Ministry of Environment,Forest and Climate Change
Government of India
Uttar Pradesh
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttar Pradesh FP/UP/Approach/52653/2020 8B/UP/06/291/2021/FC Proposed IOCL Retail Outlet on Bilrayan-Panwari Road(SH-21) In Km.24(Ch 23.410 to 23.445) at Gata No. No.407,Village:Barotha,Tehsil:Nighasan,District:Lakhimpur Kheri Approach Access INDIAN OIL COPERATION LIMITED 0.086211 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 14 Nov 2022
Compliance Report Submitted by User Agency on : 18 Jun 2025
26 Jun 2025
2 Uttar Pradesh FP/UP/TRANS/144301/2021 8B/UP/04/63/2022/FC CONSTRUCTION OF 33 KV ELECTRIC LINE FROM 220 KV SUB-STATION, BABINA-JHANSI TO 33/11 KV SUB-STATION M.E.S., BABINA, TOTAL KM- 6.110, UNDER ELECTRICITY SECONDARY WORKS DIVISION, JHANSI(DVVNL)-U.P. Transmission Line ELECTRICITY SECONDARY WORKS DIVISION DVVNL JHANSI 2.5035 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jul 2021
Stage-I Approval on : 14 Jun 2023
Compliance Report Submitted by User Agency on : 19 Jun 2025
26 Jun 2025
3 Uttar Pradesh FP/UP/Others/29655/2017 8B/UP/06/68/2021/FC Protected Forest Land Proposed to be diverted for Exit/Entry Approach to Sherwood College of Engineering Research and Technology on Lucknow-Faizabad Road in KM.18-19 Khasra No. 59,60,63,65,66,310,299,305,300,301,302,311,2869,2871,2876,294,298,304,287,308/526,309,Village:Dharsaniya in Barabanki District Others SHERWOOD COLLEGE EDUCATIONAL GROUP 0.063404 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Oct 2017
Stage-I Approval on : 17 Jan 2024
Compliance Report Submitted by User Agency on : 07 May 2025
30 May 2025
4 Uttar Pradesh FP/UP/ROAD/150997/2022 8B/UP/06/274/2022/FC Rehabilitation & up-gradation to four lane road from Km. 70.500 to 78.600 Km of NH-92 (new NH-719) under in District Etawah in the State of Uttar Pradesh (UP Portion) Road MORTH (NH-UP) 12.275 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2022
Stage-I Approval on : 31 May 2023
Compliance Report Submitted by User Agency on : 14 May 2025
28 May 2025
5 Uttar Pradesh FP/UP/Approach/157152/2022 8B/UP/06/178/2023/FC My Own Eco Energy Pvt. Ltd. Petrol Pump on Kushinagar to Hata Road NH-27 (Old NH-28) in Km.No. 310 (CH. No. 309.915, LHS) at Khasra No. 2Mi, 31, 3Mi and 4Mi, Village:-Chhapra Bhagat, Tehsil:-Hata, District:-Kushinagar. Approach Access MY WON ECO ENERGY PRIVATE LIMITED 0.17416 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2022
Stage-I Approval on : 12 Mar 2024
Compliance Report Submitted by User Agency on : 19 May 2025
28 May 2025
6 Uttar Pradesh FP/UP/TRANS/39285/2019 8B/UP/04/105/2019/FC Forest Land Proposed to be diverted for construction 765 kV S/C Ghatampur-Agra Transmission Line passing through Reserve forest land in Etawah, Firozabad & Agra Districts and Protected Forest land in Crossing NH-86 at Km. 57.147, SH-46 at Km. 24.487, Etawah- Branch of Lower Ganga Canal in Kanpur Nagar, NH-25 at Km. 1559.650 in Kanpur Dehat, SH-21 Transmission Line GHATAMPUR TRANSMISSION LIMITED 79.4992 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Mar 2019
Stage-I Approval on : 01 Jan 2020
Compliance Report Submitted by User Agency on : 16 Apr 2025
20 May 2025
7 Uttar Pradesh FP/UP/Others/141612/2021 8B/UP/06/213/2022/FC CCONSTRUCTION OF M/S IOCL MORADABAD BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE JYOTHI KHASRA NO. 24 ALONG NEHTAUR – HALDAUR ROAD (SH-12) KM 150-153 (RHS) TEHSIL DHAMPUR DISTRICT BIJNOR (U.P.) Others INDIAN OIL CORPORATION LIMITED 0.1954 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Apr 2021
