Ministry of Environment,Forest and Climate Change
Government of India
Uttar Pradesh
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttar Pradesh FP/UP/Approach/149596/2021 8B/UP/06/69/2022/FC Retail Outlet by Reliance BP Mobility Ltd. at Khasara No.-664 Vill.–Takuawar, at Km. 148.627 on R.H.S. of Bareilly-Mathura Road, SH-33 (New declared NH-530B), in Tehsil & District. Kasganj (U.P.) Approach Access RELIANCE BP MOBILITY LIMITED MUMBAI 0.07 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Dec 2021
Stage-I Approval on : 08 Aug 2022
Compliance Report Submitted by User Agency on : 16 Sep 2022
03 Oct 2022
2 Uttar Pradesh FP/UP/Approach/147153/2021 8B/UP/06/42/2022/FC National Institute of Unani Medicine, Kamla Nehru Nagar, Hapur Road, District & Division Ghaziabad, Uttar Pradesh between Km 30 and 31 of NH-24 Approach Access NATIONAL INSTITUTE OF UNANI MEDICINE 0.0184 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Sep 2021
Stage-I Approval on : 28 Jun 2022
Compliance Report Submitted by User Agency on : 31 Aug 2022
30 Sep 2022
3 Uttar Pradesh FP/UP/Approach/146134/2021 8B/UP/06/105/2022/FC Proposed IOCL Retail Outlet on Fatehpur-Baberu-Atarra-Naraini-Kartal Road (SH-71) In Km No. 76 (CH. No.-190 to 225, RHS), At Gata No.– 4531 & 4530 Kha, Village: -Atarra Rural, Tehsil: - Atarra, District: - Banda Approach Access IOCL MARKETING DIVISION ALLAHABAD 0.221719 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Aug 2021
Stage-I Approval on : 01 Jul 2022
Compliance Report Submitted by User Agency on : 15 Sep 2022
29 Sep 2022
4 Uttar Pradesh FP/UP/Approach/150480/2021 8B/UP/06/60/2022/FC Diversion of PF Land for approach to HPCL RO on ODR ( Baraut-Chaprauli ), Road, Between Km stone no-2 & 3, Khasra no-803(mi), vill-Malakpur, Teh-Baraut,Dist-Baghpat Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED, MEERUT, UP 0.0524022 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Dec 2021
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 11 Sep 2022
29 Sep 2022
5 Uttar Pradesh FP/UP/Others/152630/2022 8B/UP/06/134/2022/FC Construction OF M/S Indian Oil Corporation Limited Moradabad (Retail Outlet) Protected Land is required to be diverted (FCA 1980 For Non forestry purposed ) Site situated at Village Salarpur Khasra No.86 km stone 106 to 111 Along Gajraula-Joya Road N.H-24 (New N.H-09) (RHS) Tehsil Dhanaura Distt. Amroha (U.P.). Others Indian Oil Corporation Limited 0.0412 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Feb 2022
Stage-I Approval on : 19 Jul 2022
Compliance Report Submitted by User Agency on : 11 Sep 2022
29 Sep 2022
6 Uttar Pradesh FP/UP/ROAD/23288/2016 8B/UP/06/14/2018/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Aligarh to Bhadwas section (Km 140.200 to Km 186.000) Package-I section of National Highway-91 in Aligarh and Hathras Districts in the State of Uttar Pradesh Road NHAI 95.606 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Dec 2016
Stage-I Approval on : 23 Apr 2018
Compliance Report Submitted by User Agency on : 18 Aug 2022
28 Sep 2022
7 Uttar Pradesh FP/UP/Others/42226/2019 8B/UP/06/127/2020 Proposed Forest Land for Approach Road ( entry, exit & middle part) for HINDUSTAN PETROLEUM CORPORATION LIMITED Retail outlet on MDR -126 Kishni - Karhal Road CH. 51.920 (LHS), Gata No.- 3575 vill.- Others HINDUSTAN PETROLEUM CORPORATION LIMITED AGRA 0.055868 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2019
Stage-I Approval on : 05 Oct 2021
