| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received on(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Jammu and Kashmir
|
FP/JK/ROAD/49091/2020
|
9-JKB029-2021-JAMMU
|
-gradation and maintenance of road from L041-Zaloora to Gujjerpathi
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.35
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
2
|
Jammu and Kashmir
|
FP/JK/ROAD/48777/2020
|
9-JKC-036/2021-Jammu
|
Kundhardan To Mamankote Upper Package No. JK14-567
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
7.69
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
3
|
Jammu and Kashmir
|
FP/JK/ROAD/45750/2020
|
9-JKA-089/2021
|
Construction of Road Kutyara to Kansar Via,. Haddal. by PWD(R&B) in Bhaderwah forest Division.
|
Road
|
R&B DEPARTMENT JAMMU
|
0.25
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
4
|
Jammu and Kashmir
|
FP/JK/ROAD/46843/2020
|
9-JKB-024/2022-Jammu
|
Construction of road fron Bindoo to zamalgam verinag
|
Road
|
EXECUTIVE ENGINEER PWD (R&B) DIVISION VAILOO
|
1.8
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
5
|
Jammu and Kashmir
|
FP/JK/ROAD/155313/2022
|
9-JKA-006/2023-Jammu
|
Completion of balance work of Mandagali Koyli road km 4th onwards
|
Road
|
EXECUTIVE ENGINEER
|
0.375
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
6
|
Jammu and Kashmir
|
FP/JK/ROAD/69388/2020
|
FST/Land/Parivesh/33/2021
|
Construction and maintenance of road from T02 Boniyar to Maidanan, Stage-U, Package No. JK03-2002, PMGSY-II (L=9.20km)”
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.27
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
7
|
Jammu and Kashmir
|
FP/JK/ROAD/57299/2020
|
9-JKB011-2021-JAMMU
|
Construction of road from Neeru to Sikander.
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
3.67
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
8
|
Jammu and Kashmir
|
FP/JK/ROAD/120321/2021
|
9-JKB042/2021-JAMMU
|
Upgradation of Road L-060 Kothar to Ponthal
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION JAMMU
|
1.482
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
9
|
Jammu and Kashmir
|
FP/JK/ROAD/138477/2021
|
FST-land0FC/65/2022-02
|
Road from Manga to Sananpaida Via Khudwan Pallian Phase-I
|
Road
|
PWD (R&B) CONST. DIVISION-II
|
0.12
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
10
|
Jammu and Kashmir
|
FP/JK/HYD/150591/2021
|
8-20/2024-FC
|
Sawalkot HE Project (1856 MW)
|
Hydel
|
NHPC LMITED
|
847.17
|
IN-PRINCIPLE
|
23-May-2025
|
01-Jan-1900
|
|
|
|
|
No
|
|
11
|
Jammu and Kashmir
|
FP/JK/WATER/143677/2021
|
FST-Land0FC/88/2021-02
|
Water Supply Scheme Gangbugh
|
Drinking Water
|
JAL SHAKTI (PHE) DIVISION KUPWARA
|
0.08
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
12
|
Jammu and Kashmir
|
FP/JK/ROAD/143592/2021
|
9-JKB-086/2021-Jammu
|
Improvement/Widening of Lakhanpur Thein Road RD 12/700 to RD 17/100
|
Road
|
EXECUTIVE ENGINEER PWD R&B KATHUA
|
3.386
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
13
|
Jammu and Kashmir
|
FP/JK/VELEC/150054/2021
|
FST-Land/0FC/14/2022-02
|
Rural Electrification works in Udhampur Distt under PMDP & DDUGJY
|
Village Electricity
|
EXECUTIVE ENGINEER, ELECTRIC DIVISION, JPDCL, UDHAMPUR
|
0.429
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/155190/2022
|
9-JKB-026/2022-Jammu
|
Construction of alternative alignment of LakhanpurThein road km 11th to 12th due to submergences of 2x39mtrs RCC Tgirder bridge on Nora nallah at 410.0 mtr. level.
