Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/Others/151759/2022
|
8B/UCP/09/40/2022/FC
|
Construction of Dovelepment Centre.
|
Others
|
ZILA SAINIK KALYAN EVAM PUNARVAS HALDWANI, NAINITAL.
|
0.063
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2024
|
|
|
|
11 Sep 2024
|
2
|
Uttarakhand
|
FP/UK/ROAD/27736/2017
|
8B/UCP/06/146/2019/FC
|
Construction of Lambagad (Nailbend)to Jhoomakhet Link Motor road under PMGSY
|
Road
|
RES PMGSY KARANPERAYAG
|
2.4165
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2019
|
Stage-I Approval on
|
:
|
13 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2024
|
|
|
|
03 Sep 2024
|
3
|
Uttarakhand
|
FP/UK/ROAD/35251/2018
|
8B/UCP/06/69/2019/FC
|
Construction of Road from Anand Singh House to GHS School at Dechori Degaon Naya Pandey Gaon Under Kaladhungi Constituency
|
Road
|
PWD RAMNAGAR
|
0.405
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2018
|
Stage-I Approval on
|
:
|
26 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jul 2024
|
|
|
|
03 Sep 2024
|
4
|
Uttarakhand
|
FP/UK/ROAD/39053/2019
|
8B/UCP/06/02/2020/FC
|
Construction of Tanakpur Tawaghat M/R to Sigda Motor Road
|
Road
|
PMGSY LOHAGHAT
|
3.9115
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2019
|
Stage-I Approval on
|
:
|
09 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2024
|
|
|
|
03 Sep 2024
|
5
|
Uttarakhand
|
FP/UK/ROAD/150531/2021
|
1(88)/23
|
Construction Of Road and 60 m Span Bridge From Village Devipura To gyanpurgodi in Nanakmatta Constancy under TSP
|
Road
|
District Youth Services & Sports Hamirpur
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
27 Aug 2024
|
6
|
Uttarakhand
|
FP/UK/ROAD/45326/2020
|
8B/UCP/06/64/2022/FC
|
Kotdwara-Satpuli-Jwalpa-Srinagar section (from Km 139.000 to 276.000) of NH -119 in the state of Uttrakhanand Section Form km 139.000 to 196.600
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAY CANAL ROAD DEHRADUN
|
42.076
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 May 2020
|
Stage-I Approval on
|
:
|
23 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2024
|
|
|
|
14 Aug 2024
|
7
|
Uttarakhand
|
FP/UK/ROAD/20179/2016
|
8B/UCP/06/02/2017/FC
|
Malli-Bandhangaon motor road to Thaula to Maad motor road.
|
Road
|
EXECUTIVE ENGINEER
|
8.346
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2016
|
Stage-I Approval on
|
:
|
20 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 May 2024
|
|
|
|
31 Jul 2024
|
8
|
Uttarakhand
|
FP/UK/ROAD/22084/2016
|
8B/UCP/06/98/2019/FC
|
Construction of Km-15 of Raipur-Kumalda-Kaddukhal Motor Road to Ragar Gaon
|
Road
|
PMGSY ID IIND NEW TEHRI
|
9.8875
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2016
|
Stage-I Approval on
|
:
|
06 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jan 2024
|
|
|
|
24 Jun 2024
|
9
|
Uttarakhand
|
FP/UK/ROAD/146609/2021
|
8B/UCP/06/14/2023/FC
|
Improvement and up-gradation of NH-74 (New NH-30) stretch from Bareilly to Sitarganj under Bharatmala Pariyojana Lot-4/Package-2 in the state of Uttar Pradesh and Uttarakhand
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY
|
0.7905
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
28 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2024
|
|
|
|
17 Jun 2024
|
10
|
Uttarakhand
|
FP/UK/ROAD/44583/2020
|
8B/UCP/06/159/2020/FC
|
Under chief minister announcement in legislative assembly area and block Yamkeshwar on Chilla - Pashulok motor road at Been river near by Gangabhogpur construction of double lane R.C.C. bridge span 200 mtr.
