List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Haryana FP/HR/Approach/36837/2018 8824 Diversion of 0.0313 Ha of forest Land for Construction of approach road for Ambala Logistics Park, on Ambala to Delhi road Km 189-190 L/Side at Village Mohri, under forest Division & District – Kurkeshtra Haryana Approach Access AMBALA LOGISTICS PARK 0.0313 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2018
Stage-I Approval on : 26 Jun 2019
Compliance Report Submitted by User Agency on : 09 Jan 2020
28 Jan 2020
2 Haryana FP/HR/ROAD/15887/2015 9-HRB022-2017-CHA The volume of traffic on this road has increased manifold over the years. The existing width is inadequate for smooth run of vehicles. The road is accident prone and traffic jams put travelers to inconvenience. Furthermore, the traffic jams etc. result in environmental pollution. Hence the proposal. Road Haryana PWD B&R Faridabad 4.293 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 25 Sep 2017
Compliance Report Submitted by User Agency on : 18 Sep 2019
08 Nov 2019
3 Haryana FP/HR/Others/16315/2015 5240 DIVERSION OF FOREST LAND FOR ACCESS TO THE PROPOSED PETROL PUMP OF BHARAT PETROLEUM CORPORATION LTD. MDR 118 KM STONE 20.515 ON PUNDRI RAJOUND ROAD VILLAGE PAI DISTT KAITHAL (HARYANA)BEARING KHASRA NO 134//5/1. Others BHARAT PETROLEUM CORPORATION LIMITED 0.0159 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 22 Mar 2016
Compliance Report Submitted by User Agency on : 04 Apr 2016
25 Apr 2016
4 Haryana FP/HR/ROAD/7808/2014 9-HRC055-2015-CHA Diversion of 5.17 ha of forest land for widening of 2 lane on NH-709 (E) from KM. 123.520 to 146.500 under forest division and distt. Bhiwani Road Executive Engineer, PD-III, PWD B&R Br. Rohtak 5.17 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 28 Sep 2015
Compliance Report Submitted by User Agency on : 04 Nov 2015
5 Haryana FP/HR/Others/40460/2019 8893 Laying of Sewer line along Mahendergarh Kosali road to Sehore road and Gahra road under forest division and district Mahendergarh. The Project approved by EIC, PHED, Haryana Panchkula Memo No 86885 dated 06-09-2018. Others SDE PHE KANINA 0.14 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2019
Stage-I Approval on : 12 Nov 2019
Compliance Report Submitted by User Agency on : 27 Jan 2020
03 Feb 2020
6 Haryana FP/HR/Others/26424/2017 5122 NOC for diversion of forest land of 0.0584 hectare area for our Retail Outlet situated Between KM Stone no.66-69, on Shahbad-Thol Road (SH-04) (Kala Amb-Sadhaura) RD 66.540(RHS) Village-Raipur, Block-Shahbad, Distt. Kurukshetra (Haryana). Others IOCL PANIPAT DIVISIONAL OFFICE 0.0584 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2017
Stage-I Approval on : 25 Jul 2017
Compliance Report Submitted by User Agency on : 23 Aug 2017
11 Sep 2017
7 Haryana FP/HR/ROAD/19777/2016 9-HRB173-2016-CHA Diversion of 1.70 Hectare forest land for widening of NH-73 to SH-01 via Sadiqpur Harbon Road Road PWD B AND R HARYANA 1.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 10 Mar 2017
Compliance Report Submitted by User Agency on : 18 Apr 2017
31 May 2017
8 Haryana FP/HR/ROAD/19308/2016 5400 Diversion of forest land for construction of minor bridges over Janauli Drain at km 73.400 of Rewari Sohna Palwal road NH-71B in Palwal District Road PUBLIC WORKS DEPARTMENT 0.21 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 16 Aug 2016
Compliance Report Submitted by User Agency on : 03 Feb 2017
14 Feb 2017
