| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Bihar
|
FP/BR/ROAD/39045/2019
|
FP/BR/ROAD/39045/2019
|
Construction of HL RCC Bridge at KM 2nd, KM 14th, KM 40th & KM 43th of NH – 333 in the state of Bihar under Action Plan 2017-18.
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
1.206
|
IN-PRINCIPLE
|
11-Apr-2020
|
|
|
|
|
|
No
|
|
2
|
Bihar
|
FP/BR/Approach/46520/2020
|
FP/BR/Approach/46520/2020
|
The proposal for establishment of retail out-let dealership of M/s Hindustan Petroleum Corporation Ltd. Location within 3 KM on Either Side of Police Kendra Banka on SH-25 Bhagalpur-Amarpur-Banka Road
|
Approach Access
|
MS. KUMARI SHWETA
|
0.02274
|
IN-PRINCIPLE
|
29-Jan-2021
|
|
|
|
|
|
No
|
|
3
|
Bihar
|
FP/BR/Others/34650/2018
|
FP/BR/OTHERS/34650/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Samastipur-Sarairanjan-Patori Road in Samastipur district of Bihar.
|
Others
|
RAJENDRA DAS
|
0.0105
|
IN-PRINCIPLE
|
19-Jul-2019
|
|
|
|
|
|
No
|
|
4
|
Bihar
|
FP/BR/Others/43046/2019
|
FP/BR/Others/43046/2019
|
Diversion of 0.0225 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of NH-57 in Madhubani district of Bihar.
|
Others
|
JOHNEY EMMANUEL TIRKEY
|
0.0225
|
IN-PRINCIPLE
|
15-Apr-2020
|
|
|
|
|
|
No
|
|
5
|
Bihar
|
FP/BR/Others/30020/2017
|
FP/BR/OTHERS/30020/2017
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bakhadda Chowk on Malipur-Daulatpur Road in Begusarai district of Bihar.
|
Others
|
INDIAN OIL CORP LTD
|
0.0075
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
|
6
|
Bihar
|
FP/BR/Others/32454/2018
|
FP/BR/OTHERS/32454/2018
|
Diversion of 0.03 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of Wazzirganj-Fatehpur Road in Gaya district of Bihar.
|
Others
|
AJAY KUMAR DINKAR
|
0.03
|
IN-PRINCIPLE
|
17-Jun-2019
|
|
|
|
|
|
No
|
|
7
|
Bihar
|
FP/BR/Approach/144751/2021
|
FP/BR/Approach/144751/2021
|
Diversion of 0.0135 ha of forest land for construction of approach road for opening retail outlet of BPCL on Ganpatganj-Pipra NH-106 Road in Supaul district of Bihar.
|
Approach Access
|
BIDHANSHU RANJAN
|
0.0135
|
IN-PRINCIPLE
|
21-Mar-2022
|
|
|
|
|
|
No
|
|
8
|
Bihar
|
FP/BR/ROAD/30705/2017
|
FP/BR/ROAD/30705/2017
|
We are seeking prior approval to cut the trees under forest Division saran (Chapra) of the Sonepur-Darihara Road having chainage 0.00-21.00 KM
|
Road
|
ROAD CONSTRUCTION DEPARTMENT
|
44.16
|
IN-PRINCIPLE
|
26-Sep-2018
|
|
|
|
|
|
No
|
|
9
|
Bihar
|
FP/BR/Others/45405/2020
|
FP/BR/Others/45405/2020
|
STORM WATER DRAINAGE PROJECT
|
Others
|
EE BUIDCO SUPAUL
|
0.09
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
|
10
|
Bihar
|
FP/BR/Others/50117/2020
|
FP/BR/Others/50117/2020
|
Diversion of 0.01635 ha of forest land for construction of approach road for opening retail outlet of BPCL on Sh-74 Road in Vaishali district of Bihar.
|
Others
|
SURENDRA KUMAR
|
0.01635
|
IN-PRINCIPLE
|
26-Feb-2021
|
|
|
|
|
|
No
|
|
11
|
Bihar
|
FP/BR/Others/49310/2020
|
FP/BR/Others/49310/2020
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-65 Road in Purnea district of Bihar.
