Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/15785/2015
|
1(340)/2016
|
Construction of Same to Dagti Via Gyandhura motor road (Length 6.00 Km)
|
Road
|
PWDKAPKOT
|
4.86
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Oct 2015
|
Stage-I Approval on
|
:
|
24 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
27 Jun 2025
|
2
|
Uttarakhand
|
FP/UK/ROAD/32834/2018
|
8B/UCP/06/148/2019/FC
|
Construction of Chamba Mussoorie Motor Road in Place Kanatal to Andhiyargadhi Sangaon Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2018
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
17 Jun 2025
|
3
|
Uttarakhand
|
FP/UK/ROAD/11139/2015
|
8B/UCP/06/15/2019/FC
|
Mastkhal to Sila Danda Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
2.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2015
|
Stage-I Approval on
|
:
|
09 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
10 Jun 2025
|
4
|
Uttarakhand
|
FP/UK/ROAD/23336/2016
|
8B/UCP/06/60/2018/FC
|
Construction of Pothing Toli Motor Road (Length 7.00km)
|
Road
|
PWDKAPKOT
|
4.287
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2016
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
28 May 2025
|
5
|
Uttarakhand
|
FP/UK/ROAD/37053/2018
|
8B/UCP/06/91/2020/FC
|
Pawadhar naini Jageshwar motor Road
|
Road
|
EE TY DIV PWD BERINAG
|
5.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2018
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2025
|
|
|
|
09 May 2025
|
6
|
Uttarakhand
|
FP/UK/ROAD/11370/2015
|
8b/UCP/09/178/2015
|
Construction of Gajar to kwaralli Motor Road under PMGSY.
|
Road
|
PMGSY
|
5.31
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2015
|
Stage-I Approval on
|
:
|
15 Apr 2016
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
08 May 2025
|
7
|
Uttarakhand
|
FP/UK/ROAD/11435/2015
|
8B/UCP/06/54/2016/FC
|
Under CM Announcement in Distt Dehradun Block Kalsi Construction of Road From Village Plan To Village Vihar
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.2715
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2015
|
Stage-I Approval on
|
:
|
26 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
01 May 2025
|
8
|
Uttarakhand
|
FP/UK/ROAD/20099/2016
|
8B/UCP/06/215/2016/FC
|
Vijaypur Pahadpani MR
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.91
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2016
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2025
|
|
|
|
01 May 2025
|
9
|
Uttarakhand
|
FP/UK/ROAD/27337/2017
|
8B/UCP/06/146/2020/FC
|
Construction of Duni Sukunda motor road Extension to Shobhakund motor road (Length 8.00 km)
|
Road
|
PWDKAPKOT
|
4.34
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2017
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
01 May 2025
|
10
|
Uttarakhand
|
FP/UK/ROAD/29205/2017
|
8B/UCP/06/23/2020/FC
|
Construction of Kharlekh Bhanar Km 1 to Nakana Ba sora Motor road (Length 5.00 Km)
|
Road
|
PMGSY
|
3.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2017
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
15 Apr 2025
|
11
|
Uttarakhand
|
FP/UK/ROAD/23224/2016
|
8B/UCP/06/159/2019/FC/14
|
Construction of Rikhari-Wachham motor road Km 40 to Kuwari in District-Bageshwar
|
Road
|
PMGSY
|
19.084
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2016
|
Stage-I Approval on
|
:
|
30 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
04 Apr 2025
|
12
|
Uttarakhand
|
FP/UK/ROAD/145560/2021
|
8B/UCP/06/63/2022/FC
|
Dwarikhal Barsuri Motor Marg (KM 0.00 TO KM 0.500)
|
Road
|
EXECUTIVE ENGINEER
|
0.252
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2021
|
Stage-I Approval on
|
:
|
19 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2024
|
|
|
|