9 Haryana FP/HR/Others/19781/2016 9-HRB108-2016-CHA Diversion of 0.02214 ha of forest land for access for project of Essar Oil Ltd. at Km 19.115 (LHS) on SH No. 18, (Rohtak-Sonipat Road), in Village kansala Tehsil and Distt. Rohtak Haryana Others GSP INFRA AND TRADING CONSULTANTS PVT LTD 0.02214 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 10 Aug 2016
Compliance Report Submitted by User Agency on : 16 Aug 2016
24 Aug 2016
10 Haryana FP/HR/TRANS/39638/2019 9-HRB087-2019-CHA Diversion of 0.135 Hect. of forest land for the construction of 66 KV D/C Line from 220 KV S/Stn Rajokheri to 66 KV S/Stn Malikpur with LILO of one circuit at 66 KV Sub-Station Adhoya, Ambala District Transmission Line HVPNL AMBALA 0.135 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Mar 2019
Stage-I Approval on : 24 Sep 2019
Compliance Report Submitted by User Agency on : 27 Feb 2020
11 Haryana FP/HR/TRANS/39639/2019 9050 Diversion of 0.0288 Hect. of forest land for the construction of Lilo of One Circuit of 66 KV Yara-Ugala Line at 220 KV S/Stn Rajokheri, Ambala District Transmission Line HVPNL AMBALA 0.0288 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2019
Stage-I Approval on : 17 Nov 2019
Compliance Report Submitted by User Agency on : 27 Feb 2020
17 Mar 2020
12 Haryana FP/HR/Others/11422/2015 9-HRB063-2015-CHA At Khasra No.- 38, Kila No. 19, 22/2, Village- Lahli, on Ratia - Alika Road (RHS) MDR-101,Tehsil – Ratia & Disrict – Fatehabad, State - Haryana Others ESSAR OIL LIMITED 0.0126 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2015
Stage-I Approval on : 30 Sep 2015
Compliance Report Submitted by User Agency on : 11 Dec 2017
27 Oct 2015
13 Haryana FP/HR/Approach/41411/2019 8985 Diversion of forest land 0.018512 Hac for access to the Proposed Retail Outlet of Indian oil Corporation Ltd. on Sohna-Ballabgarh Road (L.H.S.), in plot with, Mustil/Kila No-14//21/2, 20//1/1, at Vill-Kabulpur Banger, Tehsil-Ballabgarh, Distt-Faridabad, State-Haryana. Approach Access M/S INDIAN OIL CORPORATION LTD. 0.01851 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2019
Stage-I Approval on : 13 Sep 2019
Compliance Report Submitted by User Agency on : 27 Sep 2019
04 Oct 2019
14 Haryana FP/HR/ROAD/27232/2017 9-HRB110-2017-CHA Forest land is required for access to Indane LPG Gas Cylinder Godown of M/s Rawal Indane Gas Agency along Bapoli-Goyla Khurd Road at village Bapoli Distt. Panipat Road MS RAWAL INDANE GAS AGENCY 0.003 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 31 Aug 2017
Compliance Report Submitted by User Agency on : 07 Sep 2017
04 Oct 2017
15 Haryana FP/HR/ROAD/27611/2017 9-HRB131-2017-CHA Diversion of forest land for construction of road and utility crossing across bundh for our residential Group Housing Project at Sector 66, Village Badshahpur, Gurgaon Road EMAAR MGF LAND LIMITED 0.0563 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 16 Oct 2017
Compliance Report Submitted by User Agency on : 31 Oct 2017
22 Nov 2017
16 Haryana FP/HR/Others/20761/2016 9-HRB161-2016-CHA Diversion of forest land 0.0130 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at KM Stone No 48 (RHS) Chainage 48.140 at Khewat No. 164, Khatauni No. 250, Kila No. 89//3/1/2(0-11), 89//3/2(2-14), Village - Mallekan, on Sirsa-Ellnabad Road (RHS), Tehsil - Sirsa, District - Sirsa Others Essar Oil Limited 0.013 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2016
Stage-I Approval on : 15 Dec 2016
Compliance Report Submitted by User Agency on : 17 Dec 2016
26 Dec 2016
