021
|
Complete reply is submitted please.
|
|
43
|
Regional Office
|
EDS
|
State secretary
|
06/12/2021
|
The State Govt. may attend the shortcomings attached herewith
|
|
44
|
State secretary
|
EDS
|
Nodal Officer
|
06/12/2021
|
EDS
|
|
45
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
06/12/2021
|
EDS
|
|
46
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
13/12/2021
|
EDS
|
|
47
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
13/12/2021
|
Please attend the EDS
|
|
48
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
05/03/2022
|
The correction have been made as per the instruction received
|
|
49
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
05/03/2022
|
Please submit the reply in hard copy
|
|
50
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
10/03/2022
|
The correction have been made as per the instruction received
|
|
51
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
11/03/2022
|
EDS has been attended please.
|
|
52
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
13/04/2022
|
EDS
|
|
53
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
16/04/2022
|
EDS has been attended please.
|
|
54
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
30/05/2022
|
EDS has been attended please.
|
|
55
|
Nodal Officer
|
REPLY
|
State secretary
|
15/06/2022
|
Complete reply is submitted
|
|
56
|
State secretary
|
REPLY
|
Regional Office
|
15/06/2022
|
Complete reply is submitted
|
|
57
|
Regional Office
|
EDS
|
State secretary
|
12/07/2022
|
The State Govt. may attend the shortcomings attached herewith
|
|
58
|
State secretary
|
EDS
|
Nodal Officer
|
13/07/2022
|
EDS
|
|
59
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
13/07/2022
|
EDS
|
|
60
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
18/07/2022
|
EDS
|
|
61
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
22/07/2022
|
Please attend the EDS
|
|
62
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
10/10/2022
|
The correction have been made as per the instruction received
|
|
63
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
01/11/2022
|
Please submit the reply in hard copy alongwith required documents/ certificate
|
|
64
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
16/11/2022
|
The correction have been made as per the instruction received
|
|
65
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
18/11/2022
|
EDS has been attended please.
|
|
66
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
07/12/2022
|
EDS has been attended please.
|
|
67
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
22/12/2022
|
Annexurres A-I to A-X has not been uploaded with the reply dated 06.12.2022. Same be uploaded with the reply. If the same is uploaded on the other placed, the reference be given accordingly on the reply letter.
|
|
68
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
22/12/2022
|
Annexurres A-I to A-X has not been uploaded with the reply dated 06.12.2022. Same be uploaded with the reply. If the same is uploaded on the other placed, the reference be given accordingly on the reply letter.
|
|
69
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
29/12/2022
|
EDS has been attended please.
|
|
70
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
02/01/2023
|
The complete reply of the eds has been uploaded in the shape of pdf in additional information by DFO J/Nagar
|
|
71
|
Nodal Officer
|
REPLY
|
State secretary
|
06/03/2023
|
Complete reply is submitted
|
|
72
|
State secretary
|
REPLY
|
Regional Office
|
07/03/2023
|
Complete reply is submitted
|
|
73
|
Regional Office
|
EDS
|
State secretary
|
10/03/2023
|
State Government may attend the shortcomings attached herewith.
|
|
74
|
State secretary
|
EDS
|
Nodal Officer
|
13/03/2023
|
EDS
|
|
75
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
13/03/2023
|
EDS
|
|
76
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
14/03/2023
|
EDS
|
|
77
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
16/03/2023
|
Please attend the EDS
|
|
78
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
21/03/2023
|
The correction have been made as per the instruction received
|
|
79
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
21/03/2023
|
Please submit the reply in hard copy
|
|
80
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
22/03/2023
|
The correction have been made as per the instruction received
|
|
81
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
22/03/2023
|
EDS has been attended please.
|
|
82
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
25/03/2023
|
Submitted for further n/action please.
|
|
83
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
27/03/2023
|
EDS
|
|
84
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
28/03/2023
|
EDS
|
|
85
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
01/04/2023
|
Please attend the EDS
|
|
86
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
07/04/2023
|
The correction have been made as per the instruction received
|
|
87
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
11/04/2023
|
EDS has been attended please.