Stage-I Approval on : 19 Jan 2023
Compliance Report Submitted by User Agency on : 29 Apr 2025
09 May 2025
8 Uttar Pradesh FP/UP/SCH/122782/2021 8B/UP/08/31/2022/FC WATER SUPPLY PIPE LINE FROM GUNAYI GAHARPUR TO JNV MEJA KHAS CAMPUS School NAVODAYA VIDYALAYA SAMITI 0.0311 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2021
Stage-I Approval on : 05 Dec 2023
Compliance Report Submitted by User Agency on : 25 Apr 2025
07 May 2025
9 Uttar Pradesh FP/UP/Others/26336/2017 8B/UP/06/250/2021/FC Ex-Post Facto Proposal 0.4368Protected Forest Land Proposed to be diverted for service land road to Om Residency developed by Neostar Reality Pvt.Ltd. and Ruhialkhand Projects Ltd. on NH-30(Old NH-24) Bareilly Shahjahanpur Road between KM.267-268, Ch. 267.640 (LHS) in Bareilly District Others NEO STAR REALTY PVT LTD 0.4368 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 May 2017
Stage-I Approval on : 15 Mar 2024
Compliance Report Submitted by User Agency on : 29 Jan 2025
11 Apr 2025
10 Uttar Pradesh FP/UP/Pipeline/115789/2020 P-85/81-2-2021-800(98)/2021 Forest Land Proposed to be diverted for laying of 4'', 6'', 8'', 10'' dia steel gas pipeline along Bareilly Mod to Pakka Pul from Ch. 0.00 to 4.00, Bareilly Mod- Pipraula Ahmadpur SH-29 from Ch. 469.0 Pipeline Hindustan Petroleum Corporation Limited 0.66 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2020
Stage-I Approval on : 04 Aug 2021
Compliance Report Submitted by User Agency on : 29 Jan 2025
10 Apr 2025
11 Uttar Pradesh FP/UP/Others/42798/2019 8B/UP/09/206/2022/FC Diversion proposal to lay Kandla-Gorakhpur LPG Pipeline -KGPL- (Unnao-Gorakhpur Section) pipeline through Unnao, Rae Bareli, Pratapgarh, Allahabad, Bhadohi, Varanasi, Jaunpur, Ghazipur, Azamgarh, Mau, Gorakhpur, Deoria and Lucknow Forest Divisions in Uttar Pradesh Others IHB LIMITED 3.9806 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Nov 2019
Stage-I Approval on : 29 Nov 2022
Compliance Report Submitted by User Agency on : 18 Mar 2025
07 Apr 2025
12 Uttar Pradesh FP/UP/Approach/145304/2021 8B/UP/06/01/2024/FC IOCL Retail Outlet on Bareilly-Shahjahanpur Road (NH-30/Old NH-24), In KM Stone No. 279 (CH: 278.543 RHS), At Gata No. 805, Village: Bakarganj, Tehsil-Faridpur, District: Bareilly Approach Access INDIAN OIL CORPORATION 0.187 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jul 2021
Stage-I Approval on : 21 May 2024
Compliance Report Submitted by User Agency on : 22 Mar 2025
07 Apr 2025
13 Uttar Pradesh FP/UP/Approach/153494/2022 8B/UP/06/123/2023/FC Proposed BPCL Retail Outlet on Deoria-Kasia Road (SH-79) Near Km. Stone No. 16 (LHS) at Khasra No. – 1034, Village:-Sirwaniya, Tehsil:-Deoria, District:-Deoria Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.071528 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Mar 2022
Stage-I Approval on : 12 Mar 2024
Compliance Report Submitted by User Agency on : 20 Mar 2025
07 Apr 2025
14 Uttar Pradesh FP/UP/Approach/157266/2022 157262 PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND ON SADABAD-JALESAR ROAD (SH-122) LHS, KM STONE NO-49, CH. 48.633, AT KHASRA NO.- 1096(MI), VILLAGE-SAHPAU, TEHSIL- SADABAD, DISTRICT- HATHRAS, FOR THE CONSTRUCTION OF APPROACH TO PROPOSED HPCL NRO Approach Access HPCL AGRA RO 0.0781246 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jun 2022
Stage-I Approval on : 19 Feb 2025
Compliance Report Submitted by User Agency on : 21 Mar 2025
25 Mar 2025
