Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Jharkhand
|
FP/JH/RAIL/36382/2018
|
FP/JH/Rail/36382/2018
|
Conducting Final Location Survey,Geotechnical Investigation,Design/Drawing Of Structure Between Biratoli & Tori For Rail Flyover At Tori And Biratoli To Mahuamilan
|
Railway
|
EAST CENTRAL RAILWAY
|
2.537
|
IN-PRINCIPLE
|
14-Aug-2019
|
|
|
|
|
|
No
|
2
|
Jharkhand
|
FP/JH/VELEC/40349/2019
|
FP/JH/VELEC/40349/2019
|
33 KV VILL-PADMA TO VILL-NACHANVE, DDUGJY, HAZARIBAG
|
Village Electricity
|
JHARKHAND BIJLI VITRAN NIGAM LIMITED
|
7.608
|
IN-PRINCIPLE
|
17-Jan-2022
|
|
|
|
|
|
No
|
3
|
Jharkhand
|
FP/JH/MIN/59823/2020
|
8-37/2022-FC
|
Pachwara South Coal Mine Project.
|
Mining
|
NEYVELI UTTAR PRADESH POWER LIMITED
|
455.1108
|
IN-PRINCIPLE
|
18-Sep-2024
|
|
|
|
|
|
Yes
Proposal No.: IA/JH/CMIN/168045/2020
EC File No.: IA-J-11015/18/2020-IA-II(M)
Proposal Status: EC Granted
|
4
|
Jharkhand
|
FP/JH/MIN/25171/2017
|
FP/JH/MIN/25171/2017
|
BARAIBURU TATIBA IRON & MANGANESE MINES
|
Mining
|
THE RAMESHWARA JUTE MILLS LIMITED
|
14.5
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
EC File NA
|
5
|
Jharkhand
|
FP/JH/SubStation/39837/2019
|
FP/JH/SubStation/39837/2019
|
Forest proposal for the land provided by state government for construction of 132/33 KV G/S/S at Hunterganj, Village- Bonra, under transmission circle, Hazaribag
|
Sub Station
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
4.04
|
IN-PRINCIPLE
|
27-Jul-2023
|
|
|
|
|
|
No
|
6
|
Jharkhand
|
FP/JH/Others/30674/2017
|
FP/JH/Others/30674/2017
|
Police Line Ramgarh
|
Others
|
JHPOLICE DEPARTMENT
|
13.047
|
IN-PRINCIPLE
|
08-Nov-2023
|
|
|
|
|
|
No
|
7
|
Jharkhand
|
FP/JH/MIN/20419/2016
|
FP/JH/MIN/20419/2016
|
Karma Stone Mine
|
Mining
|
RAMCHANDERMEHTA CAPTAIN ANAND APARNADEVI
|
14.17
|
IN-PRINCIPLE
|
08-Dec-2021
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
8
|
Jharkhand
|
FP/JH/RAIL/16617/2015
|
FP/JH/RAIL/16617/2015
|
Tori Shivpur Rail Project
|
Railway
|
EAST CENTRAL RAILWAY
|
19.85
|
IN-PRINCIPLE
|
26-Sep-2017
|
|
|
|
|
|
No
|
9
|
Jharkhand
|
FP/JH/RAIL/16617/2015
|
FP/JH/RAIL/16617/2015
|
Tori Shivpur Rail Project
|
Railway
|
EAST CENTRAL RAILWAY
|
19.85
|
IN-PRINCIPLE
|
26-Sep-2017
|
|
|
|
|
|
No
|
10
|
Jharkhand
|
FP/JH/TRANS/18900/2016
|
FP/JH/TRANS/18900/2016
|
132 kV D/C Ramchandrapur-Jadugoda Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
12.845
|
IN-PRINCIPLE
|
03-Oct-2017
|
|
|
|
|
|
No
|
11
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
12
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
13
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
14
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
15
