Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/24593/2017 4-APC044/2017-CHN 220KV PORUMAMILLA LINE Transmission Line EE CONSTRUCTION KDP 6.34 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Apr 2017
Stage-I Approval on : 19 Jun 2019
Compliance Report Submitted by User Agency on : 14 Aug 2020
20 Sep 2022
2 Andhra Pradesh FP/AP/ROAD/147274/2021 4-APB143/2022-VIJ Diversion of 3.48 ha of forest land for Construction of six lane grade separated structure along with slip roads at KM 210+780 (ITC junction in Kurnool Town), KM 260+400 (kambalapadu junction, Dhone) Road National Highways Authority of India 3.48 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Sep 2021
Stage-I Approval on : 07 Feb 2022
Compliance Report Submitted by User Agency on : 20 Jun 2022
24 Aug 2022
3 Andhra Pradesh FP/AP/Others/30841/2017 4-APC066/2018-CHN Vijayawada-Dharmapuri Petroleum product Pipeline Project Others HINDUSTAN PETROLEUM CORPORATION LIMITED BANGALORE 16.57 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2017
Stage-I Approval on : 10 Sep 2018
Compliance Report Submitted by User Agency on : 11 Jan 2022
22 Aug 2022
4 Andhra Pradesh FP/AP/TRANS/27462/2017 4-APC084/2018-CHN Warangal (New) - Chilakaluripeta 756kV D/C Line Transmission Line WARORA KURNOOL TRANSMISSION LIMITED 18.86 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Aug 2017
Stage-I Approval on : 28 Nov 2018
Compliance Report Submitted by User Agency on : 18 Nov 2021
22 Aug 2022
5 Andhra Pradesh FP/AP/Pipeline/44624/2020 4-APB123/2021-VIJ Diversion of 0.1511 ha. of FL in compt. no.969 of Vempadu RF in Yelamanchili Range of Visakhapatnam Division for laying pipeline and construction of pump house in favour of M/s. DSR Biotech Hatcheries Pipeline M/S DSR BIOTECH HATCHERIES 0.1511 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Feb 2020
Stage-I Approval on : 08 Jul 2021
Compliance Report Submitted by User Agency on : 15 Feb 2022
22 Jul 2022
6 Andhra Pradesh FP/AP/ROAD/25731/2017 4-APC053/2017-CHN Rehabilitation and Up-gradation of Eeppurpalem - Ongole section from Km 195+000 to Km 254+500 of NH-214A (New NH-216). Road HIGHWAYS 10.64 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Apr 2017
Stage-I Approval on : 29 Jan 2018
Compliance Report Submitted by User Agency on : 15 Jul 2022
15 Jul 2022
7 Andhra Pradesh FP/AP/RAIL/32976/2018 4-APB064/2018-CHN TINDIVANAM - NAGARI NEW BROAD GAUGE RAILWAY LINE Railway DY CHIEF ENGINEER CONSTRUCTION TAMBARAM 4.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2018
Stage-I Approval on : 17 Jul 2018
Compliance Report Submitted by User Agency on : 24 Jun 2022
28 Jun 2022
8 Andhra Pradesh FP/AP/RAIL/42716/2019 4-APB104/2020-VIJ Raiway Tripling of Vijayavada to Gudur Railway RAIL VIKAS NIGAM LIMITED VIJAYAWADA 0.46 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2019
Stage-I Approval on : 22 Dec 2020
Compliance Report Submitted by User Agency on : 15 Feb 2022
27 Jun 2022
9 Andhra Pradesh FP/AP/ROAD/19911/2016 4-APC032/2017-CHN Roads & Buildings Department, EE, NH, Vijayawada. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 21.343 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2016
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 28 Mar 2022
28 Apr 2022
10 Andhra Pradesh FP/AP/ROAD/19784/2016 4-APC028/2017-CHN Roads & Buildings Department, EE, NH, Vijayawada. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 22.6388 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jun 2016
Stage-I Approval on : 07 Apr 2017
Compliance Report Submitted by User Agency on : 11 Mar 2022
05 Apr 2022
