Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Maharashtra
|
FP/MH/ROAD/148478/2021
|
FLD-1922/CR-152/F-10
|
Diversion of Forest Land for construction of Palasdev- Malwadi- Bhawdi- Varkute to Karewadi to Kalthan No. 1 MDR 171 from Chainage Km. 5/829 to Km. 6/300.
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.37672
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
29 May 2025
|
2
|
Maharashtra
|
FP/MH/ROAD/148484/2021
|
FLD-2022/CR-159/F-10
|
Diversion of Forest Land for construction of Walchandnagar- Anthurne- Shelgaon- Vyahali- Kauthali MDR 76 from Chainage Km. 25/000 to Km. 26/540
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.6583
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
24 Apr 2025
|
3
|
Maharashtra
|
FP/MH/ROAD/148490/2021
|
FLD-1922/CR153/F-10
|
Diversion of Forest Land for construction of Palasdev- Nhavi- Vyahli Road MDR 190 from Chainage Km. 1/485 to Km. 2/256 and 3/330 to Km. 3/630
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.96363
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
24 Apr 2025
|
4
|
Maharashtra
|
FP/MH/ROAD/148480/2021
|
FLD-2022/CR-161/F-10
|
Diversion of Forest Land for construction of Shelgaon Telodha- Gotondi- Pitkeshwar- Kati- MDR 192 from Chainage Km. 4/000 to Km. 4/150 and form Km 10/200 to Km 11/400.
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.99358
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
24 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
26 Mar 2025
|
5
|
Maharashtra
|
FP/MH/Others/21131/2016
|
FLD-12A18/CR-301/F-10
|
Dahanu Spurline
|
Others
|
GUJARAT GAS LIMITED
|
0.2227
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2016
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
29 Mar 2024
|
|
|
|
25 Sep 2024
|
6
|
Maharashtra
|
FP/MH/WATER/119403/2021
|
FLD-2022/C.R.59/F-10
|
Construction Of Water Tank At Walhe
|
Drinking Water
|
GRAMPANCHAYAT WALHE
|
0.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2021
|
Stage-I Approval on
|
:
|
09 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2024
|
|
|
|
08 Feb 2024
|
7
|
Maharashtra
|
FP/MH/OFC/156905/2022
|
FLD-2022/CR-271/F-10
|
Proposal for diversion of forest land for laying Optical Fiber Cable within RoW of the existing Road of SH-337 (Pauni to Nagpur Bhandara district border in District Nagpur in the State of Maharashtr
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LIMITED
|
0.4232
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2022
|
Stage-I Approval on
|
:
|
23 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2023
|
|
|
|
05 Feb 2024
|
8
|
Maharashtra
|
FP/MH/Pipeline/147671/2021
|
FLD-1323/CR107/F-10
|
Diversion of 0.0085 Ha Reserved Forest for Laying 10” Dia LPG Underground Pipeline along with OFC by BPCLin Taluka Khalapur & Panvel in District Raigad- Maharashtra
|
Pipeline
|
BHARAT PETROLEUM CORPORATION LIMITED MAHUL RASAYANI PIPELINE
|
0.0085
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2022
|
Stage-I Approval on
|
:
|
16 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2023
|
|
|
|
05 Feb 2024
|
9
|
Maharashtra
|
FP/MH/OFC/155104/2022
|
FLD-2022/C.R.276/F-10
|
Proposal for diversion of forest land for laying Optical Fiber Cable from Mansar to Khawasa (MH/MP Border) in Nagpur District in the state of Maharashtra.
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LIMITED
|
1.2081
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
18 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2023
|
|
|
|
03 Jan 2024
|
10
|
Maharashtra
|
FP/MH/OFC/155250/2022
|
FLD-2022/CR-277/F-10
|
Proposal for diversion of forest land for laying Optical Fiber Cable from Kondhali-Sawali Kh in Nagpur and Wardha District in the state of Maharashtra.