15 Uttar Pradesh FP/UP/Approach/139274/2021 8B/UP/06/179/2023/FC Diversion of forest land for construction of Petrol Pump at Khara No. 1643(?) of Bagadpur Village of Garhmukteshwar Tehsil in Hapur District of Uttar Pradesh State (LHS of NH-24, Chainage from 92.023 Km to 92.068 Km of NH24) Approach Access HPCL MEERUT 0.2544 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Apr 2021
Stage-I Approval on : 15 May 2024
Compliance Report Submitted by User Agency on : 17 Feb 2025
10 Mar 2025
16 Uttar Pradesh FP/UP/ROAD/41969/2019 8B/UP/06/85/2020/FC Widening and Strengthening of Chikasi-Hamirpur Road(Bilyaya-Panwari Road SH-21) from Ch.430.00 to 442.100 in Hamirpur District and From Ch.442.100 to 448.680 in Mahoba District Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR 41.724 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Sep 2019
Stage-I Approval on : 15 Dec 2020
Compliance Report Submitted by User Agency on : 22 Oct 2024
21 Feb 2025
17 Uttar Pradesh FP/UP/Approach/153459/2022 8B/UP/06/136/2023/FC Proposed HPCL Retail Outlet on Delhi-Bareilly-Lucknow Road NH-24 (City Road) In Km. No. 163 (CH. No. 162.863, LHS) At Gata No–112Mi, 113Mi & 114/1Mi, Village:- Mustafabad Mustakam, Tehsil:-Moradabad,Dist:Moradabad Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.065918 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Mar 2022
Stage-I Approval on : 29 Dec 2023
Compliance Report Submitted by User Agency on : 26 Dec 2024
19 Feb 2025
18 Uttar Pradesh FP/UP/ROAD/156081/2022 8B/UP/06/42/2023/FC DIVERSION OF 0.8768040 HECTARE PROTECTED FOREST LAND FOR CONSTRUCTION OF FOUR LANE BYPASS ROAD FROM NH-709B (CHUNEHTI), TO DELHI YAMUNOTRI ROAD (SH-57) Via AMBLA ROAD FROM KM CHAINAGE 00.000 TO KM CHAINAGE 19.125(LENGTH 19.125) IN DISTRICT-SAHARANPUR (UTTARPRADESH). Road PUBLIC WORKS DEPARTMENT SAHARANPUR 0.876804 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jun 2022
Stage-I Approval on : 05 Aug 2024
Compliance Report Submitted by User Agency on : 29 Nov 2024
31 Dec 2024
19 Uttar Pradesh FP/UP/TRANS/22021/2016 8B/UP/04/99/2019/FC Reserve Forest Land proposed to be diverted for 132KV Mirzapur-Jigna CKT-2 LILLO Passing over forest land at Village:Rajapur District Mirzapur Transmission Line ELECTRICITY TRANSMISSION DIVISION UPPTCL MIRZAPUR 0.2322 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Nov 2016
Stage-I Approval on : 29 Dec 2019
Compliance Report Submitted by User Agency on : 09 Nov 2024
04 Dec 2024
20 Uttar Pradesh FP/UP/Approach/148762/2021 8B/UP/06/151/2022/FC Diversion of 0.1721221 hectare of Protected Forest land under social forestry division,Jhansi for access road to Retail Outlet of M/S Reliance BP Mobility Ltd. at Village- Karari, Khasra No.- Approach Access M/S RELIANCE BP MOBILITY LIMITED 0.1721221 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Oct 2021
Stage-I Approval on : 19 Dec 2022
Compliance Report Submitted by User Agency on : 13 Nov 2024
04 Dec 2024
21 Uttar Pradesh FP/UP/Others/19022/2016 8B/UP/06/58/2016/FC Proposed Forest Land for Approach Road (Exit/Entry) for Essar Oil Limited Retail Outlet On NH-93 Aligarh-Anoopshaher Road CH. 92.96 (LHS) Khasra No. 46/3, Village:Nagaula Tehsil: Kol, District Aligarh Others Essar Oil Limited 0.201409 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Apr 2016
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 03 Sep 2024
28 Oct 2024
22 Uttar Pradesh FP/UP/ROAD/157329/2022 8B/UP/06/121/2023/FC Diverted for Road Widening and Strengthening of Bhadewara to Dramandganj Road (NH-135C) in Km. No. 15.00 to 58.600 in District:-Prayagraj. Road OFFICE OF THE EXECUTIVE ENGINEER 0.927 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2022
