Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received at RO/HO(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
1
|
Andhra Pradesh
|
FP/AP/QRY/149784/2021
|
4-APB216/2023-VIJ
|
The Proposal is for grant of Quarrying lease for extraction Quartz and Feldspar Minerals over an extent of 4.41 Ha in Sy.No-553/P of Chaganam Village in Chaganam RFof Venkatagiri Range, Nellore Division applied by M/s Chettinad Morimura Semiconductor Material Pvt.,Ltd.
|
Quarrying
|
CHETTINAD MORIMURA SEMICONDUCTOR MATERIAL PVT LTD
|
4.41
|
Pending at RO
|
15-Jun-2023
|
28-Oct-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
2
|
Andhra Pradesh
|
FP/AP/QRY/121190/2021
|
4-APB168/2022-VIJ
|
Grant of Quarry lease for Black Granite in favour of M/s. Sri Vaishnavi Granites, A.P
|
Quarrying
|
M/S. SRI VAISHNAVI GRANITES
|
4.82
|
Pending at RO
|
04-May-2022
|
22-Aug-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
3
|
Assam
|
FP/AS/QRY/154203/2022
|
|
Dholpani RF Mahal
|
Quarrying
|
SWGWMSAR MACHAHARY
|
6.9
|
Pending at RO
|
19-Jul-2023
|
10-Apr-2024
|
|
|
|
|
EC File NA
|
4
|
Assam
|
FP/AS/QRY/153044/2022
|
|
BELDENGA STONE MAHAL
|
Quarrying
|
BISHNU BORDOLOI
|
5.12
|
Pending at RO
|
19-Dec-2022
|
22-Dec-2023
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
5
|
Assam
|
FP/AS/QRY/155191/2022
|
|
LANGKAIJURI STONE MAHAL
|
Quarrying
|
IMDAD ALI
|
5.42
|
Pending at RO
|
10-Nov-2022
|
20-Dec-2023
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
6
|
Bihar
|
FP/BR/Approach/152066/2022
|
|
The proposal for establishment of retail out-let dealership of M/s NX100 PACIFIC BIOFUEL PVT Ltd.
|
Approach Access
|
AJIT KUMAR
|
0.015
|
Pending at RO
|
13-Feb-2024
|
01-Nov-2024
|
|
|
|
|
No
|
7
|
Gujarat
|
FP/GJ/SubStation/150363/2021
|
|
Diversion of 2.6 Ha forest land of Village:Bhirandiyara, Ta:Bhuj, Dist: Kachtchh for Construction of 66 KV substation, approach road and 66 KV Overhead Transmission Line
|
Sub Station
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
2.6
|
Pending at RO
|
23-Oct-2023
|
24-Jan-2025
|
|
|
|
|
No
|
8
|
Gujarat
|
FP/GJ/Others/20758/2016
|
|
Maruti Suzuki India Project At Hansalpur
|
Others
|
MARUTI SUZUKI INDIA LIMITED
|
0.0388
|
Pending at RO
|
22-Jun-2022
|
21-Sep-2024
|
|
|
|
|
No
|
9
|
Gujarat
|
FP/GJ/ROAD/152124/2022
|
|
Widening and strengthening of Valsad-Gundlav-Khergam road km 2/0 to 16/0 Ta. Valsad Di. Valsad
|
Road
|
ROAD AND BUILDING SUB DIVISION, VALSAD
|
9.85
|
Pending at RO
|
20-Jun-2023
|
21-Nov-2023
|
|
|
|
|
No
|
10
|
Haryana
|
FP/HR/OFC/154998/2022
|
|
LAYING OF UNDERGOUND OFC BY JIO DIGITAL FIBRE PRIVATE LIMITED IN HISSAR DIVISION
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PVT LTD
|
0.0661
|
Pending at RO
|
27-Jan-2025
|
27-Jan-2025
|
|
|
|
|
No
|
11
|
Haryana
|
FP/HR/Approach/146575/2021
|
9-HRB129-2022-CHA
|
Access permission for transportation of Mining area at vill khanak
|
Approach Access
|
HSIIDC STONE MINES KHANAK
|
0.1785
|
Pending at RO
|
21-Jun-2022
|
16-Oct-2024
|
|
|
|
|
No
|
12
|
Haryana
|
FP/HR/TRANS/155043/2022
|
|
Const. of 132 KV Transmission line from Dhanonda to Kanina distt Mahendergarh
|
Transmission Line
|
HVPNL REWARI
|
0.3041
|
Pending at RO
|
01-Jul-2024
|
01-Jul-2024
|
|
|
|
|
No
|
13
|
Haryana
|
FP/HR/ROAD/28580/2017
|
9-HRB018-2018-CHA
|
HM FOODS
|
Road
|
HM FOODS
|
0.012
|
Pending at RO
|
23-Jan-2018
|
01-May-2024
|
|
|
|
|
No
|
14
|
Haryana
|
FP/HR/TRANS/50181/2020
|
9-HRB065-2022-CHA
|
CREATION OF 132 KV S/C LINE WITH 0.4 SQ." ACSR ZEBRA CONDUCTOR FROM 132 KV S/STN. BHOJRAJ TO 132 KV S/S ARYA NAGAR & LILO OF ONE CIRCUIT OF 132 KV D/C SANGWAN TO KHANAK LINE AT 132 KV S/STN. BHOJRAJ L
|
Transmission Line
|
HARYANA VIDYUT PRASARAN NIGAM LTD
|
0.5457618
|
Pending at RO
|
13-May-2022
|
26-Apr-2024
|
|
|
|
|
No
|
15
|
Himachal Pradesh
|
FP/HP/Others/140938/2021
|
|
C/o the Sub Divisional Soil Conservation Officer office building at Bagsiad, Distt. Mandi (H.P).