Compliance Report Submitted by User Agency on : 22 Sep 2022
28 Sep 2022
8 Uttar Pradesh FP/UP/Approach/150401/2021 8B/UP/06/119/2022/FC Proposed IOCL Retail Outlet on Sultanpur-Lucknow Road NH-56 (New NH-731) in Km No. 120 to 121 (CH. No.-120.828, RHS) at Khasra No. – 817, Village: -Kapoorchandpur, Tehsil: - Musafirkhana, District: -Amethi Approach Access IOCL MARKETING DIVISION ALLAHABAD 0.048708 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Dec 2021
Stage-I Approval on : 15 Jul 2022
Compliance Report Submitted by User Agency on : 13 Sep 2022
28 Sep 2022
9 Uttar Pradesh FP/UP/Approach/151281/2022 8B/UP/06/97/2022/FC Proposed BPCL Retail Outlet on Lucknow-Gorakhpur Road NH-27 (Old NH-28) in Km. No. 49 to 50 (CH. No.-49.768, RHS) at Khasra No. – 1715 & 1718, Village: - Udhauli, Tehsil: - Nawabganj, District: - Barabanki Approach Access BPCL TERRITORY LUCKNOW 0.234075 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jan 2022
Stage-I Approval on : 20 Aug 2022
Compliance Report Submitted by User Agency on : 16 Sep 2022
28 Sep 2022
10 Uttar Pradesh FP/UP/Approach/154713/2022 8B/UP/06/185/2022/FC Proposed Awantika Biofuels Limited Retail Outlet on Bansi to Basti Road NH-28 (Old NH-233) in Km No. 64 (CH. No. 63.401, LHS) at Khasra No.–20 & 21, Village:- Lehra Urf Ramnagar, Tehsil:- Bansi, District:- Siddharthnagar. Approach Access M/S AWANTIKA BIO FUELS 0.378848 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Apr 2022
Stage-I Approval on : 08 Aug 2022
Compliance Report Submitted by User Agency on : 02 Sep 2022
28 Sep 2022
11 Uttar Pradesh FP/UP/Pipeline/49544/2020 BS 167/81-2-2021-800(81)/2021 Laying gas pipeline along & acoross on Moradabad - Kanth road (Ch: 6.870 - 30.570 Km) Pipeline TORRENT GAS PVT LTD 1.4118 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Sep 2020
Stage-I Approval on : 31 Dec 2021
Compliance Report Submitted by User Agency on : 02 Aug 2022
22 Sep 2022
12 Uttar Pradesh FP/UP/Others/154183/2022 8B/UP/06/138/2022/FC Construction OF M/S BPCL Ltd Bareilly Protected Land is required to be diverted (FCA 1980 For Non forestry Purposed ) MS/HSD (Retail Outlet) Site situated at Village Tanda khas Khasra/Gata No-920 On Khod-Tanda Road (O.D.R)Km. Chainage 14.300 (LHS) Tehsil Tanda District Rampur. Others BHARAT PETROLEUM CORPORATION LIMITED 0.04325 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Apr 2022
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 31 Aug 2022
21 Sep 2022
13 Uttar Pradesh FP/UP/Approach/147402/2021 8B/UP/06/30/2022/FC Proposed to BPCL Retail Outlet on Sultanpur-Lucknow Road NH-56 (New NH-731) In Km. No. 195 to 196 (CH. No.-195.268, LHS) At Khasra No.–1577, Village:- Salempur, Tehsil: - Mohanlalganj, District:-Lucknow Approach Access BPCL TERRITORY LUCKNOW 0.178913 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Sep 2021
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 08 Aug 2022
20 Sep 2022
14 Uttar Pradesh FP/UP/Approach/55370/2020 8B/UP/06/197/2022/FC Proposed BPCL Retail Outlet on Bansi-Basti Road NH-28 (Old NH-233) in Km. No. 51, (CH No. 50.441, RHS), At Khasra No. – 39M, Village: - Kazirudhauli, Tehsil: - Bansi, District: - Siddharth Nagar Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.276997 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Mar 2022
Stage-I Approval on : 10 Aug 2022
Compliance Report Submitted by User Agency on : 07 Sep 2022
19 Sep 2022