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
16
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
17
|
Jharkhand
|
FP/JH/Others/27162/2017
|
FP/JH/Others/27162/2017
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
113.4947
|
IN-PRINCIPLE
|
28-Jul-2019
|
|
|
|
|
|
No
|
18
|
Jharkhand
|
FP/JH/RAIL/54648/2020
|
FP/JH/RAIL/54648/2020
|
Dedicated Freight Corridor
|
Railway
|
DFCCIL
|
1.7587
|
IN-PRINCIPLE
|
06-Apr-2022
|
|
|
|
|
|
No
|
19
|
Jharkhand
|
FP/JH/RAIL/18720/2016
|
FP/JH/RAIL/18720/2016
|
Dedicated Freight Corridor
|
Railway
|
DFCCIL
|
203.803
|
IN-PRINCIPLE
|
15-May-2019
|
|
|
|
|
|
No
|
20
|
Jharkhand
|
FP/JH/RAIL/18720/2016
|
FP/JH/RAIL/18720/2016
|
Dedicated Freight Corridor
|
Railway
|
DFCCIL
|
203.803
|
IN-PRINCIPLE
|
15-May-2019
|
|
|
|
|
|
No
|
21
|
Jharkhand
|
FP/JH/SCH/26813/2017
|
Vanbhumi-17/2018
|
KENDRIYA VIDYALAYA, MEDININAGAR
|
School
|
KENDRIYA VIDYALAYA MEDININAGAR
|
4.04
|
IN-PRINCIPLE
|
24-Aug-2018
|
|
|
|
|
|
No
|
22
|
Jharkhand
|
FP/JH/MIN/13371/2015
|
8-61/2018-FC
|
Purnadih OCP
|
Mining
|
CENTRAL COALFIELDS LIMITED
|
323.49
|
IN-PRINCIPLE
|
17-Jan-2023
|
|
|
|
|
|
Yes
Proposal No.: IA/GJ/IND/20726/2013
EC File No.: J-11011/372/2013-IA-II (I)
Proposal Status: EC Granted
|
23
|
Jharkhand
|
FP/JH/IRRIG/15962/2015
|
8-06/2016-FC
|
PUNASI RESERVOIR SCHEME
|
Irrigation
|
WRD JHARKHAND
|
291.17
|
IN-PRINCIPLE
|
22-Dec-2016
|
|
|
|
|
|
Yes
EC File No.: 3/51/79-HCT/EN-5
Proposal Status: EC Granted
|
24
|
Jharkhand
|
FP/JH/ROAD/26179/2017
|
FP/JH/ROAD/26179/2017
|
Widening and Strengthening of Sonua-Pansua-Lodhai-Gudari Road. (Total Length:- 41.56 Km.)
|
Road
|
ROAD CONSTRUCTION DEPARTMNET
|
18.28
|
IN-PRINCIPLE
|
26-Aug-2021
|
|
|
|
|
|
No
|
25
|
Jharkhand
|
FP/JH/ROAD/146786/2021
|
FP/JH/ROAD/146786/2021
|
Construction of bypass around Chatra town on NH-22 (Old NH-99) in the state of Jharkhand under EPC Mode
|
Road
|
EXECUTIVE ENGINEER NH DIVISION HAZARIBAG
|
64.0849
|
IN-PRINCIPLE
|
21-May-2025
|
|
|
|
|
|
No
|
26
|
Jharkhand
|
FP/JH/Pipeline/152290/2022
|
FP/JH/Pipeline/152290/2022
|
Tie-in Connectivity of ONGC Bokaro CBM Field into JHBDPL Network of GAIL
|
Pipeline
|
GAIL INDIA LIMITED
|
8.3618
|
IN-PRINCIPLE
|
27-Apr-2023
|
|
|
|
|
|
No
|
27
|
Jharkhand
|
FP/JH/RAIL/36506/2018
|
FP/JH/RAIL/36506/2028
|
Amrapali Railway Siding
|
Railway
|
Central Coalfields Limited
|
120.61
|
IN-PRINCIPLE
|
18-Jan-2024
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 08 Jan 2024
|
No
|
28
|
Jharkhand
|
FP/JH/Others/26990/2017
|
FP/JH/Others/26990/2017
|
Nature and Wildlife Awareness Centre
|
Others
|
DC KODERMA
|
0.267
|
IN-PRINCIPLE
|
30-Sep-2019
|
|
|
|
|
|
No
|
29
|
Jharkhand
|
FP/JH/TRANS/19286/2016
|
FP/JH/TRANS/19286/2016