|
Others
|
AGRICULTURE DEPARTMENT H.P.
|
0.0869
|
Pending at RO
|
04-Dec-2021
|
01-Feb-2025
|
|
|
|
|
No
|
16
|
Himachal Pradesh
|
FP/HP/HYD/38741/2019
|
|
Bloot Fozal
|
Hydel
|
BLOOT FOZAL HYDRO PRIVATE LIMITED
|
4.864
|
Pending at RO
|
31-Jan-2025
|
31-Jan-2025
|
|
|
|
|
No
|
17
|
Himachal Pradesh
|
FP/HP/ROAD/41345/2019
|
|
CONSTRUCTION OF GANI TO BHORANI NALA ROAD KM.0/00 TO 7/200.
|
Road
|
PUBLIC WORK DEPARTMENT
|
4.6147
|
Pending at RO
|
18-Jul-2020
|
30-Jan-2025
|
|
|
|
|
No
|
18
|
Himachal Pradesh
|
FP/HP/ROAD/74345/2020
|
|
C/O Ambulance road from Fire Brigade road for the building in Daizy Bank Estate Lower Jakhu Shimla Ward No-16 KM 0/0 To 0/45.
|
Road
|
Commissioner MCS
|
0.0112
|
Pending at RO
|
21-Sep-2022
|
15-Jan-2025
|
|
|
|
|
No
|
19
|
Himachal Pradesh
|
FP/HP/ROAD/153148/2022
|
|
Construction of Gadasu Lauhti Punan road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.9683
|
Pending at RO
|
30-Jan-2023
|
14-Jan-2025
|
|
|
|
|
No
|
20
|
Himachal Pradesh
|
FP/HP/TRANS/151522/2022
|
|
Construction of 66kV S/C transmission line from Proposed 220/66kV S/Stn. Nadukhar to Shakrori, Shimla (H.P
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
1.6681
|
Pending at RO
|
04-Aug-2023
|
07-Jan-2025
|
|
|
|
|
No
|
21
|
Himachal Pradesh
|
FP/HP/ROAD/49449/2020
|
|
CONSTRUCTION OF DHARLI TO BALAG ROAD KM. 0/00 TO 18/900.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
10.6019
|
Pending at RO
|
06-Jan-2025
|
06-Jan-2025
|
|
|
|
|
No
|
22
|
Himachal Pradesh
|
FP/HP/Others/37369/2018
|
|
Construction of Police Post Dhami at Ghandal District Shimla (Himachal Pradesh)
|
Others
|
POLICE
|
0.453
|
Pending at RO
|
18-Oct-2022
|
01-Jan-2025
|
|
|
|
|
No
|
23
|
Himachal Pradesh
|
FP/HP/Others/147489/2021
|
FC/HPB/09/174/2022
|
Govt. Polytechnic at Dalash
|
Others
|
DIRECTOR OF TECHNICAL EDUCATION, VOCATIONAL & INDUSTRIAL TRAINING HP
|
1.8686
|
Pending at RO
|
29-Oct-2022
|
01-Jan-2025
|
|
|
|
|
No
|
24
|
Himachal Pradesh
|
FP/HP/HYD/49283/2020
|
|
TUNDAH-II HYDROELECTRIC PROJECT (24.00MW)
|
Hydel
|
M/s. Sai Eternal Foundation
|
13.3082
|
Pending at RO
|
23-Aug-2021
|
19-Dec-2024
|
|
|
|
|
No
|
25
|
Himachal Pradesh
|
FP/HP/ROAD/139911/2021
|
|
Bhaba Mud Sagnam Attargoo Road Kms 0/0 to 44/400
|
Road
|
HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT
|
25.6
|
Pending at RO
|
29-Oct-2022
|
06-Dec-2024
|
|
|
|
|
No
|
26
|
Himachal Pradesh
|
FP/HP/MIN/34194/2018
|
|
Diversion of 2.1532 Ha. of forest land (1.4612 Ha. for mining lease and safety zone, 0.3400 Ha. for approach road and 0.3520 Ha. for stacking of raw material) for already established stone crusher at Pashada, P.O. Khaneri, Tehsil rampur Distt. Shimla H.P. in favour of M/s Bushahr Laghu Udyog VPO Jhakari, tehsil Rampur Bushahr.