15 Uttar Pradesh FP/UP/Approach/146088/2021 8B/UP/06/107/2022/FC Proposed HPCL Retail Outlet on Bahraich-Faizabad-Azamgarh Road SH-30 In Km. No. 182 (CH. No. 0.600 To 0.800, LHS) At Gata No–56, Village:-Barsawan Hashimpur, Tehsil:-Akbarpur, District:-Ambedkarnagar Approach Access HPCL RETAIL REGIONAL OFFICE GORAKHPUR 0.20706 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Aug 2021
Stage-I Approval on : 20 Aug 2022
Compliance Report Submitted by User Agency on : 02 Sep 2022
19 Sep 2022
16 Uttar Pradesh FP/UP/Approach/150632/2021 8B/UP/06/154/2022/FC Proposed IOCL Retail Outlet on Raebareli-Pratapgarh Road NH-231 (New NH-31) in Km. No. 177 to 178 (CH. No.-177.598, RHS) at Khasra No. –1051, Village: -Bhuwalpur Domipur, Tehsil:-Pratapgarh, District:Pratapgarh Approach Access IOCL MARKETING DIVISION ALLAHABAD 0.026384 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Dec 2021
Stage-I Approval on : 10 Aug 2022
Compliance Report Submitted by User Agency on : 12 Sep 2022
19 Sep 2022
17 Uttar Pradesh FP/UP/Others/48635/2020 8B/UP/09/197/2021 Forest land proposed to be diverted for approach access to Shyam Energy Enterprises on Gola / Moahhamdi to Shahjahanpur Road (SH-93) KM 56 CH.55.821,RHS Gata no.4 vill. Deoriya tehsil Sadar distt. Sha Others SHYAM ENERGY ENTERPRISES 0.009569 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 20 Jan 2022
Compliance Report Submitted by User Agency on : 18 Jun 2022
16 Sep 2022
18 Uttar Pradesh FP/UP/Approach/48993/2020 8B/UP/06/25/2022/FC Proposed HPCL Retail Outlet on Bilrayan-Panwari Road(SH-21) in Km.47(Ch.46.265 to 46.305),Gata No.354Mi,Village:Sanda,Tehsil:Lakhimpur,Dist:Lakhimpur Kheri Approach Access Hindustan Petroleum Corporation Limited 0.084708 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Aug 2020
Stage-I Approval on : 04 Jul 2022
Compliance Report Submitted by User Agency on : 23 Aug 2022
16 Sep 2022
19 Uttar Pradesh FP/UP/Approach/145954/2021 8B/UP/06/75/2022/FC Proposed to HPCL Retail Outlet on Mahmudabad-Biswan Road (NH-727H) In Km. No. 69 (CH. No. 68.394 to 68.445, LHS) At Khasra No–978, 980, 981 & 982 Village:- Januwan, Tehsil:-Biswan, District:- Sitapur Approach Access Hindustan Petroleum Corporation Limited 0.262704 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 29 Jul 2022
16 Sep 2022
20 Uttar Pradesh FP/UP/Others/147422/2021 8B/UP/06/298/2021/FC Construction OF HPCL Ltd. Meerut Prop. MS/HSD Petrol/Diesel pump (Retail Outlet) Protected Land is required to be diverted (FCA 1980 For Non forestry purposed) Site at Vill. Shahbajpur Khasra No- 550MI Along Hapur-Moradabad Road NH-09 ( Old NH-24) Km.116 (Ch. 115-925 LHS) Teh. & Dstt. Amroha. Others HPCL MEERUT 0.2088 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Sep 2021
Stage-I Approval on : 01 Apr 2022
Compliance Report Submitted by User Agency on : 24 Jun 2022
16 Sep 2022
21 Uttar Pradesh FP/UP/Others/34243/2018 8B/UP/06/76/2019/FC 0.211267 ha. protected forest land proposed to exit entry of HPCL Retail out lat at khautali jansath meerapur Road (meerut pauri Road nh-119 KM 60, CHAINAGE 59.967 RHS) Khsra no- 455m 456 m Village rassolpur thashil jansat district muzaffarnagar Others Hindustan Petroleum Corporation Limited 0.211267 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jun 2018
Stage-I Approval on : 07 Jun 2022
Compliance Report Submitted by User Agency on : 12 Jul 2022
14 Sep 2022