Stage-I Approval on : 30 Nov 2023
Compliance Report Submitted by User Agency on : 10 Oct 2024
28 Oct 2024
23 Uttar Pradesh FP/UP/ROAD/123673/2021 8B/UP/06/144/2022/FC U.P.STATE BRIDGE CORPORATION LTD Road U.P. STATE BRIDGE CORPORATION LTD UNIT AGRA 0.073 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Mar 2021
Stage-I Approval on : 29 Aug 2023
Compliance Report Submitted by User Agency on : 29 Aug 2024
16 Oct 2024
24 Uttar Pradesh FP/UP/ROAD/147942/2021 8B/UP/06/145/2022/FC DIVERSION OF 0.0640 HEC. PROTECTED FOREST LAND ON L.H.S AT AGRA TERMINAL DISTRIBUTORY CANAL IN VILLAGE- BICHPURI FOR CONSTRUCTION OF 4-LANE R.O.B AT LEVEL X-ING NO. 11C/2T AT KM 73/7-8 IN IDGAH-BAYANA Rail Section on Runakata to Rohta Road in District Agra Road U.P. STATE BRIDGE CORPORATION LTD UNIT AGRA 0.064 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Oct 2021
Stage-I Approval on : 02 Aug 2023
Compliance Report Submitted by User Agency on : 29 Aug 2024
16 Oct 2024
25 Uttar Pradesh FP/UP/ROAD/13414/2015 8B/UP/06/109/2016/FC Widening of “Gola- Shahjahanpur” section of State Highway No. 93” from Km 0.000 to Km 49.000 of SH-93 in Lakhimpur Kheri district and from Km 49.000 to Km 59.000 of SH-93 in Shahjahanpur district of Uttar Pradesh Road PWD 57.098 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 14 Nov 2017
Compliance Report Submitted by User Agency on : 08 Aug 2024
09 Oct 2024
26 Uttar Pradesh FP/UP/ROAD/150633/2021 8B/UP/06/162/2023/FC Improvement and Upgradation of Moradabad-Kashipur section of NH-734 including Moradabad bypass under NHDP phase-VII in the state of Uttar Pradesh. Package-II: Moradabad-Kashipur Road (Length= 39.750 km) Start from Ch. 0+00 (Existing Km. 389+00) at Bijna and ends at Ch. 39+750 at UP/UK Border near Dhandi River Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 63.5796 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2022
Stage-I Approval on : 08 Jan 2024
Compliance Report Submitted by User Agency on : 13 Aug 2024
09 Oct 2024
27 Uttar Pradesh FP/UP/Approach/49983/2020 8B/UP/06/185/2021 Protected Forest Land for Exit/Entry Approach to Proposed HPCL Retail Outlet on Lucknow-Gorakhpur(Ayodhya-Basti) Road NH-27(Old NH-28), In Km.167(Ch.166.102) at Khasra No.381,Village:Badhar Kala,Tehsil:Harraiya,Dist:Basti Approach Access HPCL RETAIL REGIONAL OFFICE GORAKHPUR 0.187502 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Sep 2020
Stage-I Approval on : 01 Nov 2021
Compliance Report Submitted by User Agency on : 21 Aug 2024
09 Sep 2024
28 Uttar Pradesh FP/UP/ROAD/138464/2021 8B/UP/06/285/2022/FC Development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2/UP/pkg-1 : Sonauli to Gorakhpur km 0+000 to km 81+204 of NH- 29E,District-Gorakhpur)), in the State of Utter Pradesh. Road NHAI, PIU Gorakhpur 8.3746 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Apr 2021
Stage-I Approval on : 30 Dec 2022
Compliance Report Submitted by User Agency on : 14 Aug 2024
04 Sep 2024
29 Uttar Pradesh FP/UP/ROAD/43253/2019 8B/UP/06/265/2021 Forest Land Diversion proposal for "Improvement and Up-gradation to 4-lane configuration of Meerut-Nazibabad section of NH-119 between Km 39+165 to Km 78+635 in the state of Uttar Pradesh". Road NHAI PIU MEERUT 38.8514 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Dec 2019
Stage-I Approval on : 16 Aug 2023
Compliance Report Submitted by User Agency on : 15 Jul 2024
29 Aug 2024
