Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/IND/10371/2015 4-APB010/2015-CHN Proposal for Diversion of 0.49Ha forest land in Odalarevu Protected forest Industry ONGC 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 21 Aug 2015
Compliance Report Submitted by User Agency on : 29 Sep 2016
09 Jan 2017
2 Andhra Pradesh FP/AP/Others/14866/2015 4-APB008/2015-CHN Diversion of 0.30 Ha of Forest Land in Compt. No. 85 of Pasuvemula RF of WLM -Markapur Division for Laying of Optical Fibre Cable in favour of Idea Cellular Ltd. Others IDEA CELLULAR LIMITED 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2015
Stage-I Approval on : 08 Jan 2016
Compliance Report Submitted by User Agency on : 04 Jul 2016
14 Jun 2016
3 Andhra Pradesh FP/AP/TRANS/22375/2016 GO.Rt.No.87, Dt:17.04.2017 Proposal for Erection of 33kv Transmission line from wind farm common point VCB yard at pattanagaram to 132/33kv substation of AP Transco grid at Banaganapaali, Kurnool District, A P. Transmission Line APSPDCL DHONE 0.85 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Nov 2016
Stage-I Approval on : 17 Apr 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
4 Andhra Pradesh FP/AP/ROAD/10475/2015 3343/ Section-II/2016 Rehabilitation and upgradation of NH-221 (New NH-30) from Km 32.735 to 71.200 (Chandragudem - AP/Telangana Border Section), Krishna District in the State of Andhra Pradesh, National Highway Development Programme. Road HIGHWAYS 0.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2016
Stage-I Approval on : 25 Jul 2016
Compliance Report Submitted by User Agency on : 24 Sep 2016
16 Feb 2017
5 Andhra Pradesh FP/AP/ROAD/19123/2016 4-APB017/2016-CHN Diversion of 2.26 Ha of Forest land in Sangam RF of Atmakur Range in Nellore Division for Upgradation of NH-67 from Km.707+500 to Km.708+880 to two lane with paved shoudlers in the State of AP under NHDP-IV through EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 2.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 May 2016
Stage-I Approval on : 20 Sep 2016
Compliance Report Submitted by User Agency on : 17 Jul 2017
04 Aug 2017
6 Bihar FP/BR/Others/25453/2017 FP/BR/Others/25453/2017 Diversion of 0.0045 ha of forest land for construction of approach road for opening retail outlet of BPCL on Vidhapati-Dalsinghsarai Road in Samastipur district of Bihar. Others RAKESH KUMAR PASWAN 0.0045 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Mar 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 30 Aug 2017
7 Bihar FP/BR/Others/18228/2016 FP/BR/Others/18228/2016 M/s ultra Tech Cement Ltd. is Proposing for setting up of 2.0 million Tonnes per annum cement Grinding Unit at Villages. Others ULTRATECH CEMENT PVT LTD 0.77 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Feb 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 21 Aug 2017
19 Sep 2017
8 Bihar FP/BR/Others/25319/2017 FP/BR/Others/25319/2017 Diversion of 0.00615 ha of forest land for construction of approach road for opening retail outlet of HPCL on Bhagipatty-Samaur Road in Gopalganj district of Bihar. Others PRAMATMA KUMAR SINGH 0.00615 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Mar 2017
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 16 Oct 2017
9 Bihar FP/BR/Others/25843/2017 FP/BR/Others/25843/2017 Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-7 in Gaya district of Bihar. Others PRADEEP YADAV IOCL 0.015 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Apr 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 22 Sep 2017
10 Bihar FP/BR/Others/25228/2017 FP/BR/Others/25228/2017 Diversion of 0.00375 ha of forest land for construction of approach road for opening retail outlet of HPCL on Lalganj Road (SH-74) in Vaishali district of Bihar. Others SATRUDHAN KUMAR 0.00375 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Mar 2017
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 14 Sep 2017