18 Mar 2025
|
13
|
Uttarakhand
|
FP/UK/ROAD/143612/2021
|
8B/UCP/06/91/2021/FC
|
Madaknali surkhal Surkhal Pathak
|
Road
|
EE TY DIV PWD BERINAG
|
3.1
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jul 2021
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
11 Mar 2025
|
14
|
Uttarakhand
|
FP/UK/ROAD/34354/2018
|
8B/UCP/06/91/2019/FC
|
Fuleth-Kyara Motor Road Km 5.00 (Bhagdwari Khal) to bhutsi Link Motor Road
|
Road
|
URRDA
|
3.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2018
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2024
|
|
|
|
10 Mar 2025
|
15
|
Uttarakhand
|
FP/UK/ROAD/10168/2015
|
8B/UCP/06/170/2015
|
Sanglakoti - Bhedgoun - Gudinda Motor Road upto Tilkholi - Jajedi
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.796
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2015
|
Stage-I Approval on
|
:
|
21 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2024
|
|
|
|
28 Feb 2025
|
16
|
Uttarakhand
|
FP/UK/ROAD/12309/2015
|
8B/UCP/06/224/2015/FC
|
DHANKRI KHAL TOK TWO CHOKI KHAL VIA KASANA VICHALA M/R
|
Road
|
PWD
|
1.08
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
Stage-I Approval on
|
:
|
21 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2024
|
|
|
|
28 Feb 2025
|
17
|
Uttarakhand
|
FP/UK/ROAD/15675/2015
|
8B/UCP/06/124/2016
|
Construction of Gwatoli-Kareempur to Freedom Fighter Shri Ram Datt Joshi Village Length 2.00
|
Road
|
PWDKAPKOT
|
1.687
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Sep 2015
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2024
|
|
|
|
28 Feb 2025
|
18
|
Uttarakhand
|
FP/UK/ROAD/20557/2016
|
8B/UCP/06/53/2020/FC
|
Const. of Kunjkhal - Barsund Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.575
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2016
|
Stage-I Approval on
|
:
|
19 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2024
|
|
|
|
28 Feb 2025
|
19
|
Uttarakhand
|
FP/UK/ROAD/31821/2018
|
8B/UCP/06/154/2018/FC
|
Under District Plan ,New construction of road from silangi to sainj
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2018
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Sep 2024
|
|
|
|
28 Feb 2025
|
20
|
Uttarakhand
|
FP/UK/ROAD/33229/2018
|
8B/UCP/06/07/2023/FC
|
Kathpatiya-Gudauli to Daula Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
1.1925
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2018
|
Stage-I Approval on
|
:
|
21 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2024
|
|
|
|
28 Feb 2025
|
21
|
Uttarakhand
|
FP/UK/IRRIG/34614/2018
|
8B/UCP/02/127/2018/FC
|
Construction of Kolidhek Lake in Lohaghat District Champawat.
|
Irrigation
|
IRRIGATION DEPARTMENT UTTARAKHAND
|
4.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2018
|
Stage-I Approval on
|
:
|
05 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2024
|
|
|
|
28 Feb 2025
|
22
|
Uttarakhand
|
FP/UK/ROAD/45289/2020
|
8B/UCP/06/74/2020/FC
|
Construction of Kimtoli to Kot Motor Road Under PMGSY Champawat
|
Road
|
PMGSY
|
1.995
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Apr 2020
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Dec 2024
|
|
|
|
28 Feb 2025
|
23
|
Uttarakhand
|
FP/UK/ROAD/46712/2020
|
8B/UCP/06/123/2020/FC
|
C/o Sall Bhatkote to Sukna Salyudi Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
3.78
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2020
|
Stage-I Approval on
|
:
|
16 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2024
|
|
|
|
28 Feb 2025
|
24
|
Uttarakhand
|
FP/UK/ROAD/141441/2021
|
8B/UCP/06/142/2021/FC
|
Construction of motor road in Km. 6 of Talla Ramgarh Ratighat motor road of Kimupani Thandev to Sammandir of Samdhar in Distt. Nainital under State Sector.