30 Uttar Pradesh FP/UP/Others/145411/2021 8B/UP/06/182/2022/FC Protected Forest Land Proposed to be Diverted for Exit/Entry Approach to Indian Oil Corporation Limited Moradabad Retail Outlet on Meerut-Badaun Road (SH-18) (Chainege 150.550) Km. 151 Right Side, at Khasra No-80/81, Village-Saray Brahman, Tehsil-Gunnaur, Disteict-Sambhal Others INDIAN OIL CORPORATION LTD MORADABAD 0.2081 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Aug 2021
Stage-I Approval on : 31 Jul 2023
Compliance Report Submitted by User Agency on : 15 Jul 2024
29 Aug 2024
31 Uttar Pradesh FP/UP/Approach/146931/2021 8B/UP/06/120/2023/FC Proposed BPCL Retail Outlet on Utraula-Faizabad-Allahabad Road (SH-9) In Km. No. 53 (CH. No.-52.249, RHS), At Gata No. – 1299, Village: - Bahadura, Tehsil: - Tarabganj, District: - Gonda Approach Access BPCL TERRITORY GONDA 0.223146 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Sep 2021
Stage-I Approval on : 25 Aug 2023
Compliance Report Submitted by User Agency on : 02 Aug 2024
27 Aug 2024
32 Uttar Pradesh FP/UP/ROAD/147898/2021 8B/UP/06/73/2022/FC Additional forest land diversion required for Eastern Yamuna canal falling in Shamli District for “Four laning of Panipat ( Start from junction with Existing Km of NH-44 at Panipat) -to Shamli (End at its junction with Existing 39+300 of SH- 12) of NH-709AD in the State of Uttar Pradesh Package -1( 0.000 to 35.580)” Road NHAI BAGHPAT 0.111 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 06 Jan 2023
Compliance Report Submitted by User Agency on : 13 May 2024
16 Aug 2024
33 Uttar Pradesh FP/UP/Others/36498/2018 8B/UP/06/157/2023/FC Construction of Entry and Exit for new Hotel Vishal Faarms House and protected land is required to be diverted (Under FCA Act 1980 for non forestry purpose) Along Amroha - Kailsa -Pakbra (SH-78) km.chainage 3.950 (RHS) Village Pachokra Meharban Ali Gata No.118T ehsil Sadar District Amroha (U.P.) Others HOTEL VISHAL FARMS HOUSE 0.029312 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Oct 2018
Stage-I Approval on : 12 Mar 2024
Compliance Report Submitted by User Agency on : 05 Jun 2024
01 Aug 2024
34 Uttar Pradesh FP/UP/Others/144077/2021 8B/UP/06/297/2021/FC CONSTRUCTION OF M/S BHARAT PETROLEUM CORPORATION LIMITED BAREILLY BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE RAURA KALAN & MENHDI NAGAR KHASRA No.222 & 154 ALONG RAMPUR-BAREILLY ROAD (OLD NH-24 NEW NH- 530) KM. 207 Ch.206.18 (RHS) Tehsil Milak District Rampur Others BHARAT PETROLEUM CORPORATION LIMITED 0.1917 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Aug 2021
Stage-I Approval on : 31 Mar 2022
Compliance Report Submitted by User Agency on : 06 Jul 2024
01 Aug 2024
35 Uttar Pradesh FP/UP/Approach/153670/2022 8B/UP/06/306/2022/FC Proposed BPCL Retail Outlet on Lucknow-Gorakhpur Road NH-27 (Old NH-28) in Km. No. 165 (CH. No. 164.848, RHS) at Khasra No. – 402, Village: - Badhar Khurd, Tehsil: - Harraiya, District-Basti. Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.20284 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2022
Stage-I Approval on : 23 Oct 2023
Compliance Report Submitted by User Agency on : 29 Jun 2024
01 Aug 2024
36 Uttar Pradesh FP/UP/Others/150354/2021 8B/UP/06/184/2023/FC M/S BPCL Meerut by Prop. MS/HSD Retail Outlet (Petrol/Diesel Pump) Site at Village Nawada Kesho Khasra No.155 & 156 Along Behsooma-Chandpur-Thakiudwara -Juspur Road (SH-147) Chainage 80-207 (RHS) Tehsil Dhampur District Bijnor (U.P). Others BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.1847 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jan 2022