|
|
88
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
27/05/2023
|
As per request of User agency, case has refer back
|
|
89
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
31/05/2023
|
As per request of User agency, case has refer back
|
|
90
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
02/06/2023
|
The correction have been made as per the instruction received
|
|
91
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
02/06/2023
|
Correction has been made by U/A.
|
|
92
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
03/06/2023
|
EDS has been attended please.
|
|
93
|
Nodal Officer
|
REPLY
|
State secretary
|
08/06/2023
|
Complete reply is submitted
|
|
94
|
State secretary
|
REPLY
|
Regional Office
|
08/06/2023
|
Complete reply is submitted
|
|
95
|
Regional Office
|
EDS
|
State secretary
|
28/12/2023
|
State Govt. may attend the shortcoming attached herewith.
|
|
96
|
State secretary
|
EDS
|
Nodal Officer
|
08/01/2024
|
EDS
|
|
97
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
08/01/2024
|
EDS
|
|
98
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
10/01/2024
|
EDS
|
|
99
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
24/01/2024
|
Please attend the EDS and submit compliance
|
|
100
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
18/03/2024
|
The correction have been made as per the instruction received
|
|
101
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
16/04/2024
|
The reply to EDS is not in order. Please go through point wise EDS and supply reply accordingly from your level.
|
|
102
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
10/07/2024
|
The correction have been made as per the instruction received
|
|
103
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
20/07/2024
|
Please submit point wise reply to the EDS dated 28.12.2023 complete in all respects
|
|
104
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
23/07/2024
|
The correction have been made as per the instruction received
|
|
105
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
31/07/2024
|
Point wise reply to EDS have been given from the level of User Agency and DFO copy thereof uploaded in additional information. Other requisite documents have been uploaded in relevant field/column in portal.
|
|
106
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
05/08/2024
|
EDS has been attended please.
|
|
107
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
13/08/2024
|
The reply of observation No.4 is still not correct, the proposed diversion area DA is still 5.4326 ha, further, the Tunnel and adit tunnel is marked over the house which need rectification / correction. 2. As per DSS analysis, out of the 10 ha. proposed CA area, 1.54 falls in Very Dense forest and 4.1 ha. falls under MDF, same may be reviewed and rectified/replaced with the other CA area with density less than 0.4.
|
|
108
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
13/08/2024
|
The reply of observation No.4 is still not correct, the proposed diversion area DA is still 5.4326 ha, further, the Tunnel and adit tunnel is marked over the house which need rectification / correction. 2. As per DSS analysis, out of the 10 ha. proposed CA area, 1.54 falls in Very Dense forest and 4.1 ha. falls under MDF, same may be reviewed and rectified/replaced with the other CA area with density less than 0.4.
|
|
109
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
17/08/2024
|
As per CF Mandi EDS The reply of observation No.4 is still not correct, the proposed diversion area DA is still 5.4326 ha, further, the Tunnel and adit tunnel is marked over the house which need rectification / correction. 2. As per DSS analysis, out of the 10 ha. proposed CA area, 1.54 falls in Very Dense forest and 4.1 ha. falls under MDF, same may be reviewed and rectified/replaced with the other CA area with density less than 0.4. Therefore please do the needful pertain to you i.e. User Agency
|
|
110
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
21/09/2024
|
The correction have been made as per the instruction received
|
|
111
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
19/10/2024
|
Reply to EDS :
Point No. 1 : User agency has made correction/rectification in respect of the observations regarding DA area beside Tunnel and adit tunnel.
Point No. 2 : The CA site re-inspected through RFO and User Agecy and found that there exists Barberries shrubs and bushes abundantly in the selected CA site due to which in DSS analysis it appears very dense & MDF in some parts. However, the selected CA land in DPF Bharahtu have scattered trees and degraded forest land, which is suitable and fit for plantation necessary certificate in this regard uploaded in additional information also.
|
|
112
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
21/10/2024
|
Reply to EDS : Point No. 1 : User agency has made correction/rectification in respect of the observations regarding DA area beside Tunnel and adit tunnel. Point No. 2 : The CA site re-inspected through RFO and User Agecy and found that there exists Barberries shrubs and bushes abundantly in the selected CA site due to which in DSS analysis it appears very dense & MDF in some parts. However, the selected CA land in DPF Bharahtu have scattered trees and degraded forest land, which is suitable and fit for plantation necessary certificate in this regard uploaded in additional information also.