|
Mining
|
M/S BUSHAHR LAGHU UDYOG
|
2.1532
|
Pending at RO
|
22-Mar-2019
|
05-Dec-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
27
|
Himachal Pradesh
|
FP/HP/ROAD/140946/2021
|
FC/HPC/06/172/2022
|
CONSTRUCTION OF LINK ROAD FROM JABBAL KA KAINDIAWALA KHARKON ROAD KM. 0/0 TO 12/255
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.828
|
Pending at RO
|
29-Oct-2022
|
04-Dec-2024
|
|
|
|
|
No
|
28
|
Himachal Pradesh
|
FP/HP/HYD/43637/2019
|
8B/HP/01/18/2021/FC
|
Thaltu khorh-II HEP (5 MW)
|
Hydel
|
CLIFF FINVEST PVT. LTD.
|
3.6693
|
Pending at RO
|
20-Feb-2021
|
20-Nov-2024
|
|
|
|
|
No
|
29
|
Himachal Pradesh
|
FP/HP/HYD/40895/2019
|
FC/HPB/01/47/2021
|
Suket Small Hydro Project on Suket Khad
|
Hydel
|
SUKET HYDRO
|
0.8738
|
Pending at RO
|
20-Nov-2021
|
20-Nov-2024
|
|
|
|
|
No
|
30
|
Himachal Pradesh
|
FP/HP/HYD/49599/2020
|
8B/HP/01/89/2021/FC
|
Construction of Gaj Gehra Small Hydro Project in District Kangra
|
Hydel
|
GAJ HYDRO POWER PRIVATE LIMITED
|
1.7029
|
Pending at RO
|
15-Jul-2021
|
29-Oct-2024
|
|
|
|
|
No
|
31
|
Himachal Pradesh
|
FP/HP/WATER/118984/2021
|
|
Source level Augmentation of WSS/LWSS from Govind Sagar Lake at Kut Bounger under Jal Shakti Vibhag Sub-Division Kalol in Tehsil Jhandutta Distt. Bilaspur (H.P) (1.3463 Hectare).
|
Drinking Water
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
1.3463
|
Pending at RO
|
17-Nov-2021
|
29-Oct-2024
|
|
|
|
|
No
|
32
|
Himachal Pradesh
|
FP/HP/HYD/148103/2021
|
FC/HPB/01/161/2022
|
Banuala Baroond-I
|
Hydel
|
GYATRI HYDEL PROJECT PVT. LTD.
|
1.0188
|
Pending at RO
|
06-Oct-2022
|
07-Oct-2024
|
|
|
|
|
No
|
33
|
Himachal Pradesh
|
FP/HP/HYD/146882/2021
|
|
Banuala Baroond-II
|
Hydel
|
NEW HYDEL POWER
|
0.603
|
Pending at RO
|
07-Oct-2022
|
07-Oct-2024
|
|
|
|
|
No
|
34
|
Himachal Pradesh
|
FP/HP/HYD/148892/2021
|
FC/HPB/11/2023
|
Small Hydel Project kandha (0.40MW)
|
Hydel
|
BHAGWATI HYDRO POWER PROJECT (OPC) PRIVATE LIMITED
|
0.74
|
Pending at RO
|
30-Jan-2023
|
24-Jul-2024
|
|
|
|
|
No
|
35
|
Himachal Pradesh
|
FP/HP/HYD/41533/2019
|
|
Construction of Lower Iku I Small Hydro Project
|
Hydel
|
MONGRA HYDRO CONSTRUCTION PRIVATE LIMITED
|
0.5151
|
Pending at RO
|
02-Sep-2021
|
29-May-2024
|
|
|
|
|
No
|
36
|
Himachal Pradesh
|
FP/HP/ROAD/14826/2015
|
|
Construction of link road to Badhera, Km. 0/0 to 2/795
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.2814
|
Pending at RO
|
25-Jul-2020
|
02-May-2024
|
|
|
|
|
No
|
37
|
Himachal Pradesh
|
FP/HP/ROAD/41188/2019
|
|
C/o Proposed Road for M/S Ojas Gram Tourism site at Koti Shergata.