Stage-I Approval on : 19 Mar 2024
Compliance Report Submitted by User Agency on : 06 Jun 2024
29 Jul 2024
37 Uttar Pradesh FP/UP/Approach/153324/2022 8B/UP/06/122/2023/FC HPCL Retail Outlet on Handia-Prayagraj Road (SH-106) , In KM Stone No.-236 , Ch.235.040 (RHS), At Gata No.106, Village: Sarai Dasu Urf Haripur ,Pargna: Kewai, Tehsil: Handia, District: Prayagraj(UP) Approach Access HINDUSTAN PETROLEUM 0.3288 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Mar 2022
Stage-I Approval on : 03 Aug 2023
Compliance Report Submitted by User Agency on : 12 Jun 2024
22 Jul 2024
38 Uttar Pradesh FP/UP/Approach/46748/2020 8B/UP/06/185/2023/FC Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on Rura Jhinjhak Marg (ODR) at Km.1 (445-481 LHS) at Gata No. 179, Village: Gutaiya ,Tehsil-Akbarpur ,District: Kanpur Dehat (Uttar Pradesh) Approach Access INDIAN OIL 0.2468 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2023
Stage-I Approval on : 21 Feb 2024
Compliance Report Submitted by User Agency on : 21 May 2024
11 Jul 2024
39 Uttar Pradesh FP/UP/Approach/150537/2021 8B/UP/06/171/2023/FC Proposal of diversion of 0.4102 ha PF land for Approach access Permission to the proposed CNG filling station of M/s Indraprastha Gas Limited (IGL) New Delhi on Delhi Muzaffarnagar Road, MUZAFFARNAGAR Approach Access INDRAPRASTHA GAS LIMITED 0.4102 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Dec 2021
Stage-I Approval on : 22 Apr 2024
Compliance Report Submitted by User Agency on : 06 Jun 2024
05 Jul 2024
40 Uttar Pradesh FP/UP/Approach/156797/2022 8B/UP/06/166/2023/FC ROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.2179434)HAC.) ON AGRA-JAGNER MAARG SH-39, KM 443(CH 242.576), KHASRA NO.316 VILL - NAGLA DULHE KHAN , TEHSEEL-KHERAGARH ,DIST-AGRA ,FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED RELIANCE BP MOBILITY FUEL STATION/ RO Approach Access RELIANCE BP MOBILITY LIMITED 0.2179434 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jun 2022
Stage-I Approval on : 12 Mar 2024
Compliance Report Submitted by User Agency on : 07 Jun 2024
02 Jul 2024
41 Uttar Pradesh FP/UP/ROAD/148672/2021 8B/UP/06/170/2023/FC Development of 4/6 Lane North-East side Gorakhpur bypass starting from NH-29E (chainage 83+308) and end at NH-28 (chainage 285+100) under NHDP Phase-VII in District Gorakhpur in the state of Uttar Pradesh Road NHAI, PIU Gorakhpur 4.946 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Oct 2021
Stage-I Approval on : 11 Dec 2023
Compliance Report Submitted by User Agency on : 24 May 2024
26 Jun 2024
42 Uttar Pradesh FP/UP/ROAD/144204/2021 8B/UP/06/181/2023/FC Protected Forest Land to be diverted for Improvement and Up-gradation of NH-530B from Mathura (NH-44) to Bareilly (NH-30) from CH. No. 66.000 to CH. No. 123.100, in District:- Hathras, Etah & Kasganj Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AGRA 89.4116 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Aug 2021
Stage-I Approval on : 05 Dec 2023
Compliance Report Submitted by User Agency on : 15 Apr 2024
24 Jun 2024
43 Uttar Pradesh FP/UP/Approach/147068/2021 8B/UP/06/250/2022/FC Proposed IOCL Retail Outlet on Lucknow-Raebareli Road NH-30 (Old NH-24B) in Km No. 60 to 61 (CH. No.-60.093, LHS), At Khasra No. 195, Village: - Seri, Tehsil: - Raebareli, District: - Raebareli Approach Access Indian Oil Corporation Limited 0.316303 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Sep 2021
Stage-I Approval on : 26 Feb 2024
Compliance Report Submitted by User Agency on : 13 Jun 2024