|
Others
|
PREMA KUMARI
|
0.015
|
IN-PRINCIPLE
|
29-Feb-2024
|
|
|
|
|
|
No
|
|
12
|
Bihar
|
FP/BR/ROAD/148281/2021
|
FP/BR/ROAD/148281/2021
|
Widening and Geometric improvement including Paved Shouldering work of existing 2-lane to 4-lane of km .92.935 (start point of old NH-82) TO 99.685 km (End Point of Gaya Bypass of NH-83) of NH-120 (To
|
Road
|
EXECUTIVE ENGINEER N. H. DIVISION GAYA
|
25.65
|
IN-PRINCIPLE
|
04-Aug-2023
|
|
|
|
|
|
No
|
|
13
|
Bihar
|
FP/BR/ROAD/21782/2016
|
FP/BR/ROAD/21782/2016
|
Forest Diversion Proposal of Diversion of 1.47 ha PF Land for construction of Flyover & Vehicular Underpass at Patna-Gaya-Dobhi Section of NH-83 0.00-127.00 KM
|
Road
|
PROJECT DIRECTOR NHAI PIU GAYA
|
1.47
|
IN-PRINCIPLE
|
18-Sep-2017
|
|
|
|
|
|
No
|
|
14
|
Bihar
|
FP/BR/Approach/156161/2022
|
FP/BR/Approach/156161/2022
|
Diversion of 0.029715 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-13 Buxar-Bare More chausa Road in Buxar district of Bihar.
|
Approach Access
|
RITESH KUMAR
|
0.02972
|
IN-PRINCIPLE
|
06-Mar-2023
|
|
|
|
|
|
No
|
|
15
|
Bihar
|
FP/BR/Others/27191/2017
|
FP/BR/Others/27191/2017
|
Proposal for construction of Block Development Office-cum-Circle Office
|
Others
|
BLOCK DEVELOPMENT OFFICER BANKEY BAZAR BLOCK GAYA
|
1.1
|
IN-PRINCIPLE
|
23-Jan-2018
|
|
|
|
|
|
No
|
|
16
|
Bihar
|
FP/BR/Approach/46983/2020
|
FP/BR/Approach/46983/2020
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd.
|
Approach Access
|
SRI RAKESH KUMAR
|
0.0135
|
IN-PRINCIPLE
|
28-Jan-2021
|
|
|
|
|
|
No
|
|
17
|
Bihar
|
FP/BR/Others/51189/2020
|
FP/BR/Others/51189/2020/4765
|
Diversion of 0.006 ha of forest land for construction of approach road for opening retail outlet for Bio-diesel of Goal Gas Pvt. Ltd. on SH-55A Gharghra-Bakhari Road in Begusarai district of Bihar.
|
Others
|
PRVEEN KUMAR
|
0.006
|
IN-PRINCIPLE
|
26-Jul-2021
|
|
|
|
|
|
No
|
|
18
|
Bihar
|
FP/BR/RAIL/21907/2016
|
FP/BR/Rail/21907/2016
|
road over bridge on NH-101
|
Railway
|
NORTH EASTERN RAILWAY
|
1.361
|
IN-PRINCIPLE
|
06-Mar-2019
|
|
|
|
|
|
No
|
|
19
|
Bihar
|
FP/BR/Others/44475/2020
|
FP/BR/Others/44475/2020
|
Diversion of 0.00765 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-93 Road in Samastipur district of Bihar.