17 Haryana FP/HR/Others/14277/2015 9-HRB150-2015-CHA Green Island Resorts at village Ram Nagaria on Sardulgarh Sirsa Ellenabad Road SH No.23 Km. 32.10 R.H.S. in Sirsa District Others GREEN ISLAND RESORTS 0.007 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2015
Stage-I Approval on : 09 Mar 2016
Compliance Report Submitted by User Agency on : 26 Apr 2016
17 May 2016
18 Haryana FP/HR/Others/14300/2015 5102 Proposed retail outlet (KSK) on Mahendergarh Sehlang road km 7-8 RHS at village Malra. Others OIL INDIA LIMITED 0.0119 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2015
Stage-I Approval on : 03 Nov 2015
Compliance Report Submitted by User Agency on : 30 Nov 2015
02 Dec 2015
19 Haryana FP/HR/Others/38664/2019 6524 Diversion of 0.267 Ha of forest Land for Construction of RCC Drain (Nallah) from Triveni Chownk to Culvert in from of Grain market in Municipal Committee ,Barara, along with SH04 , KM38-39Barara, Ambala Others SECRARTRY MUNICIPAL COMMITTEE BARARA 0.267 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2019
Stage-I Approval on : 16 Mar 2019
Compliance Report Submitted by User Agency on : 08 May 2019
18 Jun 2019
20 Haryana FP/HR/ROAD/31601/2018 6098 Diversion of Forest Land For access to the proposed petrol pump of Hindustan Petrolium Corporation Ltd. on SONIPAT TO GANNOUR ROAD, At Village BHURI, Distt. SONIPAT, HARYANA, bearing khasra no.- 41//5/2,40//1/1/2. Road Hindustan Petroleum Corporation Limited 0.0083 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 28 Feb 2018
Compliance Report Submitted by User Agency on : 06 Mar 2018
08 Mar 2018
21 Haryana FP/HR/IND/23855/2017 9-HRB027-2017-CHA Diversion of 0.0166 Hac. forest land for access to the Proposed Industries of Pan-Pack India Pvt. Ltd. Along at Village-Jaisinghpur, Tehsil-Nuh, District-Mewat, State - Haryana Industry CAN PACK INDIA PRIVATE LIMITED 0.0166 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2017
Stage-I Approval on : 09 Oct 2017
Compliance Report Submitted by User Agency on : 16 Nov 2017
19 Dec 2017
22 Haryana FP/HR/Approach/43659/2019 9209 PROPOSED HPCL RETAIL OUTLET ON BADHKALI- PINANGWAN ROAD (MDR-131) NEAR KM STONE-8(RHS) AT VILLAGE MARORA, TEHSIL FIROZPUR ZIRKHA DISTT. NUH, (HARYANA) Approach Access Hindustan Petroleum Corporation Limited 0.012 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 21 Feb 2020
Compliance Report Submitted by User Agency on : 03 Mar 2020
06 Mar 2020
23 Haryana FP/HR/Approach/43672/2019 D-III-9319 Diversion of 0.0101 Hac. Forest land oalong on Siwani-Gurera/Sidhmukh Road(ODR), at village Gurera, tehsil Siwani, Distt. Bhiwani. Approach Access BHARAT PETROLEUM CORPORATION LTD, 0.0101 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 22 May 2020
Compliance Report Submitted by User Agency on : 01 Jun 2020
24 Haryana FP/HR/Approach/43675/2019 9260 Diversion of 0.0239 Hac. Forest land along on Ratia-Budhlada Road( SH-21) Near KM. 34, at village Bahmanwala, Tehsil Ratia, Distt.- Fatehabad. Approach Access INDIAN OIL CORPORATION LTD 0.0239 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 19 Mar 2020
Compliance Report Submitted by User Agency on : 28 Apr 2020
01 May 2020
25 Haryana FP/HR/TRANS/37966/2018 8831 Construction of 400kV D/C Aligarh-Prithala Transmission Line under Palwal Forest Division under juridiction of Haryana State. The Project is awarded by PFC Consulting Limited , Govt of India through Tariff Based Competitive Bidding (TBCB) Process. Transmission Line GURGAON PALWAL TRANSMISSION LIMITED 0.2537 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2018
Stage-I Approval on : 26 Jun 2019
Compliance Report Submitted by User Agency on : 18 Jul 2019
06 Aug 2019
