Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Bihar
|
FP/BR/Approach/157585/2022
|
FP/BR/Approach/157585/2022
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-77 Road in Araria district of Bihar.
|
Approach Access
|
CHHOTU KUMAR
|
0.018
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
No
|
2
|
Bihar
|
FP/BR/Others/27141/2017
|
FP/BR/OTHERS/27141/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-107, Malichauk-Sonwarsa Road in Saharsa district of Bihar.
|
Others
|
AMARJEET KUMAR BPCL
|
0.0165
|
IN-PRINCIPLE
|
30-May-2018
|
|
|
|
|
|
No
|
3
|
Bihar
|
FP/BR/Others/36089/2018
|
FP/BR/OTHERS/36089/2018
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Dalsinghsarai-Samastipur Road in Samastipur district of Bihar.
|
Others
|
SUPRIYA
|
0.0075
|
IN-PRINCIPLE
|
03-Jun-2019
|
|
|
|
|
|
No
|
4
|
Bihar
|
FP/BR/Others/46317/2020
|
FP/BR/Others/46317/2020
|
Diversion of 0.021 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of Koilwar-Babura in Bhojpur district of Bihar.
|
Others
|
RAJESH KUMAR SINGH
|
0.021
|
IN-PRINCIPLE
|
14-Sep-2020
|
|
|
|
|
|
No
|
5
|
Bihar
|
FP/BR/Others/51189/2020
|
FP/BR/Others/51189/2020/4765
|
Diversion of 0.006 ha of forest land for construction of approach road for opening retail outlet for Bio-diesel of Goal Gas Pvt. Ltd. on SH-55A Gharghra-Bakhari Road in Begusarai district of Bihar.
|
Others
|
PRVEEN KUMAR
|
0.006
|
IN-PRINCIPLE
|
26-Jul-2021
|
|
|
|
|
|
No
|
6
|
Bihar
|
FP/BR/RAIL/84637/2020
|
FP/BR/RAIL/84637/2020
|
Construction of New Broad Gauge Railway Line from Jatdumri to Daniawan (23.8 Km)
|
Railway
|
RAIL VIKAS NIGAM LIMITED PATNA
|
0.2
|
IN-PRINCIPLE
|
14-Mar-2022
|
|
|
|
|
|
No
|
7
|
Bihar
|
FP/BR/ROAD/154991/2022
|
FP/BR/ROAD/154991/2022
|
Umagaon Kaluahi Saharghat Rahika Bideshwar Bheja
|
Road
|
National Highways Authority of India
|
37.507
|
IN-PRINCIPLE
|
20-May-2025
|
|
|
|
|
|
No
|
8
|
Bihar
|
FP/BR/ROAD/157210/2022
|
FP/BR/ROAD/157210/2022
|
Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction
|
Road
|
PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR
|
0.1799
|
IN-PRINCIPLE
|
22-Aug-2023
|
|
|
|
|
|
No
|
9
|
Bihar
|
FP/BR/ROAD/157408/2022
|
FP/BR/ROAD/157408/2022
|
Construction of 4/6 Laning of Arrah-Sasaram-Patna road section of NH-119A from Km 00+000 to Km 34+800 (Ring Road) under Bharatmala Pariyojana (Lot-7/Package-2) in the State of Bihar (Package-III)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU PATNA
|
1.964
|
IN-PRINCIPLE
|
26-Jan-2025
|
|
|
|
|
|
No
|
10
|
Bihar
|
FP/BR/Approach/149032/2021
|
FP/BR/APPROACH/149032/2021
|
Diversion of 0.01455 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-70 Road in Gaya district of Bihar.
|
Approach Access
|
ANAND KUMAR
|
0.01762
|
IN-PRINCIPLE
|
27-Oct-2022
|
|
|
|
|
|
No
|
11
|
Bihar
|
FP/BR/Others/39867/2019
|
FP/BR/OTHERS/39867/2019
|
Diversion of 0.0252 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57 East-West-Expy in Madhubani district of Bihar.
