| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Bihar
|
FP/BR/Approach/157585/2022
|
FP/BR/Approach/157585/2022
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-77 Road in Araria district of Bihar.
|
Approach Access
|
CHHOTU KUMAR
|
0.018
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
No
|
|
2
|
Bihar
|
FP/BR/Others/27141/2017
|
FP/BR/OTHERS/27141/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-107, Malichauk-Sonwarsa Road in Saharsa district of Bihar.
|
Others
|
AMARJEET KUMAR BPCL
|
0.0165
|
IN-PRINCIPLE
|
30-May-2018
|
|
|
|
|
|
No
|
|
3
|
Bihar
|
FP/BR/Others/36089/2018
|
FP/BR/OTHERS/36089/2018
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Dalsinghsarai-Samastipur Road in Samastipur district of Bihar.
|
Others
|
SUPRIYA
|
0.0075
|
IN-PRINCIPLE
|
03-Jun-2019
|
|
|
|
|
|
No
|
|
4
|
Bihar
|
FP/BR/Others/46317/2020
|
FP/BR/Others/46317/2020
|
Diversion of 0.021 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of Koilwar-Babura in Bhojpur district of Bihar.
|
Others
|
RAJESH KUMAR SINGH
|
0.021
|
IN-PRINCIPLE
|
14-Sep-2020
|
|
|
|
|
|
No
|
|
5
|
Bihar
|
FP/BR/Others/51189/2020
|
FP/BR/Others/51189/2020/4765
|
Diversion of 0.006 ha of forest land for construction of approach road for opening retail outlet for Bio-diesel of Goal Gas Pvt. Ltd. on SH-55A Gharghra-Bakhari Road in Begusarai district of Bihar.
|
Others
|
PRVEEN KUMAR
|
0.006
|
IN-PRINCIPLE
|
26-Jul-2021
|
|
|
|
|
|
No
|
|
6
|
Bihar
|
FP/BR/RAIL/84637/2020
|
FP/BR/RAIL/84637/2020
|
Construction of New Broad Gauge Railway Line from Jatdumri to Daniawan (23.8 Km)
|
Railway
|
RAIL VIKAS NIGAM LIMITED PATNA
|
0.2
|
IN-PRINCIPLE
|
14-Mar-2022
|
|
|
|
|
|
No
|
|
7
|
Bihar
|
FP/BR/ROAD/154991/2022
|
FP/BR/ROAD/154991/2022
|
Umagaon Kaluahi Saharghat Rahika Bideshwar Bheja
|
Road
|
National Highways Authority of India
|
37.507
|
IN-PRINCIPLE
|
20-May-2025
|
|
|
|
|
|
No
|
|
8
|
Bihar
|
FP/BR/ROAD/157408/2022
|
FP/BR/ROAD/157408/2022
|
Construction of 4/6 Laning of Arrah-Sasaram-Patna road section of NH-119A from Km 00+000 to Km 34+800 (Ring Road) under Bharatmala Pariyojana (Lot-7/Package-2) in the State of Bihar (Package-III)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU PATNA
|
1.964
|
IN-PRINCIPLE
|
26-Jan-2025
|
|
|
|
|
|
No
|
|
9
|
Bihar
|
FP/BR/Approach/149032/2021
|
FP/BR/APPROACH/149032/2021
|
Diversion of 0.01455 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-70 Road in Gaya district of Bihar.
|
Approach Access
|
ANAND KUMAR
|
0.01762
|
IN-PRINCIPLE
|
27-Oct-2022
|
|
|
|
|
|
No
|
|
10
|
Bihar
|
FP/BR/Others/39867/2019
|
FP/BR/OTHERS/39867/2019
|
Diversion of 0.0252 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57 East-West-Expy in Madhubani district of Bihar.
|
Others
|
MANOJ KUMAR SINGH MADHUBANI
|
0.0252
|
IN-PRINCIPLE
|
15-Nov-2019
|
|
|
|
|
|
No
|
|
11
|
Bihar
|
FP/BR/Others/43046/2019
|
FP/BR/Others/43046/2019
|
Diversion of 0.0225 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of NH-57 in Madhubani district of Bihar.