|
Road
|
EXECUTIVE ENGINEER PWD R&B KATHUA
|
2.84
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/157238/2022
|
FST-land0FC/2/2023-02
|
Construction of phase 2nd of ongoing Road from Katyara to Kansar via Haddal from House of Sh. Rattan Lal village Lower Haddal to Village Bharai via village Upper Haddal
|
Road
|
PWD(R&B) DIVISION BHADERWAH
|
0.165
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
16
|
Jammu and Kashmir
|
FP/JK/ROAD/155228/2022
|
FST-Land0FC/7/2023-02
|
construction of link road from Mohalla Gagiyan W.No. 06 Lathoung Kallar Kattal
|
Road
|
PWD R&B DIVISION POONCH
|
0.3048
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
17
|
Jammu and Kashmir
|
FP/JK/ROAD/46670/2020
|
9-JKB043-2021-JAMMU
|
Construction of Road from Sumwal to Sarail Choa (JK14-402)
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION RAMNAGAR
|
0.48
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
18
|
Jammu and Kashmir
|
FP/JK/ROAD/49797/2020
|
9-JKA-058/2021-Jammu
|
Construction of Road from Dhaman to Khad
|
Road
|
PWD (R&B) DIVISION REASI
|
0.3
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
19
|
Jammu and Kashmir
|
FP/JK/WATER/118915/2021
|
FST-land0FC/73/2021-02(eoffice)
|
WSS UPPER DANDIPORA
|
Drinking Water
|
CHIEF ENGINEER
|
0.15
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
20
|
Jammu and Kashmir
|
FP/JK/WATER/139429/2021
|
FST-land0FC/95/2021-02
|
CONSTRUCTION OF PUMP ROOM BUILDING AND 10000 GLNS SUMP TANK AT VILLAGE SAR SABAL
|
Drinking Water
|
CHIEF ENGINEER JAL SHAKTI VIBHAG
|
0.045
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
21
|
Jammu and Kashmir
|
FP/JK/WATER/123462/2021
|
FST-land0FC/105/2021-02
|
WSS Banjar Basti Bela Wussan
|
Drinking Water
|
JAL SHAKTI DEPARTMENT PHE KASHMIR
|
0.176
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
22
|
Jammu and Kashmir
|
FP/JK/ROAD/147077/2021
|
9-JKB-008/2023-Jammu
|
Construction and Upgradation of Bijarni to Lal Draman Link Road Km 1st to Km 10th Rd (600).
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
1.137
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
23
|
Jammu and Kashmir
|
FP/JK/HYD/150591/2021
|
8-20/2024-FC
|
Sawalkot HE Project (1856 MW)
|
Hydel
|
NHPC LMITED
|
847.17
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/45646/2020
|
9-JKB009-2021-CHA
|
Tanda to Kapai Di Bhan part 2
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION JAMMU
|
1.36
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
25
|
Jammu and Kashmir
|
FP/JK/ROAD/49000/2020
|
9-JKB012/2021-JAMMU
|
Construction of Road from T-01 Km 2nd to Dhanori
|
Road
|
PMGSY DIVISION REASI
|
0.315
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
26
|
Jammu and Kashmir
|
FP/JK/WATER/100420/2020
|
FST/Land/Parivesh/57/2021 ( FST-PRVS/1/2021-02)
|
WSS Bainsta Ramnagar
|
Drinking Water
|
EXECUTIVE ENGINEER JAL SHAKTI (PHE) DIVISION UDHAMPUR
|
0.103
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
27
|
Jammu and Kashmir
|
FP/JK/ROAD/118616/2021
|
9-JKB023-2021-JAMMU
|
Construction of road from Patnazi to Kither
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
2.895
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
28
|
Jammu and Kashmir
|
FP/JK/ROAD/54083/2020
|
9-JKB041-2021-JAMMU
|
Kharangal to Chounri
|
Road
|
PMGSY DIVISION THATHRI
|
0.88
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
29
|
Jammu and Kashmir
|
FP/JK/ROAD/56838/2020
|
9-JKB044-2021-JAMMU
|
Up-Gradation & Maintenance of Road from Panzlla to Shitloo
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.5
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
30
|
Jammu and Kashmir
|
FP/JK/WATER/144569/2021
|
FST-land0FC/62/2022-02
|
Water Supply Scheme Chandil Wanigam
|
Drinking Water
|
JAL SHAKTI DEPARTMENT PHE KASHMIR
|
0.3134
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
31
|
Jammu and Kashmir
|
FP/JK/ROAD/155314/2022
|
FST-land0FC/75/2022-02
|
construction of road from Chawa to Barwan school via Irwanwali
|
Road
|
EXECUTIVE ENGINEER
|
0.585
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
32
|
Jammu and Kashmir
|
FP/JK/ROAD/155672/2022
|
FST-land0FC/82/2022-02
|
Construction of road from Charota Gala to Patakhetar under PWD(R&B)Division Rajouri,under languishing(LUP-0858),F.Area (L=0.315KM,W=.006KM)
|
Road
|
EXECUTIVE ENGINEER
|
0.189