|
Road
|
EE CD NAINITAL
|
3.555
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2021
|
Stage-I Approval on
|
:
|
27 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2024
|
|
|
|
28 Feb 2025
|
25
|
Uttarakhand
|
FP/UK/WATER/26619/2017
|
8B/UCP/09/64/2018/FC
|
JOSHIMATH LONG TERM W/S SCHEME
|
Drinking Water
|
PEY JAL NIGAM GOPESWAR
|
1.149
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2017
|
Stage-I Approval on
|
:
|
29 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
27 Feb 2025
|
26
|
Uttarakhand
|
FP/UK/ROAD/10731/2015
|
8B/UCP/06/213/2015/FC
|
Kanda-Saniudiyar-Rawatsera motor road Kotpatal Band to Bhadora-Bajirod motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.84
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Mar 2015
|
Stage-I Approval on
|
:
|
22 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
24 Feb 2025
|
27
|
Uttarakhand
|
FP/UK/ROAD/12466/2015
|
8B/UCP/06/101/2015/FC
|
Wheel Kulwan to Juna State Missing link motor road in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.91
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2015
|
Stage-I Approval on
|
:
|
22 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
24 Feb 2025
|
28
|
Uttarakhand
|
FP/UK/ROAD/21524/2016
|
8B/UCP/06/81/2017/FC
|
Construction of Mankot-Baset motor road in District-Bageshwar (CM Ghosna-2122/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.369
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2016
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
24 Feb 2025
|
29
|
Uttarakhand
|
FP/UK/ROAD/28915/2017
|
8B/UCP/06/114/2018/FC
|
Bageshwar Kapkot Tejam MR Km 57 to Badhi Panyali MR
|
Road
|
PMGSY
|
3.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2017
|
Stage-I Approval on
|
:
|
09 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2024
|
|
|
|
21 Feb 2025
|
30
|
Uttarakhand
|
FP/UK/ROAD/23612/2017
|
8B/UCP/06/20/2018/FC
|
Talsari Tok To Gaundar Motor Road
|
Road
|
EECDPWDUKM
|
4.005
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2017
|
Stage-I Approval on
|
:
|
26 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
20 Feb 2025
|
31
|
Uttarakhand
|
FP/UK/ROAD/13205/2015
|
8B/UCP/06/292/2015/FC
|
Sauda Dwara to Chamoli Chawk Motar Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2015
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2024
|
|
|
|
10 Feb 2025
|
32
|
Uttarakhand
|
FP/UK/Others/41466/2019
|
8B/UCP/09/12/2021/FC
|
Construction of sport stadium of village kholi in distt Bageshwar
|
Others
|
DISTRICT SPORTS OFFICE BAGESHWAR
|
2.848
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2019
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
10 Feb 2025
|
33
|
Uttarakhand
|
FP/UK/RAIL/151179/2022
|
8B/UCP/07/42/2022/FC
|
Development of 126 Km Long New BG Rail Link Between Rishikesh to Karnprayag - Additional Forest Land Requirement for Providing connectivity to Portal P1 of Tunnel (T2) to Main Highway NH-56 at Shivpur
|
Railway
|
CPM RISHIKESH OFFICE RAIL VIKAS NIGAM LIMITED
|
1.1206
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jan 2022
|
Stage-I Approval on
|
:
|
14 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jul 2024
|
|
|
|
10 Feb 2025
|
34
|
Uttarakhand
|
FP/UK/ROAD/27732/2017
|
8B/UCP/06/64/2019/FC
|
Construction of Tharali Kurar Motor Road, km-15 to Gummar Lagga Gerur Link Motor Road under PMGSY in phase-XVI
|
Road
|
RES PMGSY KARANPERAYAG
|
1.825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
17 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
31 Jan 2025
|
35
|
Uttarakhand
|
FP/UK/ROAD/38048/2019
|
8B/UCP/06/42/2020/FC
|
C/o Naugaon to Kanarichhina Motor road distt almora
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.377
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
30 Jan 2025
|
36
|
Uttarakhand
|
FP/UK/ROAD/34286/2018
|
8B/UCP/06/31/2020/FC
|
Gangani To Bhangeli Motor Road.
|
Road
|
PMGSY ID UTTARKASHI
|
1.316
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2024
|
|
|
|
28 Jan 2025
|
37
|
Uttarakhand
|
FP/UK/ROAD/18757/2016
|
8B/UCP/06/59/2017/FC
|
Fatgali-Damoli-Malujhal-Ukhalso motor road in District Bageshwar (CM Ghosna-804/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.103
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
22 Jan 2025
|
38
|
Uttarakhand
|
FP/UK/ROAD/41387/2019
|
8B/UCP/06/187/2019/FC
|
RAMA TO SYALUKA
|
Road
|
PMGSYID PUROLA
|
4.536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
21 Jan 2025
|
39
|
Uttarakhand
|
FP/UK/ROAD/39349/2019
|
8B/UCP/06/76/2020/FC
|
Diversion of forest land for widening and strengthening of existing road from Km 399.000 to Km 460.000 of NH-07 (Old NH-58) under Badrinath Forest Division in Chamoli District of Uttarakhand.