|
Others
|
URMILA DEVI
|
0.00765
|
IN-PRINCIPLE
|
15-Jun-2020
|
|
|
|
|
|
No
|
|
20
|
Bihar
|
FP/BR/ROAD/151153/2022
|
FP/BR/ROAD/151153/2022
|
Improvement of Two Laning with Paved Shoulder for Existing portion (CH: 40+460 (Design CH-38+650) to CH: 46+860 (Design CH: 45+050)) of NH-219 of Mohania -Bhabhua -Chainpur -UP Border in Bihar on EPC
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION AURANGABAD BIHAR
|
8
|
IN-PRINCIPLE
|
30-May-2023
|
|
|
|
|
|
No
|
|
21
|
Bihar
|
FP/BR/Others/33210/2018
|
FP/BR/Others/33210/2018
|
Diversion of 0.02212 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Muzaffarpu-Pusa-Samastipur Road district of Samastipur in Bihar
|
Others
|
UMESH RAM
|
0.02212
|
IN-PRINCIPLE
|
03-Dec-2020
|
|
|
|
|
|
No
|
|
22
|
Bihar
|
FP/BR/ROAD/47172/2020
|
FP/BR/ROAD/47172/2020
|
Road Construction Department Govt of Bihar has decided to Construction of 3x14.00 M RCC High Level Bridge over Dhathuria River in 23rd KM of Sharawan-Bakshila Road in the District of Jamui for the yea
|
Road
|
ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, JAMUI
|
0.48
|
IN-PRINCIPLE
|
20-Oct-2021
|
|
|
|
|
|
No
|
|
23
|
Bihar
|
FP/BR/Others/31458/2018
|
FP/BR/Others/31458/2018
|
The proposal for establishment of retail out-let (Petrol Pump) dealership of M/S BPCL located on the land procured by lease by the applicant on the survey no. 164, khasra no. 323, Raxaul-Ghorasahan Road. The road side land 0.0105 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply p
|
Others
|
KUMARI SHILA DIXIT
|
0.0105
|
IN-PRINCIPLE
|
31-May-2019
|
|
|
|
|
|
No
|
|
24
|
Bihar
|
FP/BR/Others/32677/2018
|
FP/BR/Others/32677/2018
|
The proposal for establishment of retail out-let dealership of M/S HPCL
|
Others
|
SIDHARTH SINGH
|
0.006
|
IN-PRINCIPLE
|
05-Mar-2020
|
|
|
|
|
|
No
|
|
25
|
Bihar
|
FP/BR/Others/117040/2020
|
FP/BR/Others/117040/2020
|
Diversion of 0.010875 ha of forest land for construction of approach road for opening retail outlet of BPCL on Sherghati-Cherki Road in Gaya district of Bihar.
|
Others
|
ZUBAIR ALAM KHAN
|
0.01088
|
IN-PRINCIPLE
|
19-Jul-2021
|
|
|
|
|
|
No
|
|
26
|
Bihar
|
FP/BR/Others/39867/2019
|
FP/BR/OTHERS/39867/2019
|
Diversion of 0.0252 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57 East-West-Expy in Madhubani district of Bihar.
|
Others
|
MANOJ KUMAR SINGH MADHUBANI
|
0.0252
|
IN-PRINCIPLE
|
15-Nov-2019
|
|
|
|
|
|
No
|
|
27
|
Bihar
|
FP/BR/Pipeline/154538/2022
|
FP/BR/Pipeline/154538/2022
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
0.42541
|
IN-PRINCIPLE
|
21-Oct-2024
|
|
|
|
|
|
No
|
|
28
|
Bihar
|
FP/BR/Pipeline/154538/2022
|
FP/BR/Pipeline/154538/2022
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
0.42541
|
IN-PRINCIPLE
|
21-Oct-2024
|
|
|
|
|
|
No
|
|
29
|
Bihar
|
FP/BR/ROAD/157384/2022
|
FP/BR/ROAD/157384/2022
|
Construction of 4/6 Laning of Arrah-Sasaram-Patna road section of NH-119A from Km 40+450 to Km 84+300 under Bharatmala Pariyojana (Lot-7/Package-2) in the State of Bihar (Package-II)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU PATNA
|
22.716
|
IN-PRINCIPLE
|
27-Aug-2025
|
|
|
|
|
|
No
|
|
30
|
Bihar
|
FP/BR/Others/52523/2020
|
FP/BR/Others/52523/2020
|
Diversion of 0.01875 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-81 Road in Rohtas district of Bihar.
|
Others
|
RAGHU CHOUDHARY
|
0.01875
|
IN-PRINCIPLE
|
24-Aug-2023
|
|
|
|
|
|
No
|
|
31
|
Bihar
|
FP/BR/ROAD/39042/2019
|
FP/BR/ROAD/39042/2019
|
Construction of HL RCC Bridge at KM 40th of NH – 333 in the state of Bihar under Action Plan 2017-18.