11 Bihar FP/BR/Others/23218/2016 FP/BR/Others/23218/2016 The road side land 0.0375 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others ABHISHEK KUMAR G 0.0375 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Dec 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 31 Jul 2017
15 Sep 2017
12 Bihar FP/BR/Others/20581/2016 FP/BR/Others/20581/2016 The road side land 0.0416 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others RABINDRA KUMAR SHAHI 0.0416 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2016
Stage-I Approval on : 25 Aug 2017
Compliance Report Submitted by User Agency on : 13 Sep 2017
16 Oct 2017
13 Bihar FP/BR/Others/20025/2016 FP/BR/Others/20025/2016 The road side land 0.0232 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others SULEKHA KUMARI 0.0232 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2016
Stage-I Approval on : 10 Jan 2017
Compliance Report Submitted by User Agency on : 30 Aug 2017
06 Sep 2017
14 Bihar FP/BR/Others/25659/2017 FP/BR/Others/25659/2017 Diversion of 0.021 ha of forest land for construction of approach road for opening retail outlet of BPCL on Chhapra-Malamliya Road in Saran district of Bihar. Others SHASHI BHUSHAN OJHA 0.021 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Apr 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 01 Sep 2017
09 Oct 2017
15 Bihar FP/BR/Others/14609/2015 FP/BR/others/14609/2015 Diversion of 0.0253725 ha forest land at Rajgir-Hisuwa-Gaya Road of HPCL Retail Outlet in Nawada Division Others Hindustan Petroleum Corporation Limited 0.0253725 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Aug 2015
Stage-I Approval on : 18 Jan 2016
Compliance Report Submitted by User Agency on : 03 Oct 2016
23 Jun 2016
16 Bihar FP/BR/Others/23520/2017 FP/BR/Others/23520/2017 The applicant on the Khaira-Sattarghat Road, Dist.-Saran. The road side land 0.0239 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others BABITA DEVI 0.0239 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jan 2017
Stage-I Approval on : 29 Aug 2017
Compliance Report Submitted by User Agency on : 14 Sep 2017
16 Oct 2017
17 Bihar FP/BR/Others/19910/2016 FP/BR/Others/19910/2016 The road side land 0.0239 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others SANJEET HAZARI 0.012 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 08 Jun 2016
Stage-I Approval on : 20 Sep 2016
Compliance Report Submitted by User Agency on : 21 Aug 2017
18 Bihar FP/BR/Others/18849/2016 FP/BR/Others/18849/2016 The road side land required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/diesel to local people, Farmer for vehicle, pump sets, etc. Others SHAKTI KUMAR 0.0133 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Apr 2016
Stage-I Approval on : 05 Oct 2016
Compliance Report Submitted by User Agency on : 16 Oct 2017
19 Bihar FP/BR/Others/20345/2016 FP/BR/Others/20345/2016 The road side land 0.018303 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. Others GOPAL SHARAN 0.018303 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jul 2016
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 06 Aug 2017
26 Sep 2017
20 Bihar FP/BR/Others/17865/2016 FP/BROthers/17865/2016 Laying 30"/24"/12" dia Natural gas pipeline From Phulpur in Uttar Pradesh to Haldiya in West Bengal passing through Bihar and its Spurline in Bihar Others GAIL INDIA LIMITED 4.155 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Feb 2016
Stage-I Approval on : 10 Jan 2017
Compliance Report Submitted by User Agency on : 29 Aug 2017
18 Sep 2017
21 Bihar FP/BR/Others/18795/2016 FP/BR/Others/18795/2016 The Road side land required only for the proposal to use as a approach road so that he vehicle can reach to retail outlet will supply petrol/diesel to local people. farmer for vehicle, pump sets. etc. Others PANKAJ KUMAR SINGH 0.39 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Apr 2016
Stage-I Approval on : 09 Jun 2017
Compliance Report Submitted by User Agency on : 21 Aug 2017
26 Sep 2017