|
Others
|
MANOJ KUMAR SINGH MADHUBANI
|
0.0252
|
IN-PRINCIPLE
|
15-Nov-2019
|
|
|
|
|
|
No
|
12
|
Bihar
|
FP/BR/Others/43046/2019
|
FP/BR/Others/43046/2019
|
Diversion of 0.0225 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of NH-57 in Madhubani district of Bihar.
|
Others
|
JOHNEY EMMANUEL TIRKEY
|
0.0225
|
IN-PRINCIPLE
|
15-Apr-2020
|
|
|
|
|
|
No
|
13
|
Bihar
|
FP/BR/Approach/50183/2020
|
FP/BR/Approach/50183/2020
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd.
|
Approach Access
|
REEMA KUMARI
|
0.0255
|
IN-PRINCIPLE
|
24-Feb-2021
|
|
|
|
|
|
No
|
14
|
Bihar
|
FP/BR/Others/120998/2021
|
FP/BR/Others/120998/2021
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
MADHULATA KUMARI
|
0.015
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
15
|
Bihar
|
FP/BR/RAIL/21907/2016
|
FP/BR/Rail/21907/2016
|
road over bridge on NH-101
|
Railway
|
NORTH EASTERN RAILWAY
|
1.361
|
IN-PRINCIPLE
|
06-Mar-2019
|
|
|
|
|
|
No
|
16
|
Bihar
|
FP/BR/ROAD/30705/2017
|
FP/BR/ROAD/30705/2017
|
We are seeking prior approval to cut the trees under forest Division saran (Chapra) of the Sonepur-Darihara Road having chainage 0.00-21.00 KM
|
Road
|
ROAD CONSTRUCTION DEPARTMENT
|
44.16
|
IN-PRINCIPLE
|
26-Sep-2018
|
|
|
|
|
|
No
|
17
|
Bihar
|
FP/BR/Approach/149796/2021
|
FP/BR/Approach/149796/2021
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of Reliance Jio bp Mobility ltd. on SH-15 Tehsil-Nasriganj Road in Rohtas district of Bihar.
|
Approach Access
|
VIKALP
|
0.0195
|
IN-PRINCIPLE
|
14-Oct-2024
|
|
|
|
|
|
No
|
18
|
Bihar
|
FP/BR/Approach/152074/2022
|
FP/BR/Approach/152074/2021
|
Diversion of 0.045 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-105 (Old) 527B (New) Darbhanga-Jai Nagar Road in Darbhanga district of Bihar.
|
Approach Access
|
SUDHIR KUMAR
|
0.045
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
19
|
Bihar
|
FP/BR/Others/34650/2018
|
FP/BR/OTHERS/34650/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Samastipur-Sarairanjan-Patori Road in Samastipur district of Bihar.
|
Others
|
RAJENDRA DAS
|
0.0105
|
IN-PRINCIPLE
|
19-Jul-2019
|
|
|
|
|
|
No
|
20
|
Bihar
|
FP/BR/ROAD/29990/2017
|
FP/BR/ROAD/29990/2017
|
Widening to intermediate lane & Strengthening cum output & performance based road assets maintenance work of road from Lachur to Jamui-Garhi-Rupawel-Kawakol-Road (SH-82) at Rupawel via Kund Ghat, Janmasthali
|
Road
|
ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, JAMUI
|
5.795
|
IN-PRINCIPLE
|
06-Dec-2018
|
|
|
|
|
|
No
|
21
|
Bihar
|
FP/BR/Approach/156522/2022
|
FP/BR/Approach/156522/2022
|
Diversion of 0.020625 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bachhota-Alauli M.D.R. Road in Khagaria district of Bihar.