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LIMITED
|
0.37866
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
Stage-I Approval on
|
:
|
01 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2023
|
|
|
|
28 Dec 2023
|
11
|
Maharashtra
|
FP/MH/Pipeline/45038/2020
|
FLD-2323/CR.51/F-10
|
HPOIL Gas Private Limited, Kolhapur GA, From Tamdalge to Jaysingur-Agar Phata, Shirol
|
Pipeline
|
HPOIL GAS PRIVATE LIMITED
|
0.0274
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2020
|
Stage-I Approval on
|
:
|
08 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Sep 2023
|
|
|
|
16 Nov 2023
|
12
|
Maharashtra
|
FP/MH/Others/23102/2016
|
FLD-12A19/CR-01/F-10
|
WADA SPURLINE
|
Others
|
GUJARAT GAS LIMITED
|
0.1921
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Dec 2016
|
Stage-I Approval on
|
:
|
27 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2022
|
|
|
|
08 Nov 2023
|
13
|
Maharashtra
|
FP/MH/Pipeline/43177/2019
|
FLD-2323/C.R.55/F-10
|
Bharat Gas Resources Limited-Sangli & Satara GA. From Mauje Vadagoan (Kolhapur) to Vele ( Satara)
|
Pipeline
|
BHARAT GAS RESOURCES LIMITED
|
0.0979
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Dec 2019
|
Stage-I Approval on
|
:
|
27 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Apr 2023
|
|
|
|
15 Sep 2023
|
14
|
Maharashtra
|
FP/MH/Others/153622/2022
|
FLD-3223/CR.126/F-10
|
Yavatmal Water Supply Scheme Under Amrut Abhiyan . Shifting of 3 Core x 185 Sqmm XLPE Ubder ground twin cable from forest are to private area.
|
Others
|
MAHARASHTRA JEEVAN PRADHIKARAN
|
0.0847
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jul 2022
|
Stage-I Approval on
|
:
|
16 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2023
|
|
|
|
13 Sep 2023
|
15
|
Maharashtra
|
FP/MH/OFC/156907/2022
|
FLD-2022/C.R.334/F-10
|
Proposal for diversion of forest land for laying Optical Fiber Cable within RoW of the existing Road of SH-337 and SH-356 from Nagpur/Bhandara district border to Chicholi in District Bhandara in the State of Maharashtra.
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LIMITED
|
1.043
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2022
|
Stage-I Approval on
|
:
|
23 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
06 Sep 2023
|
16
|
Maharashtra
|
FP/MH/OFC/45822/2020
|
FLD-1923/C.R.01/F-10
|
Diversion of forest land for laying of OFC duct & cable within RoW of existing road Loni kalbhor to Tekawadi , road passing through forest at villafe Dalimb, Bori Aindi, Tamhanwadi, Tal. Daund, & vi
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.3225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2020
|
Stage-I Approval on
|
:
|
10 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2023
|
|
|
|
06 Sep 2023
|
17
|
Maharashtra
|
FP/MH/OFC/39510/2019
|
FLD-2022/CR-114/F-10
|
Diversion of forest land for laying of underground OFC duct & cabal within ROW of existing road passing through forest land at tathavada & Pangarkhel, Dist. Satara
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.551
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2019
|
Stage-I Approval on
|
:
|
17 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2023
|
|
|
|
05 Sep 2023
|
18
|
Maharashtra
|
FP/MH/OFC/147720/2021
|
FLD-2022/CR-110/F-10
|
Diversion of forest land for laying of OFC cable within Row of existing road SH 124 Road from Shamgaon to Vagheri Tal Karad, Road passing through forest at Shamgaon, Antawadi,, Vagheri, Tal. Karad Dis
|
Optical Fibre Cable
|
M/S DINESH ENGINEERS LTD
|
0.276
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2021
|
Stage-I Approval on
|
:
|
16 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
05 Sep 2023
|
19
|
Maharashtra
|
FP/MH/OFC/142289/2021
|
FLD-2022/C.R.117/F-10
|
Diversion of forest land for laying of underground OFC duct & cable within RoW of existing road MDR 17 kalamgaon to Kumbhroshi, Tal. Mahableshwer , Dist Satara
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.853
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2021
|
Stage-I Approval on
|
:
|
24 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2023
|
|
|
|
25 Jul 2023
|
20
|
Maharashtra
|
FP/MH/OFC/148723/2021
|
FLD-2022/CR-210/F-10
|
M/S Telesonic Networks Ltd to provide high speed internet connectivity at Village-Vatambe, Mukawale, Machutar, Shindola. Taluka-Jawali & Mahabaleshwar, District-Satara (Satara-Mahabaleshwar route 1.007 Ha)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