22 Uttar Pradesh FP/UP/Approach/147650/2021 8B/UP/06/61/2022/FC Proposed HPCL Retail Outlet on Khaga-Kishanpur Road (ODR) in Km No. 09 (CH. No. 08.418, LHS) At Gata No–390, Village:- Vijayeepur, Tehsil:-Khaga, District:- Fatehpur Approach Access Hindustan Petroleum Corporation Limited 0.158594 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Sep 2021
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 23 Aug 2022
13 Sep 2022
23 Uttar Pradesh FP/UP/ROAD/53919/2020 8B/UP/06/274/2021/FC Forest diversion proposal for rehabilitation and up-gradation to 2 lanes with paved shoulders configuration of Bewar - Near Karri village section (Km 0+000 to Km 30+000) Package I of NH-92 in the state of Uttar Pradesh under GNHCP on EPC Mode in the State of Uttar Pradesh Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 36.395 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Nov 2020
Stage-I Approval on : 10 Jun 2022
Compliance Report Submitted by User Agency on : 19 Jul 2022
08 Sep 2022
24 Uttar Pradesh FP/UP/Approach/118923/2021 8B/Up/06/282/2021/FC BPCL Retail Outlet on Rampur-Bareilly Road, NH-24 (New NH-530), in Km No. 196, (Ch. No. 195.950, RHS), at Khasra No. 445, Village- Meghanagla Kadeem, Tehsil-Milak, District-Rampur Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.221443 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Feb 2021
Stage-I Approval on : 17 Jan 2022
Compliance Report Submitted by User Agency on : 26 Aug 2022
08 Sep 2022
25 Uttar Pradesh FP/UP/Approach/150947/2022 8B/UP/06/70/2022/FC Proposed BPCL Retail Outlet on Sultanpur-Lucknow Road (NH-731) in Km. No. 162 to 163 (CH. No.162.427, RHS) at Khasra No. 154, Village: - Chilauli, Tehsil: - Tiloi, District: - Amethi Approach Access BPCL TERRITORY LUCKNOW 0.250953 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jan 2022
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 10 Aug 2022
05 Sep 2022
26 Uttar Pradesh FP/UP/Approach/151162/2022 8B/UP/06/71/2022/FC Proposed IOCL Retail Outlet on Sultanpur-Varanasi Road NH-731 (Old NH-56) in Km. No. 195 to 196 (CH. No.-195.897, LHS) at Khasra No.–725, 726 & 727Ka, Village:-Sarokhanpur, Tehsil:-Badlapur, District:Jaunpur Approach Access INDIAN OIL CORPORATION LTD VARANASI 0.059068 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jan 2022
Stage-I Approval on : 22 Jun 2022
Compliance Report Submitted by User Agency on : 08 Aug 2022
05 Sep 2022
27 Uttar Pradesh FP/UP/Others/141739/2021 8B/UP/06/271/2021/FC CONSTRUCTION OF M/S INDIAN OIL CORPORATION LIMITED MORADABAD BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE MAKHDOOMPUR GATA No.93 ALONG MORADABAD – SAMBHAL ROAD (SH-148) KM 29 CHAINAGE 28.727 (LHS) TEHSIL & District Sambhal (U.P.). Others INDIAN OIL CORPORATION LIMITED 0.0558 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2021
Stage-I Approval on : 16 Jun 2022
Compliance Report Submitted by User Agency on : 03 Aug 2022
03 Sep 2022
28 Uttar Pradesh FP/UP/TRANS/15520/2015 8B/UP/04/31/2016/FC 765 kV S/C Mainpuri - Bara Transmission Line CKT - II Transmission Line SOUTH EAST UTTAR PRADESH POWER TRANSMISSION COMPANY LIMITED 22.0305 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Sep 2015
Stage-I Approval on : 29 Jun 2016
Compliance Report Submitted by User Agency on : 18 Aug 2022
02 Sep 2022
29 Uttar Pradesh FP/UP/Others/141741/2021 8B/UP/06/287/2021/FC CONSTRUCTION OF M/S INDIAN OIL CORPORATION LIMITED MORADABAD BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE TAKHT GUSAIN GATA No.380 ALONG Moradabad –Sambhal ROAD (SH. NO.-148) KM 32 CHAINAGE 31.981 (RHS) TEHSIL & District Sambhal. (U.P.). Others INDIAN OIL CORPORATION LIMITED 0.0558 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2021
