PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : WB-02/2019
1. Location of the project/Scheme : West Bengal
 (i) State / Union Territory : West Bengal  (ii) District : Jalpaiguri  (iii) Forest Division : Jalpaiguri  (iv) Area of forest land proposed for diversion (in ha.) : 0.9  (v)

Category of the Proposal: Village Electricity
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Jalpaiguri0.9Reserved Forest
Total 0.9
Division 1. : Jalpaiguri
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Jalpaiguri0.9
Total0.9
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.90.6Eco 1
Total. 0.9


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : Sal working circle
6. Brief note on vulnerability of the forest area to erosion : Nil
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, Deer, Gaur, Avifauna, reptiles.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The height of over head line must be more then 6.00 metre from the ground and the line must be insulated to ensure the safety of wild animals
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1096758.82
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.8North Diana BlockDianaNA    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Jalpaiguri3044006439318.06230027/05/20191.800
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
JalpaiguriNorthernDFOYesOne20/05/2019
 NorthernCFYesOne08/06/2019
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
JalpaiguriNorthernDFO RecommendedThe diversion of land proposed is for drawal of 11 KV feeder from 33/11 KV Gayerkata Sub station to Khuttimari Forest Rest House, under Moraghat Range for village electricity under Deen Dayal Upadhyaya Gram Jyoti Yojana under Proposal number FP/WB/VELEC/34640/2018 is unavoidable and barest minimum requirement for the project. The proposed diversion will not hamper any soil conservation & movement of wildlife if the wire is insulated & drawn above 6.00 miter from the ground level. The case is hereby recommended.
NorthernCF RecommendedThe diversion of land proposed for drawal of 11 KV feeder electric line from Gayerkata sub station to Khutimari Forest Rest house under Moraghat Range of Jalpaiguri Division for village electricity under Din Dayal Upadhaya Gram Jyoti Yojana under proposal FP/WB/VELEC/34640/2018 is barest minimum and is unavoidable.The proposed diversion will not hamper forest soil and movement of wildlife if the wire used is insulated and drawn above 6.0m height from ground level.Yes
Nodal Officer RecommendedThe project facilitate power supply to local people and the barest minimum forest land is diverted for this project.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
West BengalState SecretaryRecommended26/03/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataState GovernmentFR//O/L/10T-06/201919/03/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/WB/VELEC/34640/2018VELEC3464020184202,073,742.502,073,742.502021-08-16PUNBH21228946540Union Bank Of IndiaNEFT/RTGS (Challan)2021-06-102021-06-30
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1.8   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1.8
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/WB/VELEC/34640/201803 Sep 2021No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/WB/VELEC/34640/201803 Sep 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/WB/VELEC/34640/2018for issuing & uploading stage II approval please21 Sep 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/WB/VELEC/34640/201802 Sep 2021APPROVED