FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UP/ROAD/150633/2021   (ii). Name of Project for which Forest Land is required : Improvement and Upgradation of Moradabad-Kashipur section of NH-734 including Moradabad bypass under NHDP phase-VII in the state of Uttar Pradesh. Package-II: Moradabad-Kashipur Road (Length= 39.750 km) Start from Ch. 0+00 (Existing Km. 389+00) at Bijna and ends at Ch. 39+750 at UP/UK Border near Dhandi River   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Improvement and Upgradation of Moradabad-Kashipur section of NH-734 including Moradabad bypass under NHDP phase-VII in the state of Uttar Pradesh. Package-II: Moradabad-Kashipur Road (Length= 39.750 km) Start from Ch. 0+00 (Existing Km. 389+00) at Bijna and ends at Ch. 39+750 near Dhandi River   (iv). State : Uttar Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2402.91   (viii). Area of forest land proposed for diversion(in ha.): 63.5796   (ix). Non-forest land required for this project(in ha.): 203.2824   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY   (ii). Address1 : 26, Green Park, Beesalpur Road, Bareilly(U.P.)   (iii). Address2 : NIL   (iv). State : Uttar Pradesh   (v). District : Bareilly   (vi). Pin : 243006   (vii). Landmark : NIL   (viii). Email address : piubareilly@gmail.com   (ix). Landline Telephone No. : 581-2523752   (x). Fax No. : 581-2520204   (xi). Mobile No. : 9897956767   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Nikhil   (ii). Middle Name: NIL   (iii). Last Name: Narang   (iv). Gender: Male   (v). Designation: Project Director   (vi). Address 1: National Highways Authority of India, PIU-Bareilly   (vii). Address 2: 26, Green Park, Beesalpur Road, Bareilly(U.P.)   (viii). State: Uttar Pradesh   (ix). District: Bareilly   (x). Tehsil: Bareilly   (xi). Pin: 243006   (xii). Landmark: NIL   (xiii). Email Address: piubareilly@gmail.com   (xiv). Landline Telephone No.: 581-2523752   (xv). Fax No.: 05812520204   (xvi). Mobile No.: 8586979842   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Social Forestry Division Moradabad63.5796203.2824
Total63.5796203.2824
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Moradabad63.5796203.2824
Total63.5796203.2824
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bijna1.91932.046
2Godhi2.43992.1628
3Hamirpur1.41751.2132
4Jaitpur4.44763.8725
5Sirswan Gaur6.93026.2901
6Kurwaku09.3301
7Gunga Nagla07.9177
8Baru Bhood09.1018
9Shayampur Hadipur013.1112
10Devipur Mustahkam0.357818.9759
11Devipur Ahetmali03.3403
12Jahidpur Sikampur04.711
13Humayunpur04.1784
14Gularia Murad Ahtamali00.8486
15Chandpur Ahtamali07.1942
16Sindawali Ahatmali0.460710.3307
17Jahangirpur2.96532.8103
18Syodashpur2.77453.9528
19Noorpur1.24991.2466
20Jalalpur3.32012.8563
21Tilok Majra0.02063.1106
22Jatpur0.66038.5795
23Lodhipur Patti1.40481.5094
24Asdullapura2.0171.6862
25Nakhoonka6.56175.3603
26Usmanpur3.2372.9409
27Sultanpur Dost0.74220.1421
28Longi Khurd08.6479
29Longi Kalan05.525
30Raghunathpur3.57735.9354
31Foladpur2.3640.8099
32Aslempur4.05392.9569
33Missarwala5.48614.1439
34Gadhoowala0.67090.5198
35Sahabganj3.1892.9218
36Faizulanagar00.1685
37Fareed Nagar021.6778
38Mohammad Ganj0.22989.9982
39Hat hat1.08221.1578
Total 63.5796 203.2824
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Improvement and up-gradation of 4/6 lane Moradabad63.5796203.2824
Total 63.5796 203.2824
C. Maps of forest land proposed to be diverted
Division 1. : Social Forestry Division Moradabad
  (i). Area of forest land proposed to be diverted(in ha.) : 63.5796   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.63.5796    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 600
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Demand Letter
2Form A Part 1
3Project Approval Letter LAC MoM
4Balance Forest Area Statement
5Cost Benefit Analysis
6Status of EC
7Typical Cross Section of project
8Certificate to use Fly Ash
9Muck Disposal Plan
10Undertaking for additional conditions
11Undertaking for disposing of Muck
12Undertaking for Entire Tree Transplantation
13Undertaking for FRA certificate
14Undertaking for Minimum Forest Area
15Undertaking for Minimum Trees to be felled
16Undertaking for No Court Case
17Undertaking for no National Park in project area
18Undertaking for No Violation
19Undertaking to adhere with Stipulated Conditions
20Undertaking to adhere with Task Force recommendations
21Undertaking to bear amount of CA
22Undertaking to not change status of Forest Land
23Undertaking to not start any activity
24Undertaking to pay NPV
25Undertaking to submit NOC of Owners Department
26Compliance Letter for EDS 01022022
27Forest Gazette Notification
28Linear Plan Map
29Compliance of EDS dated 06042022
30Justification of locating the project in Forest area
31Detailed Note on the Project.
32Forest Area Statement.
33GOI Letter
34Mukhya Prista
35Mulya Praman Patra.
36Nirdharit Sarte.
37Non Forest area statement.
38NPV Bhugtan sambandhi praman patra.
39Village wise Forest and Non forest area.
40Pratiporak Vanikaran
41Sanyukta Niriksan akhya.
42Vakalpic bhumi.
43No wildlife sanctuary is situated in 10 km radius of the project.
44Manak Shartein
45Railway PF Notification
46NPV Ganna
47Online Form A Part 1
48Compliance submission against the query raised on dated 14-09-2022.
49Compliance submission against the query raised on dated 01-10-2022.
50EDS Compliance 17112022