|
220 kV D/C Govindpur-Dumka Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
16.2635
|
IN-PRINCIPLE
|
18-May-2018
|
|
|
|
|
|
No
|
30
|
Jharkhand
|
FP/JH/TRANS/19286/2016
|
FP/JH/TRANS/19286/2016
|
220 kV D/C Govindpur-Dumka Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
16.2635
|
IN-PRINCIPLE
|
18-May-2018
|
|
|
|
|
|
No
|
31
|
Jharkhand
|
FP/JH/TRANS/19286/2016
|
FP/JH/TRANS/19286/2016
|
220 kV D/C Govindpur-Dumka Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
16.2635
|
IN-PRINCIPLE
|
18-May-2018
|
|
|
|
|
|
No
|
32
|
Jharkhand
|
FP/JH/Others/20067/2016
|
8-42/2017-FC
|
Konar washery
|
Others
|
CENTRAL COALFIELDS LIMITED
|
68.4
|
IN-PRINCIPLE
|
22-Jun-2018
|
|
|
|
|
|
Yes
Proposal Status: EC under process
|
33
|
Jharkhand
|
FP/JH/ROAD/23799/2017
|
FP/JH/ROAD/23799/2017
|
RECONSTRUCTION OF GUA SALAI ROAD KM 2.00 TO 11.OO
|
Road
|
ROAD CONSTRUCTION DEPARTMNET
|
9.969
|
IN-PRINCIPLE
|
05-Feb-2018
|
|
|
|
|
|
No
|
34
|
Jharkhand
|
FP/JH/VELEC/34134/2018
|
vanbhumi-52/2019
|
DDUGJY 33/11 KV POWER SUB-STATION
|
Village Electricity
|
JSEB GIRIDIH SOUTH
|
0.5139
|
IN-PRINCIPLE
|
01-Oct-2020
|
|
|
|
|
|
No
|
35
|
Jharkhand
|
FP/JH/MIN/44787/2020
|
8-64/1993-FC Vol.
|
Expansion of Surda Copper Mine
|
Mining
|
Hindustan Copper Limited
|
65.52
|
IN-PRINCIPLE
|
15-Jun-2024
|
|
|
|
|
|
Yes
Proposal No.: IA/JH/MIN/26614/2012
EC File No.: J-11015/80/2012-IA-II(M)
Proposal Status: EC Granted
|
36
|
Jharkhand
|
FP/JH/ROAD/24303/2017
|
Van bhumi-37/2016
|
Reconstruction of (Widening & Strengthening) of Gua Link Road.(MDR-187)[Hathi Chowk(Baraiburu) to Gua]. Total Length- 6.865 Km.
|
Road
|
ROAD CONSTRUCTION DEPARTMNET
|
2.356
|
IN-PRINCIPLE
|
13-Dec-2017
|
|
|
|
|
|
No
|
37
|
Jharkhand
|
FP/JH/ROAD/18687/2016
|
Van bhumi-01/2017
|
Construciton of Road - Sabano (Rani Pokhar) To Kendu (Bhawani Math)
|
Road
|
RDD RURAL WORK AFFAIRS WORKS DIVISION CHATRA
|
3.4324
|
IN-PRINCIPLE
|
08-Mar-2017
|
|
|
|
|
|
No
|
38
|
Jharkhand
|
FP/JH/TRANS/45077/2020
|
FP/JH/TRANS/45077/2020
|
132kV DC Jamua-Gawan Transmission Line (NIT-253)
|
Transmission Line
|
JUSNL
|
54.407
|
IN-PRINCIPLE
|
09-Jan-2025
|
|
|
|
|
|
No
|
39
|
Jharkhand
|
FP/JH/WATER/35936/2018
|
FP/JH/WATER/35936/2018
|
Hazaribagh Urban Water Supply Scheme
|
Drinking Water
|
URBAN DEVELOPMENT HOUSING DEPARTMENT
|
3.561
|
IN-PRINCIPLE
|
17-Jul-2023
|
|
|
|
|
|
No
|
40
|
Jharkhand
|
FP/JH/TRANS/27672/2017
|
FP/JH/TRANS/27672/2017
|
220 KV D/C ULIJHARI,CHAIBASA TO GUA TRANSMISSION LINE
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
51.251
|
IN-PRINCIPLE
|
22-Aug-2019
|
|
|
|
|
|
No
|
41
|
Jharkhand
|
FP/JH/TRANS/41236/2019
|
FP/JH/TRANS/41236/2019
|