|
Others
|
JOHNEY EMMANUEL TIRKEY
|
0.0225
|
IN-PRINCIPLE
|
15-Apr-2020
|
|
|
|
|
|
No
|
|
12
|
Bihar
|
FP/BR/Approach/50183/2020
|
FP/BR/Approach/50183/2020
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd.
|
Approach Access
|
REEMA KUMARI
|
0.0255
|
IN-PRINCIPLE
|
24-Feb-2021
|
|
|
|
|
|
No
|
|
13
|
Bihar
|
FP/BR/Others/120998/2021
|
FP/BR/Others/120998/2021
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
MADHULATA KUMARI
|
0.015
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
|
14
|
Bihar
|
FP/BR/RAIL/21907/2016
|
FP/BR/Rail/21907/2016
|
road over bridge on NH-101
|
Railway
|
NORTH EASTERN RAILWAY
|
1.361
|
IN-PRINCIPLE
|
06-Mar-2019
|
|
|
|
|
|
No
|
|
15
|
Bihar
|
FP/BR/ROAD/30705/2017
|
FP/BR/ROAD/30705/2017
|
We are seeking prior approval to cut the trees under forest Division saran (Chapra) of the Sonepur-Darihara Road having chainage 0.00-21.00 KM
|
Road
|
ROAD CONSTRUCTION DEPARTMENT
|
44.16
|
IN-PRINCIPLE
|
26-Sep-2018
|
|
|
|
|
|
No
|
|
16
|
Bihar
|
FP/BR/Approach/149796/2021
|
FP/BR/Approach/149796/2021
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of Reliance Jio bp Mobility ltd. on SH-15 Tehsil-Nasriganj Road in Rohtas district of Bihar.
|
Approach Access
|
VIKALP
|
0.0195
|
IN-PRINCIPLE
|
14-Oct-2024
|
|
|
|
|
|
No
|
|
17
|
Bihar
|
FP/BR/Approach/150479/2021
|
FP/BR/Approach/150479/2021
|
Diversion of 0.01815 ha of forest land for construction of approach road for opening retail outlet of BPCL on Sarafra-Siwan Road in Siwan district of Bihar.
|
Approach Access
|
VINOD KUMAR YADAV
|
0.01815
|
IN-PRINCIPLE
|
08-Jun-2026
|
|
|
|
|
|
No
|
|
18
|
Bihar
|
FP/BR/Approach/152074/2022
|
FP/BR/Approach/152074/2021
|
Diversion of 0.045 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-105 (Old) 527B (New) Darbhanga-Jai Nagar Road in Darbhanga district of Bihar.
|
Approach Access
|
SUDHIR KUMAR
|
0.045
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
|
19
|
Bihar
|
FP/BR/Others/34650/2018
|
FP/BR/OTHERS/34650/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Samastipur-Sarairanjan-Patori Road in Samastipur district of Bihar.
|
Others
|
RAJENDRA DAS
|
0.0105
|
IN-PRINCIPLE
|
19-Jul-2019
|
|
|
|
|
|
No
|
|
20
|
Bihar
|
FP/BR/ROAD/29990/2017
|
FP/BR/ROAD/29990/2017
|
Widening to intermediate lane & Strengthening cum output & performance based road assets maintenance work of road from Lachur to Jamui-Garhi-Rupawel-Kawakol-Road (SH-82) at Rupawel via Kund Ghat, Janmasthali
|
Road
|
ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, JAMUI
|
5.795
|
IN-PRINCIPLE
|
06-Dec-2018
|
|
|
|
|
|
No
|
|
21
|
Bihar
|
FP/BR/Others/45405/2020
|
FP/BR/Others/45405/2020
|
STORM WATER DRAINAGE PROJECT
|
Others
|
EE BUIDCO SUPAUL
|
0.09
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
|
22
|
Bihar
|
FP/BR/Others/47349/2020
|
FP/BR/Others/47349/2020
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Mirganj-Bhagipatti-Samaur Road in Gopalganj district of Bihar.