22 Bihar FP/BR/Others/18801/2016 FP/BR/Others/18801/2016 The road side is required only for the proposal to use as on approach road to that the vehicle car reach to thpsets etc.e retail outlets which will supply the patrol/diesel to local people and framers for vehicle, pum Others PRIYANKA SINGH 0.02444 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Apr 2016
Stage-I Approval on : 05 Oct 2016
Compliance Report Submitted by User Agency on : 21 Aug 2017
04 Oct 2017
23 Bihar FP/BR/ROAD/23857/2017 FP/BR/ROAD/23857/2017 Widening and strengthening project of NH-82 Biharsharif-Barbigha-Mokama Section diversion of 42.6362 ha in the state of Bihar Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU PATNA 42.6362 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Feb 2017
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 10 Oct 2017
10 Oct 2017
24 Chandigarh FP/CH/Others/16272/2015 For/16/160 The Project involves underground laying of Natural Gas Pipeline in existing ROW from end of IT park Red light towards transport chowk near Shivalik Nursery on Madhya Marg. Others INDIAN OIL ADANI GAS PVT LTD 0.0228 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2015
Stage-I Approval on : 26 May 2016
Compliance Report Submitted by User Agency on : 03 Jun 2016
27 Jun 2016
25 Dadar & Nagar Haveli FP/DN/Others/16736/2015 7-5/3-FD/562 Diversion of 0.6969 Hectare Protected Forest land for laying pipeline parallel & across to Roads and Canals side of their strip plantation declared as Protected Forest in Dadra and Nagar Haveli (U/T) Others GUJARAT GAS LIMITED 0.6969 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Nov 2015
Stage-I Approval on : 16 Sep 2016
Compliance Report Submitted by User Agency on : 25 May 2017
26 Goa FP/GA/ROAD/18652/2016 4-GOC1102/2016-BAN Construction of Missing Link -4-lane Highway along with paved shoulder from km. 11/680 to km. 14/020 and up-gradation of existing stretch of 2-lane Highway to 4-lane from km. 14/020 to km. 15/520 with paved shoulder of NH-17B on Loutolim Village of Verna Industrial Estate of Salcete Taluka in Goa S Road PUBLIC WORKS DEPARTMENT 5.18 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Mar 2016
Stage-I Approval on : 01 Feb 2017
Compliance Report Submitted by User Agency on : 30 Aug 2017
29 Aug 2017
27 Goa FP/GA/ROAD/14950/2015 4-GOB 1084/2016-BAN The land is required for the work of four laning of NH-4A(NH-748) betw, KM 118/00 to 125/00 including construction of high level four lane new Khandepar bridge at KM 118/800. Road PUBLIC WORKS DEPARTMENT 0.9959 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Sep 2015
Stage-I Approval on : 19 Sep 2016
Compliance Report Submitted by User Agency on : 05 Sep 2017
15 Sep 2017
28 Gujarat FP/GJ/Others/16210/2015 C/T-10/Land/69/72//2016-17 Diversion of 0.8286 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 20/15 Cm dia Steel & 12.5/9 Cm of MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka Morbi & Wankaner in Morbi District, Gujar Others GUJARAT GAS LIMITED 0.8286 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Oct 2015
Stage-I Approval on : 16 Jun 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
29 Gujarat FP/GJ/Others/8003/2014 C/T-10/Land/27-29/2016-17 Diversion of 0.6307 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 125/90 mm dia MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka/District Morbi. Others GSPC GAS COMPANY LIMITED 0.6307 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Nov 2014
Stage-I Approval on : 26 May 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
30 Gujarat FP/GJ/Others/7931/2014 C/FCA/T-3/54-57/2016-17 Proposal for obtaining permission for diversion of 0.8210 Hectare of Protected Forest Land (Road Side Strip Plantation) for laying Natural Gas Pipeline in Navsari District Others GSPC GAS COMPANY LIMITED 0.821 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Nov 2014
Stage-I Approval on : 23 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