|
Approach Access
|
KHUSHI KUMARI
|
0.02063
|
IN-PRINCIPLE
|
06-Mar-2023
|
|
|
|
|
|
No
|
22
|
Bihar
|
FP/BR/Others/42268/2019
|
FP/BR/Others/42268/2019
|
The Tourism Department , Govt. of Bihar has been promoting tourist for ritual worship in the Maa Mundeshwari Devi temple situated at the top of Mundeshwari Hill in Bhagwanpur Block under Kaimur Distri
|
Others
|
BIHAR RAJYA PUL NIRMAN NIGAM LTD WORKS DIVISION ARA
|
1.3094
|
IN-PRINCIPLE
|
30-Aug-2024
|
|
|
|
|
|
No
|
23
|
Bihar
|
FP/BR/Others/45405/2020
|
FP/BR/Others/45405/2020
|
STORM WATER DRAINAGE PROJECT
|
Others
|
EE BUIDCO SUPAUL
|
0.09
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
24
|
Bihar
|
FP/BR/Others/47349/2020
|
FP/BR/Others/47349/2020
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Mirganj-Bhagipatti-Samaur Road in Gopalganj district of Bihar.
|
Others
|
ANJU DEVI
|
0.0075
|
IN-PRINCIPLE
|
14-Jun-2021
|
|
|
|
|
|
No
|
25
|
Bihar
|
FP/BR/ROAD/34306/2018
|
FP/JH/Road/34306/2018
|
Construction of HL RCC Minor Bridge in KM 24 of NH 333(Span 2x21) in the State of Bihar
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
0.2165
|
IN-PRINCIPLE
|
05-Aug-2019
|
|
|
|
|
|
No
|
26
|
Bihar
|
FP/BR/WATER/152037/2022
|
FP/BR/WATER/152037/2022
|
Ganga Water Lift Project For Drinking Water
|
Drinking Water
|
EXECUTIVE ENGINEER TILAIYA CANAL DIVISION WAZIRGANJ GAYA
|
2.1109
|
IN-PRINCIPLE
|
21-Aug-2023
|
|
|
|
|
|
No
|
27
|
Bihar
|
FP/BR/Approach/46497/2020
|
FP/BR/Approach/46497/2020
|
The proposal for establishment of retail out let dealership on M/S Bharat Petroliam Corporation Ltd. Location At Khiddi Rajoun Banka Within 1.3 KMS from Rajawarmore to Khaira More on RHS on SH-19. The
|
Approach Access
|
SRI ROHIT KUMAR SINGH
|
0.02424
|
IN-PRINCIPLE
|
20-Jan-2021
|
|
|
|
|
|
No
|
28
|
Bihar
|
FP/BR/Others/34207/2018
|
FP/BR/OTHERS/34207/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of Guthani-Raghunathpur Road district of Siwan in Bihar
|
Others
|
ARCHANA KUMARI SINGH
|
0.0105
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
29
|
Bihar
|
FP/BR/Others/45108/2020
|
FP/BR/Others/45108/2020
|
Diversion of 0.011775 ha of forest land for construction of approach road for opening retail outlet of BPCL on Lalganj-Fakuli Road in Vaishali district of Bihar.
|
Others
|
SULEKHA DEVI
|
0.01178
|
IN-PRINCIPLE
|
28-Aug-2020
|
|
|
|
|
|
No
|
30
|
Bihar
|
FP/BR/Others/8755/2014
|
FP/BR/Others/8755/2014
|
Stadium construction at sapneri village
|
Others
|
BDO KHIZARSARAI
|
0.48564
|
IN-PRINCIPLE
|
23-Dec-2014
|
|
|
|
|
|
No
|
31
|
Bihar
|
FP/BR/ROAD/144807/2021
|
FP/BR/ROAD/144807/2021
|
Up-gradation & Widening to Two Lane with Paved shoulder from KM. 0.000 to KM. 30.660 of Existing National Highway NH-319A (Mohania– Ramgarh- Chausa- Buxar) in Kaimur district, in the State of Bihar.