|
Others
|
ANJU DEVI
|
0.0075
|
IN-PRINCIPLE
|
14-Jun-2021
|
|
|
|
|
|
No
|
|
23
|
Bihar
|
FP/BR/ROAD/34306/2018
|
FP/JH/Road/34306/2018
|
Construction of HL RCC Minor Bridge in KM 24 of NH 333(Span 2x21) in the State of Bihar
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
0.2165
|
IN-PRINCIPLE
|
05-Aug-2019
|
|
|
|
|
|
No
|
|
24
|
Bihar
|
FP/BR/WATER/152037/2022
|
FP/BR/WATER/152037/2022
|
Ganga Water Lift Project For Drinking Water
|
Drinking Water
|
EXECUTIVE ENGINEER TILAIYA CANAL DIVISION WAZIRGANJ GAYA
|
2.1109
|
IN-PRINCIPLE
|
21-Aug-2023
|
|
|
|
|
|
No
|
|
25
|
Bihar
|
FP/BR/Approach/46497/2020
|
FP/BR/Approach/46497/2020
|
The proposal for establishment of retail out let dealership on M/S Bharat Petroliam Corporation Ltd. Location At Khiddi Rajoun Banka Within 1.3 KMS from Rajawarmore to Khaira More on RHS on SH-19. The
|
Approach Access
|
SRI ROHIT KUMAR SINGH
|
0.02424
|
IN-PRINCIPLE
|
20-Jan-2021
|
|
|
|
|
|
No
|
|
26
|
Bihar
|
FP/BR/Others/117859/2020
|
FP/BR/Others/117859/2020
|
Diversion of 0.024 ha of forest land for construction of approach road for opening retail outlet of HPCL on Chater Chowk-Santosh Bridge Road in Khagaria district of Bihar.
|
Others
|
RAJESH KUMAR
|
0.024
|
IN-PRINCIPLE
|
25-Mar-2026
|
|
|
|
|
|
No
|
|
27
|
Bihar
|
FP/BR/Others/34207/2018
|
FP/BR/OTHERS/34207/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of Guthani-Raghunathpur Road district of Siwan in Bihar
|
Others
|
ARCHANA KUMARI SINGH
|
0.0105
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
|
28
|
Bihar
|
FP/BR/Others/45108/2020
|
FP/BR/Others/45108/2020
|
Diversion of 0.011775 ha of forest land for construction of approach road for opening retail outlet of BPCL on Lalganj-Fakuli Road in Vaishali district of Bihar.
|
Others
|
SULEKHA DEVI
|
0.01178
|
IN-PRINCIPLE
|
28-Aug-2020
|
|
|
|
|
|
No
|
|
29
|
Bihar
|
FP/BR/Others/8755/2014
|
FP/BR/Others/8755/2014
|
Stadium construction at sapneri village
|
Others
|
BDO KHIZARSARAI
|
0.48564
|
IN-PRINCIPLE
|
23-Dec-2014
|
|
|
|
|
|
No
|
|
30
|
Bihar
|
FP/BR/ROAD/144807/2021
|
FP/BR/ROAD/144807/2021
|
Up-gradation & Widening to Two Lane with Paved shoulder from KM. 0.000 to KM. 30.660 of Existing National Highway NH-319A (Mohania– Ramgarh- Chausa- Buxar) in Kaimur district, in the State of Bihar.