Stage-I Approval on : 15 Jun 2022
Compliance Report Submitted by User Agency on : 05 Aug 2022
02 Sep 2022
30 Uttar Pradesh FP/UP/Approach/146425/2021 8B/UP/06/126/2022/FC HPCL Retail Outlet on NH-19 (Old NH-2) , In KM Stone No. 582 Ch.581.999 (RHS), At Gata No.589, Village: Sangrampur ,Tehsil: Khaga, District: Fatehpur (Uttar Pradesh). Approach Access HINDUSTAN PETROLIUM CORPORATION LIMITED 0.05105 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2021
Stage-I Approval on : 13 Jul 2022
Compliance Report Submitted by User Agency on : 16 Aug 2022
02 Sep 2022
31 Uttar Pradesh FP/UP/ROAD/147081/2021 8B/UP/06/57/2022/FC Protected Forest Land to be diverted for Proposed Four Lane Road Widening & Strengthening of G.T. Road-Prayagraj Varanasi (SH-106) Road from CH. No. 219.500 to CH. No. 242.600, in District: Prayagraj Road CONSTRUCTION DIVISION 3, PWD, PRAYAGRAJ 26.7016 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Sep 2021
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 08 Aug 2022
02 Sep 2022
32 Uttar Pradesh FP/UP/ROAD/49579/2020 8B/UP/06/269/2021/FC Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar to Allahganj Section of NH-730C ( Km 0.000 to Km 52.770) (Package-I) in the State of Uttar Pradesh under Green National highways Corridor Project (GNHCP) with the loan assistance of world Bank on EPC mode Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 74.138 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Sep 2020
Stage-I Approval on : 02 May 2022
Compliance Report Submitted by User Agency on : 03 Aug 2022
01 Sep 2022
33 Uttar Pradesh FP/UP/Others/146588/2021 8B/UP/06/296/2021/FC Construction OF M/S Hindustan Petroleum Corporation Limited Meerut Proposed MS/HSD Petrol/Diesel pump (Retail Outlet) Protected Land is required to be diverted (FCA 1980 For Non forestry purposed) Site Situated Village Dhakiya Khasra No- 78 Along Delhi-Moradabad Road NH-24 ( New NH-09) Km. Stone 138(Chainage 137-799 LHS) Tehsil District Amroha Others HPCL MEERUT 0.1723 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Sep 2021
Stage-I Approval on : 31 Mar 2022
Compliance Report Submitted by User Agency on : 29 Jun 2022
01 Sep 2022
34 Uttar Pradesh FP/UP/Approach/148205/2021 8B/UP/06/39/2022/FC Proposed Reliance BP Mobility Limited Retail Outlet on Lucknow-Raebareli Road NH-30 (Old NH-24B) in Km. No.40 (CH. No. 39.953, LHS) at Khasra No. 845 & 846, Village: - Sherpurlawal, Tehsil:- Mohanlalganj, District:- Lucknow Approach Access RELIANCE BP MIBILTY LIMITED, LUCKNOW 0.248386 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Oct 2021
Stage-I Approval on : 04 May 2022
Compliance Report Submitted by User Agency on : 28 Jul 2022
01 Sep 2022
35 Uttar Pradesh FP/UP/TRANS/13967/2015 8B/UP/04/106/2016/FC 400KV D/C Allahabad-Kanpur Transmission Line (Part-II) Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 0.5511 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Sep 2015
Stage-I Approval on : 14 Jul 2017
Compliance Report Submitted by User Agency on : 06 Aug 2022
31 Aug 2022