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
0.372
|
IN-PRINCIPLE
|
11-Apr-2020
|
|
|
|
|
|
No
|
|
32
|
Bihar
|
FP/BR/Others/40266/2019
|
FP/BR/Others/40266/2019
|
Diversion of 0.012 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of SH-88 in Samastipur district of Bihar.
|
Others
|
SATYAM SONI AND ANIL KUMAR
|
0.012
|
IN-PRINCIPLE
|
13-Sep-2019
|
|
|
|
|
|
No
|
|
33
|
Bihar
|
FP/BR/Others/22898/2016
|
FP/BR/Others/22898/2016
|
BPCL Retail Outlet The road side land 0.0123 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc.
|
Others
|
RAVI KANT
|
0.0123
|
IN-PRINCIPLE
|
10-Jan-2017
|
|
|
|
|
|
No
|
|
34
|
Bihar
|
FP/BR/Others/40869/2019
|
FP/BR/Others/40869/2019
|
Development of Papharni Lake, Akash Ganga and Mandar Hill Top under Mandar Hill and Ang Pradesh Circuit Under Swedish Darshan Scheme at Banka
|
Others
|
DEPARTMENT OF TOURISM GOVT OF BIHAR
|
0.72
|
IN-PRINCIPLE
|
30-May-2020
|
|
|
|
|
|
No
|
|
35
|
Bihar
|
FP/BR/ROAD/46901/2020
|
FP/BR/ROAD/46901/2020
|
Improvement Two Laning with paved shoulder of stretch from Bikramganj – Dawath – Maliyabagh – Nawanagar – Dumraon of NH– 120 (Ch. 201.665 to Ch 245.665) in the State of Bihar. (Excluded Area Dawath (C
|
Road
|
EXECUTIVE ENGINEER N. H. DIVISION GAYA
|
41.01
|
IN-PRINCIPLE
|
28-Apr-2023
|
|
|
|
|
|
No
|
|
36
|
Bihar
|
FP/BR/ROAD/46901/2020
|
FP/BR/ROAD/46901/2020
|
Improvement Two Laning with paved shoulder of stretch from Bikramganj – Dawath – Maliyabagh – Nawanagar – Dumraon of NH– 120 (Ch. 201.665 to Ch 245.665) in the State of Bihar. (Excluded Area Dawath (C
|
Road
|
EXECUTIVE ENGINEER N. H. DIVISION GAYA
|
41.01
|
IN-PRINCIPLE
|
28-Apr-2023
|
|
|
|
|
|
No
|
|
37
|
Bihar
|
FP/BR/Others/120998/2021
|
FP/BR/Others/120998/2021
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
MADHULATA KUMARI
|
0.015
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
|
38
|
Bihar
|
FP/BR/Others/41567/2019
|
FP/BR/Others/41567/2019
|
Diversion of 0.02355 ha of forest land for construction of approach road for opening retail outlet of Kisan Seva Kendra IOCL on side of Shukulawa Khurd on Saran Nahar Main Canal Road in Gopalganj distr
|
Others
|
SUBHASH SINGH
|
0.0236
|
IN-PRINCIPLE
|
15-Apr-2020
|
|
|
|
|
|
No
|
|
39
|
Bihar
|
FP/BR/ROAD/141547/2021
|
FP/BR/ROAD/141547/2021
|
Widening and Strengthening of Road in length in 3.784 KM Which is a connecting stretch length of SH-50 to NH28 at Musarigharari
|
Road
|
SRI ASHOK KUMAR
|
2.838
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
|
40
|
Bihar
|
FP/BR/Others/44894/2020
|
FP/BR/Others/44894/2020
|
Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-57 Road in Supaul district of Bihar.