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION AURANGABAD BIHAR
|
17.9123
|
IN-PRINCIPLE
|
13-Jun-2023
|
|
|
|
|
|
No
|
|
31
|
Bihar
|
FP/BR/ROAD/21782/2016
|
FP/BR/ROAD/21782/2016
|
Forest Diversion Proposal of Diversion of 1.47 ha PF Land for construction of Flyover & Vehicular Underpass at Patna-Gaya-Dobhi Section of NH-83 0.00-127.00 KM
|
Road
|
PROJECT DIRECTOR NHAI PIU GAYA
|
1.47
|
IN-PRINCIPLE
|
18-Sep-2017
|
|
|
|
|
|
No
|
|
32
|
Bihar
|
FP/BR/ROAD/39045/2019
|
FP/BR/ROAD/39045/2019
|
Construction of HL RCC Bridge at KM 2nd, KM 14th, KM 40th & KM 43th of NH – 333 in the state of Bihar under Action Plan 2017-18.
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
1.206
|
IN-PRINCIPLE
|
11-Apr-2020
|
|
|
|
|
|
No
|
|
33
|
Bihar
|
FP/BR/Canal/36287/2018
|
FP/BR/Canal/36287/2018
|
Dhadhar Diversion Project
|
Canal
|
EXECUTIVE ENGINEER TILAIYA CANAL DIVISION WAZIRGANJ GAYA
|
0.7692
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
No
|
|
34
|
Bihar
|
FP/BR/Others/32454/2018
|
FP/BR/OTHERS/32454/2018
|
Diversion of 0.03 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of Wazzirganj-Fatehpur Road in Gaya district of Bihar.
|
Others
|
AJAY KUMAR DINKAR
|
0.03
|
IN-PRINCIPLE
|
17-Jun-2019
|
|
|
|
|
|
No
|
|
35
|
Bihar
|
FP/BR/Others/36334/2018
|
FP/BR/Others/36334/2018
|
Diversion of 0.008145 ha of forest land for construction of approach road for opening retail outlet of BPCL on the side of Dehri-Rajpur Road in Rohtas district of Bihar.
|
Others
|
ALKA SINGH
|
0.008145
|
IN-PRINCIPLE
|
15-Sep-2020
|
|
|
|
|
|
No
|
|
36
|
Bihar
|
FP/BR/Others/40869/2019
|
FP/BR/Others/40869/2019
|
Development of Papharni Lake, Akash Ganga and Mandar Hill Top under Mandar Hill and Ang Pradesh Circuit Under Swedish Darshan Scheme at Banka
|
Others
|
DEPARTMENT OF TOURISM GOVT OF BIHAR
|
0.72
|
IN-PRINCIPLE
|
30-May-2020
|
|
|
|
|
|
No
|
|
37
|
Bihar
|
FP/BR/ROAD/149739/2021
|
FP/BR/ROAD/149739/2021
|
Consultancy Services for Preparation of DPR for Two laning with paved shoulder of Ghazipur – Ballia - UP/Bihar Greenfield section from Km. 0.000 to 115.200 of NH-19 including Buxar Spur (Length:17.800
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AZAMGARH
|
5.66
|
IN-PRINCIPLE
|
11-Jun-2024
|
|
|
|
|
|
Yes
Proposal No.: IA/UP/NCP/229313/2021
EC File No.: 10/43/2021-IA.III
Proposal Status: TOR GRANTED
|
|
38
|
Bihar
|
FP/BR/ROAD/26357/2017
|
FP/BR/ROAD/26357/2017
|
Proposed ROB at Railway Km. 591.756 (591/24-26 Tp) Between Railway Station Ara - Jamira Halt In Lieu Of L.C No - 48a/3t And At Road Ch: 119.00 From Sasaram To Patna Of National Highway-30
|
Road
|
NH DIVISION GULZARBAGH
|
1.828
|
IN-PRINCIPLE
|
18-Jan-2018
|
|
|
|
|
|
No
|
|
39
|
Bihar
|
FP/BR/Others/26844/2017
|
FP/BR/Others/26844/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on N.H. - 107, Baijnathpur-Madhepura Road in Saharsa district of Bihar.
|
Others
|
TUNAM KUMARI
|
0.0165
|
IN-PRINCIPLE
|
18-May-2018
|
|
|
|
|
|
No
|
|
40
|
Bihar
|
FP/BR/Others/42754/2019
|
FP/BR/Others/42754/2019
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-74 in Vaishali district of Bihar.