36 Uttar Pradesh FP/UP/Others/21586/2016 8B/UP/09/107/2016/FC Laying of 24 f OFC from Kanpur Fatehpur Border on Bakewar Musafa Marg (From KM 10 to Bakewar Turning,Length=9.5 KM),on Bakewar Bindaki Marg (SH-46A) (From KM 1 to KM 14,Length=13 KM),on Bindaki Lalauli Marg MDR (From KM 16 to KM 26, Total Length=11 KM)and On Fatehpur Joniha Marg( From KM 21.250 to Fatehpur Telephone Exchange,Length=21.5 KM)L=55KM Others BHARAT SANCHAR NIGAM LIMITED 1.815 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Sep 2016
Stage-I Approval on : 27 Dec 2016
Compliance Report Submitted by User Agency on : 16 Jun 2022
31 Aug 2022
37 Uttar Pradesh FP/UP/ROAD/31077/2017 8B/UP/06/49/2018/FC Protected Forest Land Proposed to be Diverted For ROB in Saidpur Bypass On NH-29 Chhadra - Aunrihar Section (Railway) Bet/Ween Aunrihar - Saidpur Railway Station (Km.167.9 to 168/0) District: Ghazipur Road NHAI PIU VARANASI 0.484 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Feb 2018
Stage-I Approval on : 09 Jul 2018
Compliance Report Submitted by User Agency on : 10 Aug 2022
31 Aug 2022
38 Uttar Pradesh FP/UP/Approach/142965/2021 8B/UP/06/260/2021/FC Diversion of PF land for construction of Approach Road to Pro. NRO of IOCL on NH-34, CH.175.523RHS, KH. 128/7/2, vill-BIlar, Teh-Sikandra Rao,Hathras,( UP) Approach Access INDIAN OIL CORPORATION LTD (MARKETING DIVISION) 0.120246 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 28 Jul 2022
31 Aug 2022
39 Uttar Pradesh FP/UP/Approach/151948/2022 8B/UP/06/76/2022/FC Proposed IOCL Retail Outlet on Lucknow-Raebareli Road NH-30 (Old NH-24B) in between Km. No.- 20 to 21 (CH. No. 20.209, RHS) at Khasra No.-738, Village: - Purseni, Tehsil: - Mohanlalganj, District: -Lucknow Approach Access Indian Oil Corporation Limited 0.050737 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Feb 2022
Stage-I Approval on : 21 Jun 2022
Compliance Report Submitted by User Agency on : 03 Aug 2022
31 Aug 2022
40 Uttar Pradesh FP/UP/Approach/144149/2021 8B/UP/06/264/2021/FC Diversion of PF for construction of Access road to Retail Outlet of M/S HPCL Ltd, at Vill- Sikandra Rao Dehat, Khasra No.- 1908, 1909,1910 1911 sa in Ch.186.015 LHS of NH-530 B Approach Access Hindustan Petroleum Corporation Limited 0.139071 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2021
Stage-I Approval on : 14 Jan 2022
Compliance Report Submitted by User Agency on : 28 Jul 2022
30 Aug 2022
41 Uttar Pradesh FP/UP/ROAD/150758/2022 8B/UP/06/49/2022/FC Construction of new Loha bridge adjacent to existing one at design Ch. 9.500 over Mohand River on NH -307 (Old NH 72A) in the Saharanpur District of Uttar Pradesh Road NATIONAL HIGHWAY AUTHORITY OF INDIA, VASANT VIHAR, PIU, DEHRADUN 0.0681 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jan 2022
Stage-I Approval on : 13 Jul 2022
Compliance Report Submitted by User Agency on : 01 Aug 2022
30 Aug 2022
42 Uttar Pradesh FP/UP/Pipeline/120198/2021 P-335/81-2-2021-800(36)/2022 Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline along Badeban Chauraha-Company Bagh Chauraha and Basti Roadways-Plastic Complex in District Basti Pipeline TORRENT GAS PRIVATE LIMITED 0.35805 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jan 2021
Stage-I Approval on : 28 Mar 2022
Compliance Report Submitted by User Agency on : 10 Jun 2022
29 Aug 2022
43 Uttar Pradesh FP/UP/Pipeline/122517/2021 P-162/81-2-2021-800(141)/2021 Laying of Proposed 6" Dia. Steel pipeline along the Moradabad to Chandausi NH-509 (Ch : 34.100 to 41.150 km)Left Side and (Ch :45.600 to 45.750 km) Right Side in Sambhal District (U.P) Pipeline TORRENT GAS PRIVATE LTD 0.4323 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Feb 2021