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION AURANGABAD BIHAR
|
17.9123
|
IN-PRINCIPLE
|
13-Jun-2023
|
|
|
|
|
|
No
|
32
|
Bihar
|
FP/BR/ROAD/21782/2016
|
FP/BR/ROAD/21782/2016
|
Forest Diversion Proposal of Diversion of 1.47 ha PF Land for construction of Flyover & Vehicular Underpass at Patna-Gaya-Dobhi Section of NH-83 0.00-127.00 KM
|
Road
|
PROJECT DIRECTOR NHAI PIU GAYA
|
1.47
|
IN-PRINCIPLE
|
18-Sep-2017
|
|
|
|
|
|
No
|
33
|
Bihar
|
FP/BR/ROAD/39045/2019
|
FP/BR/ROAD/39045/2019
|
Construction of HL RCC Bridge at KM 2nd, KM 14th, KM 40th & KM 43th of NH – 333 in the state of Bihar under Action Plan 2017-18.
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
1.206
|
IN-PRINCIPLE
|
11-Apr-2020
|
|
|
|
|
|
No
|
34
|
Bihar
|
FP/BR/Canal/36287/2018
|
FP/BR/Canal/36287/2018
|
Dhadhar Diversion Project
|
Canal
|
EXECUTIVE ENGINEER TILAIYA CANAL DIVISION WAZIRGANJ GAYA
|
0.7692
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
No
|
35
|
Bihar
|
FP/BR/Others/32454/2018
|
FP/BR/OTHERS/32454/2018
|
Diversion of 0.03 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of Wazzirganj-Fatehpur Road in Gaya district of Bihar.
|
Others
|
AJAY KUMAR DINKAR
|
0.03
|
IN-PRINCIPLE
|
17-Jun-2019
|
|
|
|
|
|
No
|
36
|
Bihar
|
FP/BR/Others/36334/2018
|
FP/BR/Others/36334/2018
|
Diversion of 0.008145 ha of forest land for construction of approach road for opening retail outlet of BPCL on the side of Dehri-Rajpur Road in Rohtas district of Bihar.
|
Others
|
ALKA SINGH
|
0.008145
|
IN-PRINCIPLE
|
15-Sep-2020
|
|
|
|
|
|
No
|
37
|
Bihar
|
FP/BR/Others/40869/2019
|
FP/BR/Others/40869/2019
|
Development of Papharni Lake, Akash Ganga and Mandar Hill Top under Mandar Hill and Ang Pradesh Circuit Under Swedish Darshan Scheme at Banka
|
Others
|
DEPARTMENT OF TOURISM GOVT OF BIHAR
|
0.72
|
IN-PRINCIPLE
|
30-May-2020
|
|
|
|
|
|
No
|
38
|
Bihar
|
FP/BR/ROAD/149739/2021
|
FP/BR/ROAD/149739/2021
|
Consultancy Services for Preparation of DPR for Two laning with paved shoulder of Ghazipur – Ballia - UP/Bihar Greenfield section from Km. 0.000 to 115.200 of NH-19 including Buxar Spur (Length:17.800
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AZAMGARH
|
5.66
|
IN-PRINCIPLE
|
11-Jun-2024
|
|
|
|
|
|
Yes
Proposal No.: IA/UP/NCP/229313/2021
EC File No.: 10/43/2021-IA.III
Proposal Status: TOR GRANTED
|
39
|
Bihar
|
FP/BR/ROAD/26357/2017
|
FP/BR/ROAD/26357/2017
|
Proposed ROB at Railway Km. 591.756 (591/24-26 Tp) Between Railway Station Ara - Jamira Halt In Lieu Of L.C No - 48a/3t And At Road Ch: 119.00 From Sasaram To Patna Of National Highway-30
|
Road
|
NH DIVISION GULZARBAGH
|
1.828
|
IN-PRINCIPLE
|
18-Jan-2018
|
|
|
|
|
|
No
|
40
|
Bihar
|
FP/BR/Approach/156110/2022
|
FP/BR/Approach/156110/2022
|
Diversion of 0.03975 ha of forest land for construction of approach road for opening retail outlet of HPCL on NH-19 Chhapra-Majhi Road in Saran district of Bihar.