|
Others
|
ANAND KUMAR
|
0.01275
|
IN-PRINCIPLE
|
29-Jun-2020
|
|
|
|
|
|
No
|
|
41
|
Bihar
|
FP/BR/Others/44106/2020
|
FP/BR/Others/44106/2020
|
Diversion of 0.0102 ha of forest land for construction of approach road for opening retail outlet of Citizencare Biofuel Power Projects Pvt. Ltd. on NH-103 Road in Samastipur district of Bihar.
|
Others
|
AJEET KUMAR JHA
|
0.0102
|
IN-PRINCIPLE
|
15-Jun-2020
|
|
|
|
|
|
No
|
|
42
|
Bihar
|
FP/BR/Others/44475/2020
|
FP/BR/Others/44475/2020
|
Diversion of 0.00765 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-93 Road in Samastipur district of Bihar.
|
Others
|
URMILA DEVI
|
0.00765
|
IN-PRINCIPLE
|
15-Jun-2020
|
|
|
|
|
|
No
|
|
43
|
Bihar
|
FP/BR/Others/44894/2020
|
FP/BR/Others/44894/2020
|
Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-57 Road in Supaul district of Bihar.
|
Others
|
BALESHWAR PASWAN
|
0.0285
|
IN-PRINCIPLE
|
30-Sep-2020
|
|
|
|
|
|
No
|
|
44
|
Bihar
|
FP/BR/Others/30020/2017
|
FP/BR/OTHERS/30020/2017
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bakhadda Chowk on Malipur-Daulatpur Road in Begusarai district of Bihar.
|
Others
|
INDIAN OIL CORP LTD
|
0.0075
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
|
45
|
Bihar
|
FP/BR/Others/44387/2020
|
FP/BR/Others/44387/2020
|
Diversion of 0.0175 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-69 Road in Gaya district of Bihar.
|
Others
|
MAMTA KUMARI
|
0.0175
|
IN-PRINCIPLE
|
03-Nov-2020
|
|
|
|
|
|
No
|
|
46
|
Bihar
|
FP/BR/Others/50602/2020
|
FP/BR/Others/50602/2020
|
Diversion of 0.01575 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
DEEPAK KUMAR BHUIYAN
|
0.01575
|
IN-PRINCIPLE
|
23-Jun-2022
|
|
|
|
|
|
No
|
|
47
|
Bihar
|
FP/BR/ROAD/141547/2021
|
FP/BR/ROAD/141547/2021
|
Widening and Strengthening of Road in length in 3.784 KM Which is a connecting stretch length of SH-50 to NH28 at Musarigharari
|
Road
|
SRI ASHOK KUMAR
|
2.838
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
|
48
|
Bihar
|
FP/BR/Others/33210/2018
|
FP/BR/Others/33210/2018
|
Diversion of 0.02212 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Muzaffarpu-Pusa-Samastipur Road district of Samastipur in Bihar
|
Others
|
UMESH RAM
|
0.02212
|
IN-PRINCIPLE
|
03-Dec-2020
|
|
|
|
|
|
No
|
|
49
|
Bihar
|
FP/BR/Others/36428/2018
|
FP/BR/Others/36428/2018
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of IOCL Kisan Seva Kendra on the side of Beusarai-Birpur-Sanjat Road in Begusarai district of Bihar.
|
Others
|
MANOJ KUMAR BEGUSARAI
|
0.018
|
IN-PRINCIPLE
|
30-Jul-2019
|
|
|
|
|
|
No
|
|
50
|
Bihar
|
FP/BR/Others/40266/2019
|
FP/BR/Others/40266/2019
|
Diversion of 0.012 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of SH-88 in Samastipur district of Bihar.
|
Others
|
SATYAM SONI AND ANIL KUMAR
|
0.012
|
IN-PRINCIPLE
|
13-Sep-2019
|
|
|
|
|
|
No
|
|