26 Haryana FP/HR/Approach/41834/2019 9199 Access to BPCL Retail outlet at village Kharia on Rania to Kharia road Km 10-11 LHS in Tehsil Rania, under Forest Division & Distt. Sirsa. (Haryana Approach Access BPCL AT KHARIA 0.007 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 04 Mar 2020
Compliance Report Submitted by User Agency on : 18 Mar 2020
10 Apr 2020
27 Haryana FP/HR/Approach/35500/2018 6404 APPROVAL FOR DIVERSION OF FOREST LAND FOR IOCL RETAIL OUTLET AT KHASRA NO. 170//8/2, 12/1, 170//13/1 ON SATNALI- JHOJU KALAN ROAD, VILLAGE- KADMA, TEHSIL- BADHRA, DISTRICT- BHIWANI FOR ENTRY AND EXIT OF THE RETAIL OUTLET AS THERE IS NO OTHER ALTERNATIVE BUT TO SEEK APPROVAL FOR DIVERSION. Approach Access INDIAN OIL CORPORATION LTD 0.0202 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 08 Dec 2018
Compliance Report Submitted by User Agency on : 21 Dec 2018
04 Jan 2019
28 Haryana FP/HR/ROAD/35535/2018 6471 Diversion of 0.449 Ha of forest Land for widening & strg. of NH-65 (NEW NH-152) From KM 22.10 to 24.30 (village Jansui)in Distt. Ambala Road PWD HARYANA AMBALA 0.449 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 29 Jan 2019
Compliance Report Submitted by User Agency on : 27 Mar 2019
22 Apr 2019
29 Haryana FP/HR/TRANS/28968/2017 9-HRB049-2018-CHA Construction of 400 kV D/C Mohindergarh - Bhiwani Transmission Line associated with Northern Region Strengthening Scheme-XXXV Transmission Line POWER GRID CORPORATION OF INDIA LIMITED 2.1716 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2017
Stage-I Approval on : 07 Sep 2018
Compliance Report Submitted by User Agency on : 21 Dec 2018
09 Mar 2019
30 Haryana FP/HR/ROAD/28988/2017 6050 THIS IS A PROPOSAL OF DIVERSION OF FOREST LAND for Re-Construction by way raising in 0.00 to 2.050 Panipat Sanoli road to Kurar at Village Kurar Tehsil Panipat Distt. Karnal (Haryana). Road PWD (B&R) PANIPAT (HARYANA) 0.3772 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2017
Stage-I Approval on : 08 Feb 2018
Compliance Report Submitted by User Agency on : 03 Oct 2019
22 Oct 2019
31 Haryana FP/HR/ROAD/28990/2017 D-III-8119 Diversion of Forest Land For access to the proposed petrol pump of Hindustan Petrolium Corporation Ltd. on DHANOURA TO BILASPUR ROAD, At Village BILASPUR, Distt. YAMUNANAGAR, HARYANA, bearing khasra no.- 46//25/3,45//21,46//25/2 Road HINDUSTAN PETROLEUM CORPORATION LIMITED 0.0183 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2017
Stage-I Approval on : 13 Oct 2017
Compliance Report Submitted by User Agency on : 27 Oct 2017
03 Nov 2017
32 Haryana FP/HR/Approach/42181/2019 9139 Diversion of forest land to proposed Retail outlet of BPCL at village Daba on Cheeka - Samana Road, Teh Guhla, Distt. Kaithal Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.0171 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 15 Jan 2020
Compliance Report Submitted by User Agency on : 06 Feb 2020
06 Feb 2020
33 Haryana FP/HR/Approach/42294/2019 9043 Issue of NOC for development of Retail Outlet in Between KM Stone 46 TO 49, on NH-152 (old NH-65) LHS Ambala To Pehowa, CH.46.715 at Village/Town Malikpur, Tehsil- Pehowa Distt. Kurukshetra Approach Access IOCL PANIPAT DIVISIONAL OFFICE 0.1096 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 12 Nov 2019
Compliance Report Submitted by User Agency on : 14 Nov 2019
15 Nov 2019
34 Haryana FP/HR/TRANS/21664/2016 5534 FOR ERRECTION OF PCC POLE AND ERRECTION OF H.T XLPE CABLE ON RAIPUR RANI TO MANAKTABRA ROAD Transmission Line SDO 0.0011 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2016