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
33
|
Jammu and Kashmir
|
FP/JK/ROAD/140864/2021
|
9-JKA-028/2022-Jammu
|
Limber To Budrali
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.605
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
34
|
Jammu and Kashmir
|
FP/JK/Others/81718/2020
|
FST-land0FC/58/2021-02(eoffice)
|
Reliance 4G High Speed Internet Project (Installation of Mobile Tower at Begoga, Duggan Block)
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.01
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
35
|
Jammu and Kashmir
|
FP/JK/ROAD/148320/2021
|
FST-Land/0FC/104/2021-02
|
L039 Kakuthal to Brannar
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.16082
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
36
|
Jammu and Kashmir
|
FP/JK/WATER/144060/2021
|
Fst-land0FC/93/2021-02
|
Water Supply Scheme Wani Doursa Tekipora
|
Drinking Water
|
JAL SHAKTI (PHE) DIVISION KUPWARA
|
0.5068
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
37
|
Jammu and Kashmir
|
FP/JK/Others/153273/2022
|
9-JKA-044/2022-Jammu
|
Construction of Treasury Building at Bani
|
Others
|
DIRECTOR ACCOUNTS & TREASURIES JAMMU
|
0.05
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
38
|
Jammu and Kashmir
|
FP/JK/ROAD/157641/2022
|
FST-Land0FC/268/2023-02
|
Const. of link road from Parmandal to Rajoli
|
Road
|
XEN PWD (SAMBA)
|
0.54
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
39
|
Jammu and Kashmir
|
FP/JK/ROAD/45525/2020
|
9-JKB010/2021-JAMMU
|
Road from GarhSamnabanj to Marila Rajundi
|
Road
|
EXECUTIVE ENGINEER PMGSY DIVISION RAMNAGAR
|
1.9825
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
40
|
Jammu and Kashmir
|
FP/JK/ROAD/123518/2021
|
9-JKA-061/2021-Jammu
|
Widening ad Upgradation of road from MRL01-Baghbala to Nichian Package No. JK082003 PMGSY-II
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
2.74
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
41
|
Jammu and Kashmir
|
FP/JK/ROAD/46659/2020
|
9-JKB-079/2021-Jammu
|
Construction of Road Padhri to Bhal padri By PWD(R&B) in Bhaderwah Forest Division.
|
Road
|
R&B DEPARTMENT JAMMU
|
6.48
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
42
|
Jammu and Kashmir
|
FP/JK/QRY/150118/2021
|
9-JKA-020/2022-Jammu
|
Gammon Stone Quarry Sangaldan Gool
|
Quarrying
|
GAMMON ENGINEERS AND CONTRACTORS PRIVATE LIMITED
|
0.63
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
43
|
Jammu and Kashmir
|
FP/JK/ROAD/154278/2022
|
FST-land0FC/89/2022-02
|
Construction of Bheli Lal Draman road Km 4th to Km 19th by way of Earth work and Walling Phase.
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
0.11
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
44
|
Jammu and Kashmir
|
FP/JK/ROAD/150453/2021
|
9-JKB-025/2023-Jammu
|
Construction of Road from Chilla-Danga to Kathar-Brahmana
|
Road
|
XEN PWD (SAMBA)
|
1.02
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
45
|
Jammu and Kashmir
|
FP/JK/HYD/44025/2020
|
8-09/2020-FC
|
Ujh Multipurpose Project
|
Hydel
|
JKSPDC
|
680.1
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
Yes
Proposal No.: IA/JK/RIV/84991/2018
EC File No.: J-12011/39/2014 -IA I
Proposal Status: EC Granted
|
|
46
|
Jammu and Kashmir
|
FP/JK/WATER/49613/2020
|
Fst/Land/Parivesh/21/2021
|
WSS REZAN
|
Drinking Water
|
JAL SHAKTI DEPARTMENT PHE KASHMIR
|
0.1
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
47
|
Jammu and Kashmir
|
FP/JK/ROAD/138546/2021
|
9-JKA-065/2021-Jammu
|
CONSTRUCTION OF ROAD FROM BARKUNDA TO KHARWA
|
Road
|
EE PMGSY UDH
|
0.225
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
48
|
Jammu and Kashmir
|
FP/JK/ROAD/138548/2021
|
9-JKB-064/2021-Jammu
|
Construction of road from Mantlai to Gamsadu
|
Road
|
EE PMGSY UDH
|
0.78
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
49
|
Jammu and Kashmir
|
FP/JK/WATER/144256/2021
|
FST-Land/0FC/113/2021-02
|
Water Supply Scheme Sogam
|
Drinking Water
|
JAL SHAKTI (PHE) DIVISION KUPWARA
|
0.2888
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|
50
|
Jammu and Kashmir
|
FP/JK/TRANS/143878/2021
|
9-JKA-083/2021-Jammu
|
Re-alignment of 220 kv KPTL & 132 KV CSTL for the four lanning of National Highway 44 between Ramban - Banihal Section
|
Transmission Line
|
EXECUTIVE ENGINEER TLMD 3 UDHAMPUR
|
0.339
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|