|
Others
|
BALESHWAR PASWAN
|
0.0285
|
IN-PRINCIPLE
|
30-Sep-2020
|
|
|
|
|
|
No
|
|
41
|
Bihar
|
FP/BR/ROAD/32998/2018
|
FP/BR/ROAD/32998/2018
|
We are seeking prior approval to cut the trees under Purnia Forest Division for the Road (NH-131A), having CH: Km 48+603 to Km 49+817
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION PURNEA
|
0.382
|
IN-PRINCIPLE
|
12-Oct-2018
|
|
|
|
|
|
No
|
|
42
|
Bihar
|
FP/BR/Others/27141/2017
|
FP/BR/OTHERS/27141/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-107, Malichauk-Sonwarsa Road in Saharsa district of Bihar.
|
Others
|
AMARJEET KUMAR BPCL
|
0.0165
|
IN-PRINCIPLE
|
30-May-2018
|
|
|
|
|
|
No
|
|
43
|
Bihar
|
FP/BR/Approach/155353/2022
|
FP/BR/Approach/155353/2022
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of Hindustan Biodiesel Pvt. Ltd. on SiwanMairwanGuthani Road in Siwan district of Bihar.
|
Approach Access
|
SHIKHA SHUKLA
|
0.01275
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
|
44
|
Bihar
|
FP/BR/Others/37331/2018
|
FP/BR/OTHERS/37331/2018
|
Diversion of 0.015657 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Warisnagar-Daulatpur-Rosara Road in Samastipur district of Bihar.
|
Others
|
RAMESH RAM IOCL
|
0.015657
|
IN-PRINCIPLE
|
04-Apr-2019
|
|
|
|
|
|
No
|
|
45
|
Bihar
|
FP/BR/Others/40624/2019
|
FP/BR/Others/40624/2019
|
Forest land is required for making a new Drain from Donar Gumati to Tinhipul.
|
Others
|
EXECUTIVE ENGINEER BUIDCO DARBHANGA
|
14.85
|
IN-PRINCIPLE
|
22-May-2020
|
|
|
|
|
|
No
|
|
46
|
Bihar
|
FP/BR/ROAD/125806/2021
|
FP/BR/ROAD/125806/2021
|
Regarding Submission of forest clearance Up-gradation, Widening and Strengthening work for 2-lane with Paved Shoulder of NH-80 alignment from 132.895 to 190.150 KM Bhagalpur-Khalgaon-Mirzachowki Secti
|
Road
|
EE BHAGALPUR NH
|
41.559
|
IN-PRINCIPLE
|
22-Aug-2022
|
|
|
|
|
|
No
|
|
47
|
Bihar
|
FP/BR/Others/42754/2019
|
FP/BR/Others/42754/2019
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-74 in Vaishali district of Bihar.
|
Others
|
ANAND KUMAR
|
0.01275
|
IN-PRINCIPLE
|
29-Jun-2020
|
|
|
|
|
|
No
|
|
48
|
Bihar
|
FP/BR/Others/49647/2020
|
FP/BR/OTHERS/49647/2020
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-47 Road in Gopalganj district of Bihar.
|
Others
|
KRISHNA MANJHI
|
0.01275
|
IN-PRINCIPLE
|
28-Jul-2021
|
|
|
|
|
|
No
|
|
49
|
Bihar
|
FP/BR/Others/8755/2014
|
FP/BR/Others/8755/2014
|
Stadium construction at sapneri village
|
Others
|
BDO KHIZARSARAI
|
0.48564
|
IN-PRINCIPLE
|
23-Dec-2014
|
|
|
|
|
|
No
|
|
50
|
Bihar
|
FP/BR/Approach/157585/2022
|
FP/BR/Approach/157585/2022
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-77 Road in Araria district of Bihar.
|
Approach Access
|
CHHOTU KUMAR
|
0.018
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
No
|
|