11 Andhra Pradesh FP/AP/Others/38959/2019 4-APB102/2020-CHN Diversion of forest land for erecting obstacle light mast for aviation purpose at Kadapa Airport Others AIRPORTS AUTHORITY OF INDIA, KADAPA 0.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jul 2019
Stage-I Approval on : 07 Dec 2020
Compliance Report Submitted by User Agency on : 13 Jan 2022
21 Feb 2022
12 Andhra Pradesh FP/AP/Pipeline/42672/2019 4-APB124/2021-VIJ Laying of 20 inch gas Pipeline (about 31 km) from Offshore Platform to Onshore gas Terminal at Mallavaram Pipeline ONGC 3.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Oct 2019
Stage-I Approval on : 17 Sep 2021
Compliance Report Submitted by User Agency on : 28 Oct 2021
10 Feb 2022
13 Andhra Pradesh FP/AP/ROAD/64525/2020 4-APB125/2021-VIJ Diversion of 0.85 Ha of forest land in Compartment no-132,Tadepalli RF,Guntur division,for providing BT surface to the road from Brhamanandapuram Crurch to AIIMS road in f/o Municipal Commissioner,Ta Road COMMISSIONER ,TADEPALLI MUNICIPALITY 0.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 18 Aug 2021
Compliance Report Submitted by User Agency on : 02 Feb 2022
07 Feb 2022
14 Andhra Pradesh FP/AP/Pipeline/42197/2019 4-APB130/2021-VIJ Pipeline to eastablish Avanti feeds Pipeline AVANTI FEEDS LIMITED 0.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2019
Stage-I Approval on : 18 Aug 2021
Compliance Report Submitted by User Agency on : 03 Jan 2022
07 Feb 2022
15 Andhra Pradesh FP/AP/ROAD/22175/2016 4-TSC030/2017-CHN Upgradation of NH-565 from Km.361/327 to Km.420/800 (Dornlala T Junction to Penchalakona section ) to two lane with paved shoulders in the state of Andhra Pradesh under NHDP-IV. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 33.459 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Nov 2016
Stage-I Approval on : 09 Jun 2017
Compliance Report Submitted by User Agency on : 18 Jul 2021
11 Jan 2022
16 Andhra Pradesh FP/AP/ROAD/30975/2017 4-APB063/2018-CHN Relaying of Visakha Valley School Road from NH-16 Jn., to Beach Road, Visakhapatnam Road BOIDI SESHARAO 1.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2018
Stage-I Approval on : 06 Jul 2018
Compliance Report Submitted by User Agency on : 22 Nov 2021
10 Jan 2022
17 Andhra Pradesh FP/AP/Pipeline/40930/2019 4-APB105/2020-VIJ This Cement plant was started in 2008.We require 0.11 Ha of Forest land for diversion in Comp No 98,Tangrda RF Guntur Division. Pipeline BHAVYA CEMENTS LIMITED 0.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jul 2019
Stage-I Approval on : 03 Mar 2021
Compliance Report Submitted by User Agency on : 16 Jul 2021
19 Nov 2021
18 Andhra Pradesh FP/AP/ROAD/26219/2017 4-APB046/2017-CHN Upgradation of NH-18 from Km 108/850 to 160/200 i.e from Rayachoty to Kadapa to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 1.81 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 19 Dec 2020
12 Oct 2021
19 Andhra Pradesh FP/AP/Others/14653/2015 4-APB015/2016-CHN Sagarnagar beach front(opposite senora hotel) development Others AP TOURISM DEVELOPMENT CORPORATION 0.97 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2015
Stage-I Approval on : 14 May 2018
Compliance Report Submitted by User Agency on : 07 Feb 2020
23 Sep 2021
20 Andhra Pradesh FP/AP/Others/14660/2015 4-APB016/2016-CHN yendada beach front(opposite blind School) development Others AP TOURISM DEVELOPMENT CORPORATION 0.98 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2015
Stage-I Approval on : 15 May 2018
Compliance Report Submitted by User Agency on : 07 Feb 2020
23 Sep 2021