31 Gujarat FP/GJ/Others/13789/2015 A/FCA/T-8/615-18/16 Diversion of 0.785 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 15 Cm dia Steel natural gas pipeline to supply natural gas to various en-route villages / industries in Sayla Taluka in Surendranagar District, Gujarat State Others GUJARAT GAS LIMITED 0.785 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 27 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
32 Gujarat FP/GJ/Others/16371/2015 C/FCA/T-3/97-100/2016-17 Diversion of 2.5751 Hectare of Protected Forest land i.e. road side strip plantation declared as protected forest for laying natural gas pipeline to supply natural gas to various en-route villages in District Navsari Others GUJARAT GAS LIMITED 2.5751 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Nov 2015
Stage-I Approval on : 23 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
33 Gujarat FP/GJ/Others/19825/2016 C/FCA/T-14/547-51/16-17 Laying of 18"dia Petroleum Product pipeline for transportation of finished petroleum product from existing dispatch terminal at Village Chadisar Dist. Palanpur Others Hindustan Petroleum Corporation Limited 0.002 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 02 Jun 2016
Stage-I Approval on : 13 Jul 2016
Compliance Report Submitted by User Agency on : 01 Mar 2017
34 Haryana FP/HR/Others/16315/2015 5240 DIVERSION OF FOREST LAND FOR ACCESS TO THE PROPOSED PETROL PUMP OF BHARAT PETROLEUM CORPORATION LTD. MDR 118 KM STONE 20.515 ON PUNDRI RAJOUND ROAD VILLAGE PAI DISTT KAITHAL (HARYANA)BEARING KHASRA NO 134//5/1. Others BHARAT PETROLEUM CORPORATION LIMITED 0.0159 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 22 Mar 2016
Compliance Report Submitted by User Agency on : 04 Apr 2016
35 Haryana FP/HR/ROAD/7808/2014 9-HRC055-2015-CHA Diversion of 5.17 ha of forest land for widening of 2 lane on NH-709 (E) from KM. 123.520 to 146.500 under forest division and distt. Bhiwani Road Executive Engineer, PD-III, PWD B&R Br. Rohtak 5.17 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 28 Sep 2015
Compliance Report Submitted by User Agency on : 04 Nov 2015
36 Haryana FP/HR/Others/26424/2017 5122 NOC for diversion of forest land of 0.0584 hectare area for our Retail Outlet situated Between KM Stone no.66-69, on Shahbad-Thol Road (SH-04) (Kala Amb-Sadhaura) RD 66.540(RHS) Village-Raipur, Block-Shahbad, Distt. Kurukshetra (Haryana). Others IOCL PANIPAT DIVISIONAL OFFICE 0.0584 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2017
Stage-I Approval on : 25 Jul 2017
Compliance Report Submitted by User Agency on : 23 Aug 2017
11 Sep 2017
37 Haryana FP/HR/ROAD/19308/2016 5400 Diversion of forest land for construction of minor bridges over Janauli Drain at km 73.400 of Rewari Sohna Palwal road NH-71B in Palwal District Road PUBLIC WORKS DEPARTMENT 0.21 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 16 Aug 2016
Compliance Report Submitted by User Agency on : 03 Feb 2017
14 Feb 2017
38 Haryana FP/HR/ROAD/19777/2016 9-HRB173-2016-CHA Diversion of 1.70 Hectare forest land for widening of NH-73 to SH-01 via Sadiqpur Harbon Road Road PWD B AND R HARYANA 1.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 10 Mar 2017
Compliance Report Submitted by User Agency on : 18 Apr 2017
31 May 2017
39 Haryana FP/HR/Others/19781/2016 9-HRB108-2016-CHA Diversion of 0.02214 ha of forest land for access for project of Essar Oil Ltd. at Km 19.115 (LHS) on SH No. 18, (Rohtak-Sonipat Road), in Village kansala Tehsil and Distt. Rohtak Haryana Others GSP INFRA AND TRADING CONSULTANTS PVT LTD 0.02214 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 10 Aug 2016
Compliance Report Submitted by User Agency on : 16 Aug 2016
24 Aug 2016
40 Haryana FP/HR/ROAD/27232/2017 9-HRB110-2017-CHA Forest land is required for access to Indane LPG Gas Cylinder Godown of M/s Rawal Indane Gas Agency along Bapoli-Goyla Khurd Road at village Bapoli Distt. Panipat Road MS RAWAL INDANE GAS AGENCY 0.003 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 31 Aug 2017
Compliance Report Submitted by User Agency on : 07 Sep 2017
04 Oct 2017