|
Road
|
ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN
|
0.51
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2020
|
Stage-I Approval on
|
:
|
26 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2024
|
|
|
|
14 Jun 2024
|
11
|
Uttarakhand
|
FP/UK/ROAD/156915/2022
|
8B/UCP/06/76/2022/FC
|
Sahastradhara to Naliwala new MR
|
Road
|
PMGSY ID DEHRADUN
|
4.22
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2022
|
Stage-I Approval on
|
:
|
23 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Apr 2024
|
|
|
|
31 May 2024
|
12
|
Uttarakhand
|
FP/UK/ROAD/10979/2015
|
8B/UCP/06/231/2015/FC
|
Construction of Nauli Bend to Nauli Village Motor Road under District Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.4025
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2015
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2023
|
|
|
|
20 May 2024
|
13
|
Uttarakhand
|
FP/UK/ROAD/38362/2019
|
8B/UCP/06/28/2020/FC
|
Construction of Bhararisain to Parwadi link Motor road
|
Road
|
RES PMGSY KARANPERAYAG
|
6.5525
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2019
|
Stage-I Approval on
|
:
|
31 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2023
|
|
|
|
08 May 2024
|
14
|
Uttarakhand
|
FP/UK/ROAD/150430/2021
|
8B/UCP/06/56/2022/FC
|
Diversion of 2.183 ha of forest land for construction of Rudrapur Ring Road in the state of Uttrakhand under FCA 1980
|
Road
|
NHAI, PIU-RUDRAPUR
|
2.183
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
26 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2024
|
|
|
|
02 May 2024
|
15
|
Uttarakhand
|
FP/UK/ROAD/9471/2015
|
8B/UCP/06/89/2019/FC
|
Satoli Kaphura motor road
|
Road
|
EE CD NAINITAL
|
2.988
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2015
|
Stage-I Approval on
|
:
|
17 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
02 Apr 2024
|
|
|
|
22 Apr 2024
|
16
|
Uttarakhand
|
FP/UK/REHAB/40824/2019
|
8B/UCP/09/193/2019/FC
|
REHABILITATION OF REMAINING FAMILIES OF KHANDGAON RAJAJI CORRIDOR.
|
Rehabilitation
|
RAJAJI TIGER RESERVE
|
2.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2019
|
Stage-I Approval on
|
:
|
20 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2024
|
|
|
|
22 Apr 2024
|
17
|
Uttarakhand
|
FP/UK/ROAD/23185/2016
|
8B/UCP/06/123/2018/FC
|
Construction of Moniyabhiyol-Gumchi-Bhanar-Bhumiyagad-Dhar ki Toli-Sabji-Bhaiskhal-Bholathal motor road in District Bageshwar (CM Ghosna-872/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.259
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2016
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2024
|
|
|
|
17 Apr 2024
|
18
|
Uttarakhand
|
FP/UK/ROAD/47302/2020
|
8B/UCP/06/174/2020/FC
|
Construction of KOTGAON (NAITWAR) to KALAP motor road
|
Road
|
PMGSY MORI
|
11.115
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2020
|
Stage-I Approval on
|
:
|
18 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2023
|
|
|
|
17 Apr 2024
|
19
|
Uttarakhand
|
FP/UK/ROAD/9657/2015
|
8B/UCP/06/29/2015
|
Tanakpur Tawaghat NH to Ranthi Motor Road
|
Road
|
PMGSY
|
10.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2015
|
Stage-I Approval on
|
:
|
15 Apr 2016
|
Compliance Report Submitted by User Agency on
|
:
|
14 Feb 2024
|
|
|
|
16 Apr 2024
|
20
|
Uttarakhand
|
FP/UK/ROAD/10057/2015
|
8B/UCP/06/209/2015/FC
|
Lohari-Silli-Band-Kansyari motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.747
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Feb 2015
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2024
|
|
|
|
16 Apr 2024
|
21
|
Uttarakhand
|
FP/UK/ROAD/15521/2015
|
8B/UCP/06/143/2018/FC
|
Dyaurara-Kapleshwar motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.4875
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2015
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2024
|
|
|
|
16 Apr 2024
|
22
|
Uttarakhand
|
FP/UK/ROAD/16904/2015
|
8B/UCP/06/11/2019/FC
|
Nargoli-Simayal-Bhandarisera-Saliya-Jagiyura motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.4342
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2015
|
Stage-I Approval on
|
:
|
09 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2024
|
|
|
|
16 Apr 2024
|
23
|
Uttarakhand
|
FP/UK/ROAD/12985/2015
|
8B/UCP/06/227/2016/FC
|
Gaindikhata to Naurangabad Motor Road
|
Road
|
PMGSY ID DEHRADUN
|
1.603
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2015
|
Stage-I Approval on
|
:
|
27 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2023
|
|
|
|
09 Mar 2024
|
24
|
Uttarakhand
|
FP/UK/ROAD/11278/2015
|
8B/UCP/06/193/2016/FC
|
kathpuria bangsar motor road (length 3.00 km)
|
Road
|
EXECUTIVE ENGINEER
|
2.095
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2015
|
Stage-I Approval on
|
:
|
16 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2024
|
|
|
|
16 Feb 2024
|
25
|
Uttarakhand
|
FP/UK/ROAD/37687/2018
|
8B/UCP/06/96/2020/FC
|
Road from km 3.20 of Raiagar Chaurmanya road to Koteshwar Chacharet.