1.007
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2021
|
Stage-I Approval on
|
:
|
13 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2023
|
|
|
|
12 Jul 2023
|
21
|
Maharashtra
|
FP/MH/OFC/88085/2020
|
FLD-2322/CR-204/F-10
|
M/S Telesonic Networks Ltd to provide high speed internet connectivity at village-Beleghol , Taluka-Kagal District-Kolhapur (Hukkeri-Mudol route 0.082703 Ha)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.0827
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2020
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2023
|
|
|
|
12 Jul 2023
|
22
|
Maharashtra
|
FP/MH/OFC/40485/2019
|
FLD-2022/CR-146/F-10
|
Diversion of forest land for laying of underground OFC cable within ROW of existing road passing through forest at Anuskura Mosum, Manjre, Padharepani Panundre, , Tal. Shahuwadi Dist Kolhapur
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.831
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2019
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2023
|
|
|
|
12 Jul 2023
|
23
|
Maharashtra
|
FP/MH/OFC/149804/2021
|
FLD-2022/C.R.279/F-10
|
Diversion of 0.112 ha forest land from G no 84 C. no 150 at village Kumbharli, Tal. Savanwadi for laying of underground OFC duct & cable within Row of existing road SH 185, Savanwadi to Kumbharli u
|
Optical Fibre Cable
|
JIO DIGITAL LIFE, RELIANCE JIO INFOCOMM LTD. PUNE
|
0.112
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2021
|
Stage-I Approval on
|
:
|
23 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2023
|
|
|
|
04 Jul 2023
|
24
|
Maharashtra
|
FP/MH/OFC/148724/2021
|
FLD-2022/CR.140/F-10
|
M/S Telesonic Networks Ltd to provide high speed internet connectivity at vill-Palashi, Tal-Maan, Dist-Satara (Phaltan-Mhaswad route 0.15 Ha)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2021
|
Stage-I Approval on
|
:
|
30 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2023
|
|
|
|
23 Jun 2023
|
25
|
Maharashtra
|
FP/MH/OFC/152436/2022
|
FLD-2022/CR-281/F-10
|
M/S Telesonic Networks Ltd to provide high speed internet connectivity at village-Kharsundi & Balwadi, Taluka-Atpadi & Khanapur, District-Sangli (Mhaswad-Bhivghat route 0.28 Ha)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2022
|
Stage-I Approval on
|
:
|
28 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2023
|
|
|
|
22 Jun 2023
|
26
|
Maharashtra
|
FP/MH/ROAD/124967/2021
|
FLD-1322/CR-172/F-10
|
Widening of Existing NH4B, NH348A to 6/8 lanes on the boundaries of proposed Navi Mumbai International Airport and JNPT: Connectivity between NH348B and NH348
|
Road
|
National Highways Authority of India
|
0.5669
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2021
|
Stage-I Approval on
|
:
|
24 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Apr 2023
|
|
|
|
08 May 2023
|
27
|
Maharashtra
|
FP/MH/Others/32915/2018
|
FLD-2021/CR232/F-10
|
Yavatmal-Pandhari-Kolambi Phata-Ghatanji on MSH300 from KM 130/00 to KM 144/400
|
Others
|
RJIL
|
0.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2018
|
Stage-I Approval on
|
:
|
03 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2023
|
|
|
|
27 Mar 2023
|
28
|
Maharashtra
|
FP/MH/Pipeline/151190/2022
|
FLD-1922/C.R.169/F-10
|
Diversion of Forest Land for laying underground CNG Pipeline from Nhavare to Bori Pardhi
|
Pipeline
|
TORRENT GAS PUNE LIMITED, PUNE
|
0.0468
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2022
|
Stage-I Approval on
|
:
|
13 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
10 Mar 2023
|
29
|
Maharashtra
|
FP/MH/Pipeline/149337/2021
|
FLD-2022/CR-120/F-10
|
Diversion of Forest Land for laying underground CNG Pipeline between Vasunde Phata- Baramati
|
Pipeline
|
TORRENT GAS PUNE LIMITED, PUNE
|
0.053
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
Stage-I Approval on
|
:
|
08 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
09 Mar 2023
|
30
|
Maharashtra
|
FP/MH/Pipeline/148744/2021
|
FLD-2022/CR-128/F-10
|
Diversion of 0.2740 Ha. of Forest Land for laying underground CNG Pipeline between Daund- Kurkumbh- Gunjkheda Junction
|
Pipeline
|
TORRENT GAS PUNE LIMITED, PUNE
|
0.274
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2021
|
Stage-I Approval on
|
:
|
08 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
09 Mar 2023
|
31
|
Maharashtra
|
FP/MH/Pipeline/147978/2021
|
FLD-1922/CR-164/F-10
|
Diversion of Forest Land for laying underground CNG Pipeline from Wagholi to Shirur
|
Pipeline