21 Andhra Pradesh FP/AP/ROAD/29446/2017 4-APB052/2017-CHN Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh. (3.93 Ha) Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 3.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Sep 2017
Stage-I Approval on : 04 Dec 2017
Compliance Report Submitted by User Agency on : 03 Sep 2021
23 Sep 2021
22 Andhra Pradesh FP/AP/ROAD/26857/2017 4-APB048/2017-CHN Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 2.03 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jul 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 03 Sep 2021
23 Sep 2021
23 Andhra Pradesh FP/AP/RAIL/17757/2016 4-APA013/2016-CHN Construction of New BG Railway line between Nadikudiand Srikalahasti Stations. Railway DEPUTY CHIEF PROJECT MANAGER WORLD CLASS 118.725 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2016
Stage-I Approval on : 20 Jul 2016
Compliance Report Submitted by User Agency on : 04 Aug 2021
30 Jul 2021
24 Andhra Pradesh FP/AP/ROAD/26324/2017 4-APB050/2017-CHN Upgradation of NH-67 from Km 589/000 to 641/000 i.e from Mydukur to Dornala’T’ junction to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 2.55 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2017
Stage-I Approval on : 06 Sep 2018
Compliance Report Submitted by User Agency on : 17 Dec 2020
02 Jul 2021
25 Andhra Pradesh FP/AP/TRANS/29528/2017 4-APC057/2018-CHN Construction of 400 KV Double Circuit line from Kadapa to Madhugiri (Karnataka) Power Transmission Line. Transmission Line POWER SYSTEM SOUTHERN INTERCONNECTOR TRANSMISSION SYSTEM LIMITED 21.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Oct 2017
Stage-I Approval on : 05 Apr 2018
Compliance Report Submitted by User Agency on : 22 Mar 2021
06 Apr 2021
26 Andhra Pradesh FP/AP/TRANS/31686/2018 4-APA065/2018-CHN Construction of 800kv HVDC Raigarh-Pugulur Transmission line in Kurnool, Kadapa and Chittoor Dists, 64.23 Ha Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 64.23 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Feb 2018
Stage-I Approval on : 10 Sep 2018
Compliance Report Submitted by User Agency on : 22 Mar 2021
06 Apr 2021
27 Andhra Pradesh FP/AP/TRANS/14620/2015 4-APC027/2016-CHN 400 KV D/C Hindupur to Kadapa Power Transmission Line. Transmission Line POWER GRID CORPORATION OF INDIA LTD 24.204 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Dec 2015
Stage-I Approval on : 17 Feb 2017
Compliance Report Submitted by User Agency on : 27 Feb 2020
03 Feb 2021
28 Andhra Pradesh FP/AP/TRANS/26388/2017 4-APA056/2018-CHN 765 KV Double Circuit line from Chilakaluripeta to Kadapa. Transmission Line POWER SYSTEM SOUTHERN INTERCONNECTOR TRANSMISSION SYSTEM LIMITED 74.486 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2017
Stage-I Approval on : 05 Apr 2018
Compliance Report Submitted by User Agency on : 28 Feb 2020
03 Feb 2021
29 Andhra Pradesh FP/AP/QRY/30414/2017 4-APB082/2018-CHN GMR Stone Crusher Quarrying GMR CRUSHERS 2.59 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Feb 2018
Stage-I Approval on : 24 Jan 2019
Compliance Report Submitted by User Agency on : 11 Nov 2020
22 Dec 2020
30 Andhra Pradesh FP/AP/Others/31941/2018 4-APB078/2018-CHN Diversion of 4.88 Ha of forest land in Compt. No. 336, 337 of Penukonda RF for establishment of Lakshmi Narasimha Swamy Temple Others CHAIRMAN AND PRESIDENT 4.88 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2018
Stage-I Approval on : 17 Oct 2018
Compliance Report Submitted by User Agency on : 01 May 2019
22 Dec 2020