Stage-I Approval on : 24 Aug 2021
Compliance Report Submitted by User Agency on : 15 Nov 2021
29 Aug 2022
44 Uttar Pradesh FP/UP/Pipeline/122734/2021 P-151/81-2-2021-800(142)/2021 Laying of Proposed 6" Dia. Steel pipeline (Ch:136.48 to 141.22 km) and 125 mm MDPE Gas pipeline (Ch:141.22 to 141.78 km) from along the CL Gupta to Stoneman Craft National Highway 09 Right Side in A Pipeline TORRENT GAS PRIVATE LTD 0.3182 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2021
Stage-I Approval on : 24 Aug 2021
Compliance Report Submitted by User Agency on : 09 Jun 2022
29 Aug 2022
45 Uttar Pradesh FP/UP/Pipeline/123162/2021 P-14/81-2-2022-800(31)/2022 for Laying of Gas Pipeline along Lucknow-Sultanpur Road, NH-56 (New NH-731), (from Ch. No. 54.86 to Ch. No. 64.00, RHS) and along Haidergarh-Ramsanehi Ghat (SH-13) Road (from Ch. No. 0.00 to Ch. No. 11.23, LHS) in District: - Barabanki Pipeline TORRENT GAS PRIVATE LIMITED 1.0078 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Feb 2021
Stage-I Approval on : 24 Mar 2022
Compliance Report Submitted by User Agency on : 30 May 2022
29 Aug 2022
46 Uttar Pradesh FP/UP/Approach/144093/2021 8B/UP/06/20/2022/FC Bharat Petroleum Corporation Limited Retail Outlet on Badaun-Dataganj Road (MDR-74) , In KM Stone No. 16.635 (RHS), At Gata No. 369 , Village: Nagla Barsunia, Tahsil-Budaun , District: Budaun (UP) Approach Access BHARAT PETROLEUM 0.0847 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Aug 2021
Stage-I Approval on : 25 Mar 2022
Compliance Report Submitted by User Agency on : 25 Jul 2022
27 Aug 2022
47 Uttar Pradesh FP/UP/TRANS/125725/2021 8B/UP/04/230/2020/FC Construction of 400 kV D/C Murad Nagar- Simbhavali Transmission Line Transmission Line POWERGRID MEERUT SIMBHAVALI TRANSMISSION LIMITED 0.9844 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Mar 2021
Stage-I Approval on : 16 Feb 2022
Compliance Report Submitted by User Agency on : 19 Jul 2022
26 Aug 2022
48 Uttar Pradesh FP/UP/ROAD/138735/2021 8B/UP/06/155/2021/FC WIDENING AND STRENGTHING WORK OF MATHURA VRINDAVAN ROAD (MDR-123) (CH.0.650K.M. TO CH.8.500K.M.) (LENGTH 7.85 K.M.) Road PRO DIVISION P W D MATHURA 4.184 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Mar 2021
Stage-I Approval on : 17 Aug 2021
Compliance Report Submitted by User Agency on : 09 Jul 2022
26 Aug 2022
49 Uttar Pradesh FP/UP/Others/150984/2022 8B/UP/09/48/2022/FC Diversion of PF land for laying of Electrical under ground cables or feeding bus Charging Facility along NH-509 from 132/33kv Dayalbag Sub Station pilipokhar to new construction of 33/11kv electric Bus Charging Station Naraich ( Foundary Nagar ), distt- Agra (UP) Others AGRA MATHURA CITY TRANSPORT SERVICES LIMITED 0.06257 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jan 2022
Stage-I Approval on : 29 Apr 2022
Compliance Report Submitted by User Agency on : 18 May 2022
25 Aug 2022
50 Uttar Pradesh FP/UP/TRANS/151791/2022 8B/UP/04/52/2022/FC Diverted for Reconstruction of (Existing Tower 8 & Existing Tower 9) of 400 KV S/C Lucknow (Sarojini Nagar)-Bareilly Transmission Line hindering the construction of Outer Ring Road (NHAI) Under Construction in District Lucknow Transmission Line POWER GRID CORPORATION OF INDIA LTD 0.626215 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Feb 2022
Stage-I Approval on : 10 May 2022
Compliance Report Submitted by User Agency on : 03 Aug 2022
20 Aug 2022
12345678910...