|
TORRENT GAS PUNE LIMITED, PUNE
|
0.02925
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Oct 2021
|
Stage-I Approval on
|
:
|
08 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
09 Mar 2023
|
32
|
Maharashtra
|
FP/MH/TRANS/43305/2019
|
FLD-12A22/CR.176/F-10
|
Construction of Lilo on Existing 220KV Boisar Nallasopara Transmission line for Palghar Substation
|
Transmission Line
|
MAHATRANSCO
|
0.7
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2019
|
Stage-I Approval on
|
:
|
08 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Oct 2022
|
|
|
|
28 Feb 2023
|
33
|
Maharashtra
|
FP/MH/Others/33099/2018
|
FLD-3220/CR46/F-10
|
laying of OFC in Ghatanji to Inzala on SH267 from KM 8/100 to KM 12/400 forest area
|
Others
|
RJIL
|
0.102
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2018
|
Stage-I Approval on
|
:
|
29 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2023
|
|
|
|
27 Feb 2023
|
34
|
Maharashtra
|
FP/MH/OFC/148432/2021
|
FLD-2022/CR-70/F-10
|
Divertion of forest land for laying underground OFC duct & cable Within ROW of existing Road Vr 123 &Vr. 8
|
Optical Fibre Cable
|
JIO DIGITAL LIFE, RELIANCE JIO INFOCOMM LTD. PUNE
|
0.338
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2021
|
Stage-I Approval on
|
:
|
26 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
16 Dec 2022
|
35
|
Maharashtra
|
FP/MH/OFC/40322/2019
|
FLD-2022/CR-68/F-10
|
Laying of OFc Cable within ROW of existing Road Kas to Kalamgaon, road passing through forest land at Kas, Phalni, Andhari, & Bamnoli, in Dist. Satara
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.4993
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2019
|
Stage-I Approval on
|
:
|
27 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
16 Dec 2022
|
36
|
Maharashtra
|
FP/MH/OFC/41218/2019
|
FLD-2022/CR-84/F-10
|
Diversion of forest land for laying of OFC cable within ROW of existing road S. H 189 passing through forest land at Village Belewadi Hubalgi, Dhamne, Tal. Ajara, Dist. - Kolhapur.
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.1295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2019
|
Stage-I Approval on
|
:
|
12 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
16 Dec 2022
|
37
|
Maharashtra
|
FP/MH/OFC/142292/2021
|
FLD-2022/CR-105/F-10
|
Diversion of forest land for laying of OFC duct & cable within RoW of existing road SH 145, 143, MDR 45 , Mayni to Mhaswad, Road passing through forest land at Kukudwad, Tal Man, Dist, Satara,,
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.119
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2021
|
Stage-I Approval on
|
:
|
26 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
16 Dec 2022
|
38
|
Maharashtra
|
FP/MH/OFC/148433/2021
|
FLD-2022/CR-92/F-10
|
Diversion of forest land for laying underground OFC duct & cable Within ROW of existing Road.Road passing through forest land at village-Vagheri, Antwadi,& Shamgaon, Tal.Karad,Dist.Satara.
|
Optical Fibre Cable
|
JIO DIGITAL LIFE, RELIANCE JIO INFOCOMM LTD. PUNE
|
0.278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Oct 2021
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2022
|
|
|
|
16 Dec 2022
|
39
|
Maharashtra
|
FP/MH/OFC/141702/2021
|
FLD-2022/CR-76/F-10
|
Diversion of forest land for laying of underground zofc ducts & cable within Row of existing road SH 124,S.H 60 , MDR 13 passing through forest land at village Wavarhire, Shingnapu, Tal. Man , & Vil
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.132
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2021
|
Stage-I Approval on
|
:
|
27 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
16 Dec 2022
|
40
|
Maharashtra
|
FP/MH/OFC/139679/2021
|
FLD-2022/CR23/F-10
|
Proposal for diversion of forest land for Laying Optical Fiber Cable of Telesonic Network Limited Project along the NH-6 (Wadi-Karanja-Tivsa) Km. Ch. 50/000 To 100/000) in district Wardha in the State
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.17657
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2021
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2022
|
|
|
|
23 Nov 2022
|
41
|
Maharashtra
|
FP/MH/OFC/138444/2021
|
FLD-2022/CR-96/F-10
|
Laying Optical Fiber Cable along the SH-366 from Ch.8/00 (Bondgaon Devi Chowk) to 17/00 (Arjuni Railway Crossing) and SH-354 along the Ch. 40/00 to 47/500 & 48/500 To 48/700 (Hanumanji Mandir Arjuni To last mile stone Towards Lakhandur) in GONDIA district.