31 Andhra Pradesh FP/AP/QRY/26772/2017 4-APB076/2018-CHN Mining Proposal in favour of M/s Venkateswara Rocks,Chittoor District., Prop: P. Sudhakar Reddy. Quarrying MS VENKATESWARA ROCKS 4.69 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2017
Stage-I Approval on : 12 Nov 2018
Compliance Report Submitted by User Agency on : 16 Oct 2019
07 Feb 2020
32 Andhra Pradesh FP/AP/Others/33635/2018 4-APB079/2018-CHN Diversion of 0.39 Ha of forest land for construction of Percolation Tank in Sy. No. 901, Compt. No. 487 of Tarimela RF of Singanamala mandal of Ananthapuramu District in Ananthapuramu Range of Ananthapuramu Division in favour of Technical Director, Rural Development Trust, Ananthapuramu. Others RURAL DEVELOPMENT TRUST ANANTHAPURAMU 0.39 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2018
Stage-I Approval on : 25 Oct 2018
Compliance Report Submitted by User Agency on : 30 Apr 2019
04 Jun 2019
33 Andhra Pradesh FP/AP/IND/30241/2017 4-APB061/2018-CHN Diversion of 0.733 Ha. for laying of pipelines for KG-DWN-98/2 project Industry ONGC 0.733 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Nov 2017
Stage-I Approval on : 25 Jun 2018
Compliance Report Submitted by User Agency on : 04 Dec 2018
07 May 2019
34 Andhra Pradesh FP/AP/TRANS/27639/2017 4-APC042/2017-CHN LILO of 765 KV D/C Kurnool-Tiruvelam Power Transmission line at Kadapa. Transmission Line POWER GRID CORPORATION OF INDIA LTD 36.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Aug 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 20 Feb 2019
09 Apr 2019
35 Andhra Pradesh FP/AP/MIN/30265/2017 4-APB062/2018-CHN Ellutla Barytes Mine of JC Vijaya Mining JC VIJAYA ELLUTLA BARYTES MINE 1.95 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2018
Stage-I Approval on : 21 Aug 2018
Compliance Report Submitted by User Agency on : 12 Oct 2018
02 Nov 2018
36 Andhra Pradesh FP/AP/QRY/26282/2017 4-APC051/2017-CHN Mining Proposal in favour of S.S.Granites,Chittoor District., Prop: P. Suryanarayana Reddy Quarrying P SURYANARAYANA REDDY 9.16 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jun 2017
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 16 Jul 2018
09 Aug 2018
37 Andhra Pradesh FP/AP/IRRIG/16627/2015 4-APB019-2016-CHN Tarakarama Thirtha Sagaram Reservoir Project Irrigation WATER RESOURCES DEPARTMENT 4.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Nov 2015
Stage-I Approval on : 01 Nov 2016
Compliance Report Submitted by User Agency on : 19 Jul 2018
10 Jul 2018
38 Andhra Pradesh FP/AP/Others/26189/2017 4-APB037/2017-CHN 132/33KV Sub-Station AIIMS Others EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 May 2017
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 26 Jun 2018
25 Jun 2018
39 Andhra Pradesh FP/AP/ROAD/19123/2016 4-APB017/2016-CHN Upgradation of NH-67 from Km.695/000 to Km.741/950 (Atmakur to Nellore ) under NHDP-IV Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 2.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 May 2016
Stage-I Approval on : 20 Sep 2016
Compliance Report Submitted by User Agency on : 17 Jul 2017
04 Aug 2017
40 Andhra Pradesh FP/AP/IND/10371/2015 4-APB010/2015-CHN Development of Vashishta and S1 Deepwater Project Industry ONGC 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 21 Aug 2015
Compliance Report Submitted by User Agency on : 29 Sep 2016
09 Jan 2017
41 Andhra Pradesh FP/AP/Others/14866/2015 4-APB008/2015-CHN Peddavora to Macharla OFC Project, Idea Cellular Ltd - 0.30 Ha. Others IDEA CELLULAR LIMITED 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2015
Stage-I Approval on : 08 Jan 2016
Compliance Report Submitted by User Agency on : 04 Jul 2016
14 Jun 2016