21 Jun 2024
44 Uttar Pradesh FP/UP/ROAD/143597/2021 8B/UP/06/257/2022/FC Development of section of NH-119 from 2-lane to 2-lane with paved shoulder under Bharatmala Pariyojana (Lot-4/Package-2) in District Bijnor, state of Uttar Pradesh. Road NHAI PIU MEERUT 27.33 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jun 2021
Stage-I Approval on : 14 Dec 2022
Compliance Report Submitted by User Agency on : 30 May 2024
18 Jun 2024
45 Uttar Pradesh FP/UP/Others/147545/2021 8B/UP/09/26/2022/FC Constt. of RCC Drain along the Govardhan Parikrama Marg, in 11006.00 Mtr. length at Vill. Annyor, Jatipura & Radhakund in Tah.-Govardhan, Distt. Mathura by D & S Unit, U.P. Jal Nigam, Mathura (U.P.) Others U.P. JAL NIGAM, DRAINAGE AND SEWERAGE UNIT, MATHURA (U.P.) 0.9349 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 19 Apr 2024
18 Jun 2024
46 Uttar Pradesh FP/UP/TRANS/156518/2022 8B/UP/04/41/2023 132 KV D/C Talheri TSS (DFCCIL)- Jarauda Nara TSS (Railway) Transmission line falling in Saharanpur & Muzaffarnagar District (Uttar Pradesh)”. (Total Line Length – 47.826 Km). Transmission Line DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED 0.1701 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jun 2022
Stage-I Approval on : 23 Jun 2023
Compliance Report Submitted by User Agency on : 03 May 2024
03 Jun 2024
47 Uttar Pradesh FP/UP/Others/16714/2015 8B/UP/06/96/2023/FC Previously operated Exit/Entry Approach to Nayara Energy Limited ( Ex. Essar Oil Limited) Retail Outlet On Bareilly-Mathura-Bharatpur Road, (SH-33)At KHASRA No.-165 Ka & 166,Villege: Nagla Shisham,Tehsil: Hathras, District: Hathras Others Essar Oil Limited 0.065378 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2015
Stage-I Approval on : 17 Jan 2024
Compliance Report Submitted by User Agency on : 13 May 2024
31 May 2024
48 Uttar Pradesh FP/UP/Approach/144332/2021 8B/UP/06/244/2022/FC Proposed to HPCL Retail Outlet on Bahraich-Faizabad-Azamgarh Road (SH-30) In Km. No. 57 (RHS) At Gata No–58, Village:-Munderwa Kalan, Tehsil:-Gonda, District:- Gonda Approach Access HPCL RETAIL REGIONAL OFFICE GORAKHPUR 0.210889 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Jul 2021
Stage-I Approval on : 09 Dec 2022
Compliance Report Submitted by User Agency on : 07 May 2024
31 May 2024
49 Uttar Pradesh FP/UP/Others/148948/2021 8B/UP/06/259/2022/FC Construction OF M/S IOCL Bareilly Prop. MS/HSD Kisan Seva Kendra (Retail Outlet) Protected Land is required to be diverted (FCA 1980 For Non forestry purposed) Site Situated Village Rehpurar Khasra/Gaata No- 446/1 On Patwai-Milak ( O.D.R.-3) Km. 8.709 Chainage 8.743 R(HS) Tehsil Milak District Rampur (U.P.) Others INDIAN OIL CORPORATION LIMITED BAREILLY 0.0643 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Nov 2021
Stage-I Approval on : 08 Sep 2022
Compliance Report Submitted by User Agency on : 17 Apr 2024
31 May 2024
50 Uttar Pradesh FP/UP/ROAD/157254/2022 8B/UP/06/315/2022/FC Improvement and Up-gradation of Existing Road (NH-731) to 4-Lane with Paved Shoulder from Km 88.750 to Km 123.650, Start of Shahjahanpur Bypass to Start of Shahabad Bypass of NH-731 on HAM basis of Shahjahanpur & Hardoi Forest Divisions & Districts in the state of Uttar Pradesh (Total Length-34.900 Km of Package 2A) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 12.1615 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2022
Stage-I Approval on : 24 Aug 2023
Compliance Report Submitted by User Agency on : 25 Apr 2024
17 May 2024
12345678910...