|
Approach Access
|
RANA SINGH
|
0.03975
|
IN-PRINCIPLE
|
13-Jul-2023
|
|
|
|
|
|
No
|
41
|
Bihar
|
FP/BR/Others/26844/2017
|
FP/BR/Others/26844/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on N.H. - 107, Baijnathpur-Madhepura Road in Saharsa district of Bihar.
|
Others
|
TUNAM KUMARI
|
0.0165
|
IN-PRINCIPLE
|
18-May-2018
|
|
|
|
|
|
No
|
42
|
Bihar
|
FP/BR/Others/32677/2018
|
FP/BR/Others/32677/2018
|
The proposal for establishment of retail out-let dealership of M/S HPCL
|
Others
|
SIDHARTH SINGH
|
0.006
|
IN-PRINCIPLE
|
05-Mar-2020
|
|
|
|
|
|
No
|
43
|
Bihar
|
FP/BR/Others/42754/2019
|
FP/BR/Others/42754/2019
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-74 in Vaishali district of Bihar.
|
Others
|
ANAND KUMAR
|
0.01275
|
IN-PRINCIPLE
|
29-Jun-2020
|
|
|
|
|
|
No
|
44
|
Bihar
|
FP/BR/Others/44106/2020
|
FP/BR/Others/44106/2020
|
Diversion of 0.0102 ha of forest land for construction of approach road for opening retail outlet of Citizencare Biofuel Power Projects Pvt. Ltd. on NH-103 Road in Samastipur district of Bihar.
|
Others
|
AJEET KUMAR JHA
|
0.0102
|
IN-PRINCIPLE
|
15-Jun-2020
|
|
|
|
|
|
No
|
45
|
Bihar
|
FP/BR/Others/44475/2020
|
FP/BR/Others/44475/2020
|
Diversion of 0.00765 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-93 Road in Samastipur district of Bihar.
|
Others
|
URMILA DEVI
|
0.00765
|
IN-PRINCIPLE
|
15-Jun-2020
|
|
|
|
|
|
No
|
46
|
Bihar
|
FP/BR/Others/44894/2020
|
FP/BR/Others/44894/2020
|
Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-57 Road in Supaul district of Bihar.
|
Others
|
BALESHWAR PASWAN
|
0.0285
|
IN-PRINCIPLE
|
30-Sep-2020
|
|
|
|
|
|
No
|
47
|
Bihar
|
FP/BR/Others/30020/2017
|
FP/BR/OTHERS/30020/2017
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bakhadda Chowk on Malipur-Daulatpur Road in Begusarai district of Bihar.
|
Others
|
INDIAN OIL CORP LTD
|
0.0075
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
48
|
Bihar
|
FP/BR/Others/44387/2020
|
FP/BR/Others/44387/2020
|
Diversion of 0.0175 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-69 Road in Gaya district of Bihar.
|
Others
|
MAMTA KUMARI
|
0.0175
|
IN-PRINCIPLE
|
03-Nov-2020
|
|
|
|
|
|
No
|
49
|
Bihar
|
FP/BR/Others/50602/2020
|
FP/BR/Others/50602/2020
|
Diversion of 0.01575 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
DEEPAK KUMAR BHUIYAN
|
0.01575
|
IN-PRINCIPLE
|
23-Jun-2022
|
|
|
|
|
|
No
|
50
|
Bihar
|
FP/BR/Pipeline/154538/2022
|
FP/BR/Pipeline/154538/2022
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
0.42541
|
IN-PRINCIPLE
|
21-Oct-2024
|
|
|
|
|
|
No
|
|