Construction of 400 kV D/C North Karanpura to Gaya transmission line (Jharkhand Portion)
|
Transmission Line
|
NORTH KARANPURA TRANSCO LIMITED
|
197.0115
|
IN-PRINCIPLE
|
06-Jun-2023
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 28 Feb 2023
|
No
|
42
|
Jharkhand
|
FP/JH/TRANS/41236/2019
|
FP/JH/TRANS/41236/2019
|
Construction of 400 kV D/C North Karanpura to Gaya transmission line (Jharkhand Portion)
|
Transmission Line
|
NORTH KARANPURA TRANSCO LIMITED
|
197.0115
|
IN-PRINCIPLE
|
06-Jun-2023
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 28 Feb 2023
|
No
|
43
|
Jharkhand
|
FP/JH/TRANS/17225/2015
|
FP/JH/TRANS/17225/2015
|
Rajiv Gandhi Grameen Vidyutikaran Yojna, Hazaribag Package
|
Transmission Line
|
JHARKHAND BIJLI VITRAN NIGAM LIMITED
|
5.6322
|
IN-PRINCIPLE
|
29-Jun-2018
|
|
|
|
|
|
No
|
44
|
Jharkhand
|
FP/JH/TRANS/35396/2018
|
FP/JH/TRANS/35396/2018
|
132kV D/C Bahragoda Dhalbhumgarh Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED, JAMSHEDPUR
|
8.763
|
IN-PRINCIPLE
|
27-Jun-2019
|
|
|
|
|
|
No
|
45
|
Jharkhand
|
FP/JH/Others/12832/2015
|
vanbhumi-07/2015
|
CRPF Camp at Village Banalat, PS Bishunpur in Distt. Gumla
|
Others
|
SP GUMLA OFFICE
|
1.6
|
IN-PRINCIPLE
|
19-Jun-2015
|
|
|
|
|
|
No
|
46
|
Jharkhand
|
FP/JH/IRRIG/15780/2015
|
FP/JH/IRRIG/15780/2015
|
AMANAT BARRAGE SCHEME
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
127.85
|
IN-PRINCIPLE
|
05-Jan-2017
|
|
|
|
|
|
Yes
EC File No.: U.C.No. 3/1/78-HCT/ENV
Proposal Status: EC Granted
|
47
|
Jharkhand
|
FP/JH/TRANS/33711/2018
|
FP/JH/TRANS/33711/2018
|
Construction of 33KV D/C Transmission line for 16MVA power supply arrangement to M/s CCL-Karo konar OCW from DVC-BTPS S/yard
|
Transmission Line
|
DAMODAR VALLEY CORPORATION
|
4.9969
|
IN-PRINCIPLE
|
04-May-2025
|
|
|
|
|
|
No
|
48
|
Jharkhand
|
FP/JH/SCH/14971/2015
|
Van Bhumi 02/2016
|
GOVERNMENT MEDICAL COLLEGE
|
School
|
HEALTH AND FAMILY WELFARE DEPARTMENT GOVT OF JHARKHAND
|
4.85
|
IN-PRINCIPLE
|
21-Mar-2016
|
|
|
|
|
|
No
|
49
|
Jharkhand
|
FP/JH/ROAD/146250/2021
|
FP/JH/Road/146250/2021
|
Diversion of fresh Forest Land for development of Economic Corridors, Inter Corridors, Feeder Routes etc., under Bharatmala Pariyojana of Jaina More -Gola -Ormanjhi section in the state of Jharkhand.
|
Road
|
NHAI, PIU DHANBAD
|
99.7862
|
IN-PRINCIPLE
|
13-Jun-2023
|
|
|
|
|
|
No
|
50
|
Jharkhand
|
FP/JH/ROAD/146250/2021
|
FP/JH/Road/146250/2021
|
Diversion of fresh Forest Land for development of Economic Corridors, Inter Corridors, Feeder Routes etc., under Bharatmala Pariyojana of Jaina More -Gola -Ormanjhi section in the state of Jharkhand.
|
Road
|
NHAI, PIU DHANBAD
|
99.7862
|
IN-PRINCIPLE
|
13-Jun-2023
|
|
|
|
|
|
No
|
|