Stage-I Approval on : 11 Nov 2016
Compliance Report Submitted by User Agency on : 22 Dec 2016
19 Jan 2017
35 Haryana FP/HR/WATER/36809/2018 6454 Laying of DI pipe line from Rampury Disty Kanina to water works Dahina along with Mahendergarh Rewari road, km 22.5 to 27 under forest division and district Mahendergarh. The project approved EIC, Haryana Chandigarh ltr 111865 dated 21-12-2017. Drinking Water SDE PHE KOSALI 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2018
Stage-I Approval on : 24 Jan 2019
Compliance Report Submitted by User Agency on : 01 Jul 2019
19 Jul 2019
36 Haryana FP/HR/WATER/36820/2018 8645 Proposal for diversion of forest land for construction of Drinking water Tank (under ground service reservoir) in village Tigaon district Nuh Mewat Drinking Water PUBLIC HEALTH ENGINEERING DEPARTMENT 0.65 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2018
Stage-I Approval on : 16 Jan 2019
Compliance Report Submitted by User Agency on : 12 Jun 2019
19 Aug 2019
37 Haryana FP/HR/ROAD/29955/2017 9-HRB039-2018-CHA Widening & Stg. of Sirsa-Ottu-Rania-Dabwali road Km 4.80 to 5.50, 8.00 to 8.80, 10.20 to 11.80, 12.80 to 15.00, 15.40 to 16.40, 17.10 to 18.50, 20.60 to 22.00, 24.00 to 24.70 & 28.00 to 30.00 Sardulgarh-Sirsa-Ellenabad-Hanumangarh-Tibbi road upto Raj. Boarder in Km 31.40 to 33.80 in Sirsa Distt. Road PUBLIC WORK DEPARTMENT 3.195 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2017
Stage-I Approval on : 09 Mar 2018
Compliance Report Submitted by User Agency on : 24 May 2018
12 Jun 2018
38 Haryana FP/HR/Pipeline/43130/2019 9194 Diversion of 0.300 hec. of forest land for laying 12” Dia Steel Natural Gas Pipeline from Chainage K.m 63.62 (Chotu Ram Chowk) to K.m 69.62 on (SH-11), Kaithal Karnal Road L/S Side, Tehsil & Distt. Kaithal, Haryana. Pipeline INDRAPRASTHA GAS LIMITED 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 04 Feb 2020
Compliance Report Submitted by User Agency on : 04 Mar 2020
16 Mar 2020
39 Haryana FP/HR/Approach/37361/2018 9-HRB016-2019-CHA Diversion of 0.3066 Ha forest land for passage to M/s Astin Excavation and Mining Pvt Ltd , at village Gohra Bani Tehsil Bilaspur Dist Yamuna Nagar for Transportation for Mining and mineral Material Approach Access M/S ASTIN EXCAVATION AND MINING PVT LTD AT VILLAGE GORA BANI TEHSIL BILASPUR DIST YNR 0.3066 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 01 Oct 2019
Compliance Report Submitted by User Agency on : 12 Nov 2019
26 Nov 2019
40 Haryana FP/HR/Approach/37376/2018 9-HRB013-2019-CHA Diversion of forest land of 0.0044 Ha. for opening access to O P Jindal Global University on Jagdishpur Road at Village Jagdishpur, Tehsil & District Sonipat Haryana Approach Access O P JINDAL GLOBAL UNIVERSITY 0.0044 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 01 Feb 2019
Compliance Report Submitted by User Agency on : 14 Feb 2019
14 Feb 2019
41 Haryana FP/HR/Approach/37338/2018 9021 This is a proposal of diversion of forest land for access to Textile factory on Khukhrana - Mor Majra road, near km stone no. 06, at Village Khandra, Tehsil Madlauda, Distt. Panipat (Haryana). Approach Access ANKIT GOEL S/O SH. SATBIR GOEL 0.013 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 21 Nov 2019
Compliance Report Submitted by User Agency on : 20 Feb 2020
42 Haryana FP/HR/ROAD/30536/2017 9-HRB092-2018-CHA Diversion of 0.656 ha. of forest land for Wdg. & Stg. of Karnal Kachhwa Sambli Kaul Road RD 21.680 to 26.580 (Road ID 7370)is required due to increase in traffic volume Road PWD B AND R KARNAL HARYANA 0.656 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2017