|
Road
|
MORTH (NHIDCL)
|
40.8916
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2019
|
Stage-I Approval on
|
:
|
29 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
15 Jan 2025
|
40
|
Uttarakhand
|
FP/UK/ROAD/45667/2020
|
8B/UCP/06/101/2020/FC
|
Kalimati Chittor Ghaishen to Upper talai
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.5225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2020
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2024
|
|
|
|
15 Jan 2025
|
41
|
Uttarakhand
|
FP/UK/ROAD/29432/2017
|
8B/UCP/06/105/2017
|
Bayana to Syaba motor road
|
Road
|
PMGSY ID UTTARKASHI
|
3.318
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2017
|
Stage-I Approval on
|
:
|
26 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2024
|
|
|
|
13 Jan 2025
|
42
|
Uttarakhand
|
FP/UK/ROAD/45839/2020
|
8B/UCP/06/97/2020/FC
|
Thano Bhogpur Motor road KM 3 to 240 mitre PSC Motor Bridge
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2020
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2024
|
|
|
|
09 Jan 2025
|
43
|
Uttarakhand
|
FP/UK/ROAD/10142/2015
|
8B/UCP/06/82/2015/FC
|
Construction of Chamdeval to Nidil M/R under PMGSY Champawat.
|
Road
|
PMGSY
|
5.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2015
|
Stage-I Approval on
|
:
|
23 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2024
|
|
|
|
06 Jan 2025
|
44
|
Uttarakhand
|
FP/UK/ROAD/16309/2015
|
8B/UCP/06/60/2016/FC
|
Santi Bazar-Mathkhal-Talla Doba motor road in District-Bageshwar (CM Ghosna-663/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.993
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
13 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
06 Jan 2025
|
45
|
Uttarakhand
|
FP/UK/ROAD/16041/2015
|
8B/UCP/06/199/2019/FC
|
Banderlima Harkhola Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2015
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2024
|
|
|
|
27 Dec 2024
|
46
|
Uttarakhand
|
FP/UK/ROAD/143491/2021
|
8B/UCP/06/109/2021/FC
|
construction of khandoliya khet to kola-pultanda motor road of block nanidanda, constituency Lansdowne dist pauri garhwal under state sector
|
Road
|
PWD LANSDOWNE
|
0.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
Stage-I Approval on
|
:
|
17 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2024
|
|
|
|
24 Dec 2024
|
47
|
Uttarakhand
|
FP/UK/Others/148721/2021
|
8B/UCP/09/66/2022/FC
|
Border Out Post Thapliyalkhera with link road
|
Others
|
57TH BN SSB SITARGANJ
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Oct 2021
|
Stage-I Approval on
|
:
|
21 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2024
|
|
|
|
24 Dec 2024
|
48
|
Uttarakhand
|
FP/UK/ROAD/13390/2015
|
8B/UCP/06/102/2018/FC
|
ringalgarh to darak motor road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2015
|
Stage-I Approval on
|
:
|
07 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2024
|
|
|
|
18 Nov 2024
|
49
|
Uttarakhand
|
FP/UK/ROAD/21220/2016
|
8B/UCP/06/70/2019/FC
|
construction of Bakriya Bend to Chhimta link Motor Road under PMGSY.
|
Road
|
RES PMGSY KARANPERAYAG
|
4.72
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2018
|
Stage-I Approval on
|
:
|
13 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
11 Nov 2024
|
50
|
Uttarakhand
|
FP/UK/WATER/40701/2019
|
8-16/2020-FC
|
SONG DAM DRINKING WATER PROJECT
|
Drinking Water
|
INFRASTRUCTURE (REHAB)DIVISION RISHIKESH, DEHRADUN
|
127.6712
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2019
|
Stage-I Approval on
|
:
|
05 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2024
|
|
|
|
28 Oct 2024
|
|