|
|
113
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
20/11/2024
|
EDS
|
|
114
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
23/11/2024
|
eds
|
|
115
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
25/11/2024
|
EDS
|
|
116
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
13/12/2024
|
The correction have been made as per the instruction received
|
|
117
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
21/01/2025
|
Reply to EDS raised by Nodal officer on dated 19.11.2024 submitted by User Agency and from the level of DFO. The copy of reply uploaded at Sr. No. 13
|
|
118
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
28/01/2025
|
eds has been attended. Submitted please.
|
|
119
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
22/02/2025
|
1. Percentage of Muck comes out to 55 percentage . Where will the rest of muck go.
2. Has the revised diverted area checked through DSS analysis.
3. Revised CA area is on steep slope. pl. check the slope.
|
|
120
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
22/02/2025
|
. Percentage of Muck comes out to 55 percentage . Where will the rest of muck go. 2. Has the revised diverted area checked through DSS analysis. 3. Revised CA area is on steep slope. pl. check the slope.
|
|
121
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
22/02/2025
|
1. Percentage of Muck comes out to 55 percentage . Where will the rest of muck go.
2. Has the revised diverted area checked through DSS analysis.
3. Revised CA area is on steep slope. pl. check the slope.
|
|
122
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
01/03/2025
|
The correction have been made as per the instruction received
|
|
123
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
02/05/2025
|
Reply of EDS dated 22.02.2025 raised by Nodal Officer uploaded at Serial No. 15 in Additional Information.
|
|
124
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
03/05/2025
|
Reply of EDS dated 22.02.2025 raised by Nodal Officer uploaded at Serial No. 15 in Additional Information by DFO J/Nagar.
|
|
125
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
26/05/2025
|
The main issue pertains to DSS analysis. Please confirm if it is correct as per the case uploaded. It has merely been mentioned that the DSS has been forwarded. please confirm the same.
|
|
126
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
27/05/2025
|
The main issue pertains to DSS analysis. Please confirm if it is correct as per the case uploaded. It has merely been mentioned that the DSS has been forwarded. please confirm the same.
|
|
127
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
31/05/2025
|
The main issue pertains to DSS analysis. Please confirm if it is correct as per the case uploaded. It has merely been mentioned that the DSS has been forwarded. please confirm the same.
|
|
128
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
01/07/2025
|
The correction have been made as per the instruction received
|
|
129
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
18/07/2025
|
NOC from both selling and buying parties is to be uploaded with the reply.
|
|
130
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
02/08/2025
|
The correction have been made as per the instruction received
|
|
131
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
08/08/2025
|
Needful done and Reply to EDS dated 27.05.2025 attached at serial No. 15 of additional information.
|
|
132
|
CF (Mandi)
|
REPLY
|
Nodal Officer
|
19/08/2025
|
DFO J/Nagar has intimated that, user agency has submits the KML file for the Thaltukhod Stage-I (5.00MW) HEP, proposed area of 4.9069 ha has been corrected and successfully uploaded on the MoEF web portal in compliance with the observation received.
|
|
133
|
Nodal Officer
|
EDS
|
CF (Mandi)
|
02/09/2025
|
Why is the area diverted for transmission line is so high.
|
|
134
|
CF (Mandi)
|
EDS
|
DFO (J/Nagar)
|
03/09/2025
|
eds
|
|
135
|
DFO (J/Nagar)
|
EDS
|
User Agency (cliffhydro107@gmail.com)
|
04/09/2025
|
Considering Thaltu I, II, III there seems to be a clear intention of obviating the provisions of CAT plan. If all four projects are in the same catchment, why should there not be a CAT plan.
|
|
136
|
User Agency (cliffhydro107@gmail.com)
|
REPLY
|
DFO (J/Nagar)
|
24/09/2025
|
The correction have been made as per the instruction received
|
|
137
|
DFO (J/Nagar)
|
REPLY
|
CF (Mandi)
|
08/10/2025
|
Reply of EDS dated 03.09.2025
|
|