Stage-I Approval on : 28 May 2018
Compliance Report Submitted by User Agency on : 03 Jul 2018
04 Oct 2018
43 Haryana FP/HR/ROAD/30540/2017 9-HRC088-2018-CHA Diversion of 11.01 ha. of forest land for Wdg. & Stg. of Karnal Munak road MDR- 115 RD 8.720 to 25.200 ( 5.50 to 10.00 mtr.) in Karnal distt.is required due to increase in traffic volume Road PWD B AND R KARNAL HARYANA 11.01 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2017
Stage-I Approval on : 06 Jun 2018
Compliance Report Submitted by User Agency on : 18 Jun 2018
09 Aug 2018
44 Haryana FP/HR/ROAD/40461/2019 9-HRB095-2019-CHA Diversion of 0.66 Hect. of forest land for construction of New Road from Bilaspur-Ambwala Road to Shamshan Ghat Bilaspur K.M. 0 to 0.57 in Distt. Yamuna Nagar (CM Announcement Code 23332) Road PWD B AND R HARYANA 0.66 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 22 Oct 2019
Compliance Report Submitted by User Agency on : 18 May 2020
45 Haryana FP/HR/Approach/33656/2018 9-HRB219-2018-CHA Diversion of 0.007624 Hectare of Forest Land for construction of proposed path for M/s Dhanraj Computerized Dharam Kanta situated on Tohana Road, R/Side, Village Dharodi, Tehsil Narwana, District Jind (Haryana). Approach Access DHANRAJ TRADING COMPANY 0.007624 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 27 Dec 2018
Compliance Report Submitted by User Agency on : 26 Mar 2019
16 Apr 2019
46 Haryana FP/HR/RAIL/33914/2018 9-HRB156-2018-CHA ROB at village Mamariya Thethar by dfccil,Mamariya Thethar to nagal mundi km/0-1 LHS&RHS Railway DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA 0.64 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 06 Sep 2018
Compliance Report Submitted by User Agency on : 09 Oct 2018
01 Nov 2018
47 Haryana FP/HR/Approach/33935/2018 9-HRB161-2018-CHA This is a proposal of diversion of forest land for access to Homemade Baker’s (India) Limited on Sonipat - Ganaur Road (ODR), Near Km Stone no. 06, at Village Kami, Tehsil & Distt. Sonipat (Haryana). Approach Access HOMEMADE BAKERS INDIA LIMITED 0.0122 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 10 Sep 2018
Compliance Report Submitted by User Agency on : 21 Nov 2018
09 Jan 2019
48 Haryana FP/HR/TRANS/33919/2018 9-HRB043-2019-CHA PROPOSAL FOR DIVERSION OF FOREST LAND FOR ERECTION OF 132 KV S/C LINE ON D/C TOWERS FROM 132 KV S/STN CHANDER KHURD TO 132 KV TSS JAKHAL Transmission Line HARYANA VIDYUT PRASARAN NIGAM LTD 0.35964 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 22 Aug 2019
Compliance Report Submitted by User Agency on : 30 Dec 2019
07 Jan 2020
49 Haryana FP/HR/Others/19757/2016 5368 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 56//25, 57//19/2, 21, 22 ON BHIWANI CITY BETWEEN MEHAM GATE TO HARYANA PRAKRITIK CHIKITSALAYA ON BHIWANI-MEHAM ROAD, VILLAGE-KALUWAS, TEHSIL-BHIWANI, DISTRICT-BHIWANI Others INDIAN OIL CORPORATION LTD 0.014384 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2016
Stage-I Approval on : 30 Jul 2016
Compliance Report Submitted by User Agency on : 18 Jul 2016
25 Jul 2016
50 Haryana FP/HR/Others/19764/2016 9-HRB112-2016-CHA Prposed Path for our new Essar Oil Limited's Fueling Station on Karnal=Kachwa-Sambhli-Kaul-Pehowa Road, Near KM. Stone 12 at Village Kachwa, Tehsil & District Karnal (Haryana). Others Essar Oil Limited 0.0115 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2016
Stage-I Approval on : 15 Dec 2016
Compliance Report Submitted by User Agency on : 29 Dec 2016
18 Jan 2017