|
Road
|
EE TY DIV PWD BERINAG
|
2.385
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
26 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2023
|
|
|
|
11 Jan 2024
|
26
|
Uttarakhand
|
FP/UK/ROAD/13333/2015
|
8B/UCP/06/20/2016/FC
|
Halduwala to Chowcky Birawadi MR
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.0752
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2015
|
Stage-I Approval on
|
:
|
18 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2023
|
|
|
|
03 Jan 2024
|
27
|
Uttarakhand
|
FP/UK/ROAD/41658/2019
|
8B/UCP/06/20/2020/FC
|
Pokhal-Mandlu MR to Khamana, Stage-I, Length- 4.875KM
|
Road
|
PMGSY DUGADDA
|
1.628
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2019
|
Stage-I Approval on
|
:
|
12 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2023
|
|
|
|
19 Dec 2023
|
28
|
Uttarakhand
|
FP/UK/ROAD/7842/2014
|
8B/UCP/06/25/2015
|
Construction of Birtola to Belkot Motor Road
|
Road
|
P.M.G.S.Y Didihat
|
6.1395
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Nov 2014
|
Stage-I Approval on
|
:
|
23 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
11 Dec 2023
|
29
|
Uttarakhand
|
FP/UK/ROAD/9015/2014
|
8B/UCP/06/80/2015
|
Gauchar to Damhdama Motor road under PMGSY
|
Road
|
PMGSY
|
4.97
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jan 2015
|
Stage-I Approval on
|
:
|
03 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2023
|
|
|
|
11 Dec 2023
|
30
|
Uttarakhand
|
FP/UK/ROAD/33105/2018
|
8B/UCP/06/62/2019/FC
|
Sanara to Malihari Motor Road.
|
Road
|
PUBLIC WORKS DEPARTMENT
|
4.286
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2018
|
Stage-I Approval on
|
:
|
24 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2023
|
|
|
|
11 Dec 2023
|
31
|
Uttarakhand
|
FP/UK/ROAD/44176/2020
|
8B/UCP/06/104/2020/FC
|
Construction of Dhautigad Panchgav Syura Link Motor Road Length 6.00KM
|
Road
|
EXECUTIVE ENGINEER
|
3.708
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
Stage-I Approval on
|
:
|
28 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Oct 2023
|
|
|
|
11 Dec 2023
|
32
|
Uttarakhand
|
FP/UK/ROAD/49541/2020
|
8B/UCP/06/78/2021/FC
|
Village Dhari to Bagyon Motor road
|
Road
|
PWD
|
0.991
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2020
|
Stage-I Approval on
|
:
|
29 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2023
|
|
|
|
11 Dec 2023
|
33
|
Uttarakhand
|
FP/UK/ROAD/38398/2019
|
8B/UCP/06/34/2020/FC
|
Construction of Laluwapali - Banlekh M/R to Nadhan M/R under PMGSY Champawat
|
Road
|
PMGSY
|
2.272
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jun 2019
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2023
|
|
|
|
21 Nov 2023
|
34
|
Uttarakhand
|
FP/UK/ROAD/147686/2021
|
8B/UCP/06/47/2022/FC
|
Diversion of forest land for the development of 6-lane (greenfield) access-controlled spur to Haridwar UP/Uttarakhand Boarder near Manakpur Adampur village (Ch:19+070) to Manoharpur village (Ch: 50+090) in Haridwar district of Uttarakhand State.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDAI PIU ROORKEE
|
1.6535
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2021
|
Stage-I Approval on
|
:
|
25 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Nov 2023
|
|
|
|
21 Nov 2023
|
35
|
Uttarakhand
|
FP/UK/ROAD/12372/2015
|
01(267)/2016
|
Construction of Pandavthali Uchola Mana Motor Road under District Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 May 2015
|
Stage-I Approval on
|
:
|
13 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2023
|
|
|
|
06 Nov 2023
|
36
|
Uttarakhand
|
FP/UK/ROAD/11576/2015
|
8B/UCP/06/271/2015/FC
|
Construction of Rauli to Kuneth Motor Road, km-5.50, Under PMGSY
|
Road
|
PMGSY BAIJRO
|
4.968
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2015
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2023
|
|
|
|
03 Nov 2023
|
37
|
Uttarakhand
|
FP/UK/ROAD/38416/2019
|
8B/UCP/06/197/2019/FC
|
Kunjethi to Byunkhi Motor Road
|
Road
|
PMGSY
|
2.7225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2019
|
Stage-I Approval on
|
:
|
06 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Oct 2023
|
|
|
|
03 Nov 2023
|
38
|
Uttarakhand
|
FP/UK/ROAD/38456/2019
|
8B/UCP/06/43/2020/FC
|
Construction of Ghansali akhori m/r km 18 to Saruna kot chanji M/r
|
Road
|
PMGSY
|
4.41
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2019
|
Stage-I Approval on
|
:
|
29 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2023
|
|
|
|
03 Nov 2023
|
39
|
Uttarakhand
|
FP/UK/ROAD/10485/2015
|
8B/UCP/06/261/2015/FC
|
Construction of Dhaun to Badoli M/R under PMGSY Champawat.