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.26303
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2021
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2022
|
|
|
|
23 Nov 2022
|
42
|
Maharashtra
|
FP/MH/OFC/120838/2021
|
FLD-2022/CR26/F-10
|
Laying of Optical Fiber Cable of Telesonic Network Limited 4G Project on SH-358 (Dighori to Bhondevi Km. Ch. 0/00 to Km. 2200/00) and On SH-354 Lakhandur to Dhabetekadi (Lakhanddur to Arjuni Road) Ch. Km. 0/00 to 7100/00) in Bhandara District of Maharashtra State.
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.8703
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2021
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2022
|
|
|
|
23 Nov 2022
|
43
|
Maharashtra
|
FP/MH/SubStation/40491/2019
|
FLD-2019/CR300/F-10
|
Construction of 33/11 KV Sub-Station at Chandrapur Forest Academy,Chandrapur
|
Sub Station
|
DIRECTOR CHANDRAPUR FOREST ACADEMY OF ADMINISTRATION DEVELOPMENT AND MANAGEMENT CHANDRAPUR
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jun 2019
|
Stage-I Approval on
|
:
|
31 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2021
|
|
|
|
24 Jun 2022
|
44
|
Maharashtra
|
FP/MH/Pipeline/42387/2019
|
FLD-1820/CR-182/F-10
|
Bharat Gas resources Limited- Ahmednagar & Aurangabad GA- Kedgaon-Supe Line
|
Pipeline
|
BHARAT GAS RESOURCES LIMITED
|
0.1
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Oct 2019
|
Stage-I Approval on
|
:
|
25 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2021
|
|
|
|
10 Jun 2022
|
45
|
Maharashtra
|
FP/MH/Others/22834/2016
|
FLD-12A18/CR-302/F-10
|
Virar Spurline
|
Others
|
GUJARAT GAS LIMITED
|
0.6818
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2016
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Nov 2020
|
|
|
|
10 Jun 2022
|
46
|
Maharashtra
|
FP/MH/OFC/39511/2019
|
FLD-2021/CR88/F-10
|
Proposal for diversion of forest land for laying of undergroud OFC duct and cable within ROw of existing road
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.285
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2019
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
05 Jan 2022
|
47
|
Maharashtra
|
FP/MH/OFC/40921/2019
|
FLD-2021/CR86/F-10
|
Diversion of forest land for laying of underground OFC cable within ROW of existing road passing through forest land at kasabe Thane ( Mahadikwadi) , Tal. Panhala, Dist, - Kolhapur
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.057
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2019
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
05 Jan 2022
|
48
|
Maharashtra
|
FP/MH/OFC/39512/2019
|
FLD-2021/CR.85/F-10
|
Diversion of forest land for laying of underground OFCduct & cable within ROW of existing road passing through forest at Rajapur, Palvan, Tondale ,Garadwadi(Ramoshi Vasti) in Dist. Satara
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.3985
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2019
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
05 Jan 2022
|
49
|
Maharashtra
|
FP/MH/OFC/39513/2019
|
FLD-2021/CR.87/F-10
|
Diversion of forest land for laying of underground OFC duct & cable withinROWof existing road passing through forest .
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.3975
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2019
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
05 Jan 2022
|
50
|
Maharashtra
|
FP/MH/OFC/40042/2019
|
FLD-2021/C.R.84/F-10
|
Proposal for diversion of forest land for laying of underground OFC cable within Row of existing road passing through forest at Medha, Kolghar, Andhari, Phalni, Kas Dist. Satara. ,
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOMM LTD. ERANDVANE PUNE
|
0.323
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2019
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
05 Jan 2022
|
|