|
Road
|
OJAS GRAM
|
0.2569
|
Pending at RO
|
19-Apr-2023
|
06-Apr-2024
|
|
|
|
|
No
|
38
|
Himachal Pradesh
|
FP/HP/ROAD/21589/2016
|
|
C/O Padech to Deefaug Batiyad Kadech road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.2973
|
Pending at RO
|
30-Jan-2023
|
18-Mar-2024
|
|
|
|
|
No
|
39
|
Himachal Pradesh
|
FP/HP/ROAD/153496/2022
|
|
Munder Kungal Makrog Khori Gadasu road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.2193
|
Pending at RO
|
01-Sep-2023
|
01-Sep-2023
|
|
|
|
|
No
|
40
|
Jharkhand
|
FP/JH/IND/142974/2021
|
|
West Bokaro Expansion Project
|
Industry
|
Tata Steel West Bokaro Division
|
36.94
|
Pending at RO
|
10-Nov-2023
|
04-Feb-2025
|
|
|
|
|
Yes
Proposal No.: IA/JH/CMIN/255746/2022
EC File No.: IA-J-11015/10/2022-IA-II(M)
Proposal Status: TOR GRANTED
|
41
|
Karnataka
|
FP/KA/MIN/51389/2020
|
|
Conveyor Project of Vedanta Ltd ML No. 2677 in Village Megalahalli, Hollkere & Chitradurga Taluk, District Chitradurga.
|
Mining
|
VEDANTA LIMITED
|
9.5474
|
Pending at RO
|
03-Feb-2025
|
03-Feb-2025
|
|
|
|
|
No
|
42
|
Karnataka
|
FP/KA/IND/26447/2017
|
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
Pending at RO
|
02-Mar-2022
|
28-Jan-2025
|
|
|
|
|
No
|
43
|
Karnataka
|
FP/KA/ROAD/29278/2017
|
|
For formation of approach road connecting existing road to our crusher in Chitradurga District in favour of Veeresh, Partner, M/s SHIVAPARAM CONSTRUCTIONS STONE CRUSHER, T. Yammiganuru Grama, Holalkere Taluk, Chitradurga District.
|
Road
|
SHIVAPARAM CONSTRACTION
|
0.692
|
Pending at RO
|
07-Aug-2018
|
18-Jan-2025
|
|
|
|
|
No
|
44
|
Karnataka
|
FP/KA/ROAD/49295/2020
|
|
Development of Bangalore Ring Road ((STRR) Phase-II NH-948A) from Ramanagara to Peddamadhagondapalli (Km 82.200 to 140.000) - 57.800 km in District Ramanagara and Bangalore Urban of Karnataka State and District Krishnagiri of Tamil Nadu State.
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
|
11
|
Pending at RO
|
24-Feb-2022
|
10-Jan-2025
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
45
|
Ladakh
|
FP/LA/TRANS/151761/2022
|
|
220 kV Drass-Padum S/C Transmission Line under plan PMDP 2015
|
Transmission Line
|
CHIEF ENGINEER, LADAKH POWER DEVELOPMENT DEPARTMENT
|
5.14
|
Pending at RO
|
04-Oct-2024
|
05-Feb-2025
|
|
|
|
|
No
|
46
|
Madhya Pradesh
|
FP/MP/MIN/152432/2022
|
|
Diversion of 4.59 hectare of forest land for Harrai Gujran Stone Quarry lease
|
Mining
|
LALIT PANGHAL
|
4.59
|
Pending at RO
|
21-Feb-2023
|
23-Jan-2025
|
|
|
|
|
No
|
47
|
Madhya Pradesh
|
FP/MP/MIN/152431/2022
|
|
Diversion of 4.46 hectare of forest land for Harrai Gujran Stone Quarry lease
|
Mining
|
LALIT PANGHAL
|
4.46
|
Pending at RO
|
21-Feb-2023
|
23-Jan-2025
|
|
|
|
|
No
|
48
|
Madhya Pradesh
|
FP/MP/MIN/152429/2022
|
|
Diversion of 2.80 hectare of forest land for Sardaman Stone Quarry lease
|
Mining
|
LALIT PANGHAL
|
2.8
|
Pending at RO
|
21-Feb-2023
|
23-Jan-2025
|
|
|
|
|
No
|
49
|
Madhya Pradesh
|
FP/MP/RAIL/42206/2019
|
|
BUDNI - INDORE NEW B.G. RAIL LINE PROJECT
|
Railway
|
RAIL VIKAS NIGAM LTD
|
70.775
|
Pending at RO
|
15-Oct-2023
|
21-Jan-2025
|
|
|
|
|
No
|
50
|
Madhya Pradesh
|
FP/MP/RAIL/150074/2021
|
|
Proposal for diversion of 8.0357 Ha Forest area for proposed 3rd railway line between Jujharpur (Km.750+000) and Dodharamohor (Km.792+650) section.
|
Railway
|
CENTRAL RAILWAY CST MUMBAI
|
8.0357
|
Pending at RO
|
08-Jun-2023
|
21-Jan-2025
|
|
|
|
|
No
|
|