PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TN-025/2017
1. Location of the project/Scheme : Tamil Nadu
 (i) State / Union Territory : Tamil Nadu  (ii) District : Coimbatore  (iii) Forest Division : Coimbatore  (iv) Area of forest land proposed for diversion (in ha.) : 0.0458  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Coimbatore0.0458Reserved Forest
Total 0.0458
Division 1. : Coimbatore
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Coimbatore0.0458
Total0.0458
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.04580.4Eco 3
Total. 0.0458


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : Nil
6. Brief note on vulnerability of the forest area to erosion : There is no possiblity of land slide occur
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, Wild Boar, spotted deer.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1 I recommend for the laying of pipeline for combined water supply scheme to Thondamuthur union in the Forest land as the area required by the user agency is minimum. Since the user agency is laying the pipeline at a depth of 1.20 meter below the ground level it will not hinder the movement of wild animals and there is no possibility of alternative alignment. Therefore I request that this proposal may kindly be considered in the interest of public to provide water supply.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Coimbatore472044.20109073.04100.95891995.1021/04/201768.7526.36
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
CoimbatoreCoimbatoreDFOYesOne21/04/2017
 CoimbatoreCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
CoimbatoreCoimbatoreDFO Recommendedlaying of pipeline for combined water supply scheme to Thondamuthur union in the Forest land as the area required by the user agency is minimum. Since the user agency is laying the pipeline at a depth of 1.20 meter below the ground level it will not hinder the movement of wild animals and there is no possibility of alternative alignment. Therefore I request that this proposal may kindly be considered in the interest of public to provide water supply.
CoimbatoreCF RecommendedThere is no alternative non forest land is available for laying the proposed water supply line. The project for water supply will benefit the people living in Thondamuthur union which covers 7 town panchayats and 134 Rural habitations.
quetiapin ritalin quetiapin mod angst quetiapin wirkstoff
Yes
Nodal Officer RecommendedI agree with the proposal as the proposed diversion is for providing water supply to Rural Habitations. Hence recommended.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Tamil NaduState SecretaryRecommended30/06/2017Approved for twenty years State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ChennaiState GovernmentTN 025 201722/06/2017
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TN/WATER/21009/2016IN-PRINCIPLENo Data