41 Haryana FP/HR/Others/20761/2016 9-HRB161-2016-CHA Diversion of forest land 0.0130 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at KM Stone No 48 (RHS) Chainage 48.140 at Khewat No. 164, Khatauni No. 250, Kila No. 89//3/1/2(0-11), 89//3/2(2-14), Village - Mallekan, on Sirsa-Ellnabad Road (RHS), Tehsil - Sirsa, District - Sirsa Others Essar Oil Limited 0.013 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2016
Stage-I Approval on : 15 Dec 2016
Compliance Report Submitted by User Agency on : 17 Dec 2016
26 Dec 2016
42 Haryana FP/HR/Others/14277/2015 9-HRB150-2015-CHA Green Island Resorts at village Ram Nagaria on Sardulgarh Sirsa Ellenabad Road SH No.23 Km. 32.10 R.H.S. in Sirsa District Others GREEN ISLAND RESORTS 0.007 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2015
Stage-I Approval on : 09 Mar 2016
Compliance Report Submitted by User Agency on : 26 Apr 2016
17 May 2016
43 Haryana FP/HR/Others/14300/2015 5102 Proposed retail outlet (KSK) on Mahendergarh Sehlang road km 7-8 RHS at village Malra. Others OIL INDIA LIMITED 0.0119 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2015
Stage-I Approval on : 03 Nov 2015
Compliance Report Submitted by User Agency on : 30 Nov 2015
02 Dec 2015
44 Haryana FP/HR/TRANS/21664/2016 5534 FOR ERRECTION OF PCC POLE AND ERRECTION OF H.T XLPE CABLE ON RAIPUR RANI TO MANAKTABRA ROAD Transmission Line SDO 0.0011 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2016
Stage-I Approval on : 11 Nov 2016
Compliance Report Submitted by User Agency on : 22 Dec 2016
19 Jan 2017
45 Haryana FP/HR/Others/19757/2016 5368 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 56//25, 57//19/2, 21, 22 ON BHIWANI CITY BETWEEN MEHAM GATE TO HARYANA PRAKRITIK CHIKITSALAYA ON BHIWANI-MEHAM ROAD, VILLAGE-KALUWAS, TEHSIL-BHIWANI, DISTRICT-BHIWANI Others INDIAN OIL CORPORATION LTD 0.014384 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2016
Stage-I Approval on : 30 Jul 2016
Compliance Report Submitted by User Agency on : 18 Jul 2016
25 Jul 2016
46 Haryana FP/HR/Others/19764/2016 9-HRB112-2016-CHA Prposed Path for our new Essar Oil Limited's Fueling Station on Karnal=Kachwa-Sambhli-Kaul-Pehowa Road, Near KM. Stone 12 at Village Kachwa, Tehsil & District Karnal (Haryana). Others Essar Oil Limited 0.0115 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2016
Stage-I Approval on : 15 Dec 2016
Compliance Report Submitted by User Agency on : 29 Dec 2016
18 Jan 2017
47 Haryana FP/HR/Others/13002/2015 9-HRB002-2016-CHA at Khewat No.- 68min, Khatoni No. 78min, Mustkil/Kila No. 71//15/2(2-8), 16/2(0-11), Village – Atela Kalan, Tehsil – Charkhi Dadri & Disrict –Bhiwani, State - Haryana Others ESSAR OIL LIMITED 0.0167 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2015
Stage-I Approval on : 13 Jan 2016
Compliance Report Submitted by User Agency on : 17 Feb 2016
21 Mar 2016
48 Haryana FP/HR/Others/13594/2015 9-HRB132-2015-CHA at Khewat No.- 688, Khatoni No. 793, Mustkil No.- 198, Kila No. 9, 10/1, Village-Karsindhu, on Uchana - Kithana Road, Sub Tehsil - Uchana, Tehsil - Narwana & Disrict – Jind, State - Haryana. Others ESSAR OIL LIMITED 0.0119 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2015
Stage-I Approval on : 02 Dec 2015
Compliance Report Submitted by User Agency on : 04 Jan 2016
05 Apr 2016
49 Haryana FP/HR/TRANS/20601/2016 9-HRC078-2017-CHA Divesion of 99.056 hec. of forest land for Construction of Lilo of Both Circuit of Bamauli-Samaypur 400 KV D/C Transmission Line along Sohna Road under Forest Divsion & District Faridabad. Transmission Line POWER GRID CORPORATION OF INDIA LIMITED 99.056 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2016
Stage-I Approval on : 19 Jul 2017
Compliance Report Submitted by User Agency on : 01 Sep 2017
13 Sep 2017
50 Haryana FP/HR/Others/17791/2016 9-HRB131-2016-CHA Up-Gradation of Strom Water System in Pundri Town Teh.& Distt Kaithal (CM Announcement Code No. 10321) Others PHED 0.3128 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 16 Jun 2017
05 Jul 2017
12345678910...
Please wait ...