|
Road
|
PMGSY
|
3.36
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2015
|
Stage-I Approval on
|
:
|
24 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2023
|
|
|
|
20 Oct 2023
|
40
|
Uttarakhand
|
FP/UK/ROAD/37559/2018
|
8B/UCP/06/82/2020/FC
|
Basolikhan Chamtola Motor Road to Nayaldhura Motor Road.
|
Road
|
PMGSY
|
2.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2018
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Sep 2023
|
|
|
|
20 Oct 2023
|
41
|
Uttarakhand
|
FP/UK/ROAD/39213/2019
|
8B/UCP/06/122/2020/FC
|
Majkhali-Digoti motor Road to Majethi Village Motor Road(Length 4.00KM)
|
Road
|
EXECUTIVE ENGINEER
|
0.638
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2023
|
|
|
|
20 Oct 2023
|
42
|
Uttarakhand
|
FP/UK/ROAD/149608/2021
|
8B/UCP/06/130/2021/FC
|
Improvement and widening of Dhungatoli to Tawaghat Motor Road
|
Road
|
BORDER ROAD ORGANISATION (GREF)
|
29.69
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2021
|
Stage-I Approval on
|
:
|
31 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2023
|
|
|
|
20 Oct 2023
|
43
|
Uttarakhand
|
FP/UK/ROAD/9590/2015
|
8B/UCP/06/266/2015
|
DT Road to Kumarkot Motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
1.89
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2015
|
Stage-I Approval on
|
:
|
25 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Sep 2023
|
|
|
|
17 Oct 2023
|
44
|
Uttarakhand
|
FP/UK/ROAD/10123/2015
|
8B/UCP/06/116/2015
|
Construction of Mohankhal - Talikansari Motor Road
|
Road
|
PMGSY DIVISION PWD POKHARI
|
2.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2015
|
Stage-I Approval on
|
:
|
04 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
30 Sep 2023
|
|
|
|
17 Oct 2023
|
45
|
Uttarakhand
|
FP/UK/WATER/151514/2022
|
8B/UCP/09/41/2022/FC
|
Dhikuli Water Supply Scheme Under Jal Jeevan Mission (CM Declaration No.-605/2019)
|
Drinking Water
|
UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM
|
0.075
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2022
|
Stage-I Approval on
|
:
|
03 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Sep 2023
|
|
|
|
17 Oct 2023
|
46
|
Uttarakhand
|
FP/UK/ROAD/10790/2015
|
8B/UCP/06/55/2016/FC
|
Construction of Shrigad - Hanoli Motor Road
|
Road
|
PMGSY DIVISION PWD POKHARI
|
2.1
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2015
|
Stage-I Approval on
|
:
|
26 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2023
|
|
|
|
17 Oct 2023
|
47
|
Uttarakhand
|
FP/UK/ROAD/42789/2019
|
8B/UCP/06/30/2020/FC
|
SAURA SARI SILLA TO PILANG MOTOR ROAD
|
Road
|
PMGSY ID UTTARKASHI
|
6.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Nov 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2023
|
|
|
|
16 Oct 2023
|
48
|
Uttarakhand
|
FP/UK/ROAD/23279/2016
|
8B/UCP/06/7/2018
|
Lohali to Thuwablock Motor Road
|
Road
|
PMGSY
|
4.9875
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2016
|
Stage-I Approval on
|
:
|
31 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
21 Sep 2023
|
|
|
|
10 Oct 2023
|
49
|
Uttarakhand
|
FP/UK/ROAD/28919/2017
|
8B/UCP/06/113/2018/FC
|
Bageshwar Kapkot Tejam MR Km 33 to Kiroli MR
|
Road
|
PMGSY
|
2.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2017
|
Stage-I Approval on
|
:
|
17 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2023
|
|
|
|
04 Oct 2023
|
50
|
Uttarakhand
|
FP/UK/Others/21482/2016
|
8B/UCP/06/32/2020/FC
|
Construction of Government degree college masi Tahsil Chaukhutia Distt. Almora Uttarakhand
|
Others
|
DIRECTOR OF HIGHER EDUCATION
|
0.962
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2016
|
Stage-I Approval on
|
:
|
17 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
22 Sep 2023
|
|