List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttarakhand FP/UK/Others/33089/2018 8B/UCP/09/95/2018/FC This parking situated at main market dhanaulti. this will reduce effect of heavy traffic in main dhanaulti. Others PUBLIC WORKS DEPARTMENT 0.14 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Apr 2018
Stage-I Approval on : 10 Jun 2019
Compliance Report Submitted by User Agency on : 16 Mar 2020
22 May 2020
2 Uttarakhand FP/UK/TRANS/36685/2018 8B/UCP/04/43/2019/FC The above Transmission line will be used to evacuate the Hydro power of NTPC 520 MW (Tapovan-Vishnugad) HEP and 444 MW HEP of THDC(Pipalkoti) . By construction of above line it will generate directly and indirectly huge employment in the state of Uttrakhand and also state will get 12 % free royalty. Transmission Line POWER TRANSMISSION CORPORATION OF UTTRAKHAND LTD 87.311 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Oct 2018
Stage-I Approval on : 11 Oct 2019
Compliance Report Submitted by User Agency on : 27 Feb 2020
22 May 2020
3 Uttarakhand FP/UK/ROAD/36427/2018 1(145)/2019 Ghorakhal – Dhuali MR Km 2 to Baherigaon motor road is to be formulated for village, which are having population more than 250. Targeted village Baherigaon has population 263 but yet not connected with road despite of being the nearest village of district head quarter. Road PMGSY 0.7825 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Oct 2018
Stage-I Approval on : 11 Dec 2019
Compliance Report Submitted by User Agency on : 22 Feb 2020
29 Apr 2020
4 Uttarakhand FP/UK/ROAD/42019/2019 1(132)/2019 Presently the villagers of Langha and Binhar shell be benefited to construction of this Motor road. People meet their daily needs ,as there is no road connecting the villages. Due to the non-existence of any road connectivity ,the lives of the villagers are in constant danger as there are no medical Road RURAL WORKS DEPARTMENT 0.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Sep 2019
Stage-I Approval on : 18 Oct 2019
Compliance Report Submitted by User Agency on : 10 Feb 2020
18 Mar 2020
5 Uttarakhand FP/UK/ROAD/30095/2017 8B/UCP/06/37/2018/FC The road is for providing connectivity to 4 no villages with a total population of 1424 and situated in Tehsil Dhari of District Nainital. The total length of the road is 10.150 km. The road passes through Reserve Forest land, Van Panchayat land, and civil land and Nap land. Road PUBLIC WORK DEPARTMENT 7.5825 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Nov 2017
Stage-I Approval on : 27 Sep 2018
Compliance Report Submitted by User Agency on : 19 Jan 2019
26 Feb 2020
6 Uttarakhand FP/UK/ROAD/19834/2016 01(146)/2018 The Total length of road is 2.00 Km. This road will connect Sira village. For construction of this road 0.952 Hect. of Reserve Forest and 0.448 Hect. Non Forest land will be effected. Road EXECUTIVE ENGINEER 0.952 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jun 2016
Stage-I Approval on : 09 Jan 2018
Compliance Report Submitted by User Agency on : 18 Jun 2019
25 Feb 2020
7 Uttarakhand FP/UK/ROAD/32231/2018 1(74)/2017 This road connect Mason village to Loldu-Dang motar road which gives direct conectivity to villagers.This road will lead to economic development of thousand of people Road EXECUTIVE ENGINEER PD PWD UTTARKASHI 0.409 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Mar 2018
Stage-I Approval on : 12 Jun 2018
Compliance Report Submitted by User Agency on : 04 Dec 2018
25 Feb 2020
8 Uttarakhand FP/UK/Others/19863/2016 8B/UCP/09/212/2016/FC Nagar Palika Pauri ke kuda nishtaran hetu compactor machine and warming composting. Others NAGAR PALIKA PARISHAD PAURI 1.007 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jun 2016
Stage-I Approval on : 22 Feb 2018
Compliance Report Submitted by User Agency on : 20 Jul 2018
19 Feb 2020
9 Uttarakhand FP/UK/VELEC/28604/2017 8B/UCP/09/63/2017 This is one of the revenue village which is left out from electrification due to non clreance of forest.in this time this village has been selected for eletrification central funded scheme under DDUGJY of block bhilangna distt tehri garhwal Village Electricity UPCL 4.06 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Aug 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 20 Oct 2018
19 Feb 2020
10 Uttarakhand FP/UK/ROAD/8652/2014 8B/UCP/06/207/2015/FC The length of road is 1 km. this road starts from Km 3 of pre. const. Bagarwaldhar Barsil motor road Road PUBLIC WORK DEPARTMENT 0.595 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Dec 2014
Stage-I Approval on : 26 Oct 2017
Compliance Report Submitted by User Agency on : 15 May 2019
13 Feb 2020
11 Uttarakhand FP/UK/Others/23179/2016 8B/UCP/09/16/2017/FC In few year hanspurkhatta area are affected to maoists & unlawful criminal activities & it’s 11 km large area. there is no security agency. So that reason a police choki established very urgent in hanspurkhatta Others UTTARAKHAND POLICE DISTRICT NAINITAL 0.1625 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Dec 2016
Stage-I Approval on : 04 Dec 2017
Compliance Report Submitted by User Agency on : 06 Feb 2020
13 Feb 2020
12 Uttarakhand FP/UK/ROAD/15408/2015 8B/UCP/06/35/2016/FC To provide road connectivity for village-Nismor (Population-531).Minimum forest land route is selected because there is no any other forestless route to provide connectivity to Nismor. construction of this road is necessary for the development of villagers.after the construction of road, villagers c Road PMGSY ID UTTARKASHI 0.238 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Sep 2015
Stage-I Approval on : 19 Nov 2018
Compliance Report Submitted by User Agency on : 03 Jun 2019
07 Feb 2020
13 Uttarakhand FP/UK/VELEC/28564/2017 8B/UCP/09/62/2017 This is one of the revenue village which is left out from electrification due to non- avalability of forest clearance this time village has been selected for electrification central funded scheme in DDUGJY Village Electricity UPCL 1.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Aug 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 20 Oct 2018
07 Feb 2020
14 Uttarakhand FP/UK/ROAD/16879/2015 8B/UCP/06/172/2016/FCA Tuini chandani to pivnal motor road under PMGSY scheme under phase XIV of length 23.325 km. This road will connect the four villages which are under one gram panchayat pivnal having population of 1800 approx. Road EXECUTIVE ENGINEER 4.94 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jan 2016
Stage-I Approval on : 12 Oct 2017
Compliance Report Submitted by User Agency on : 08 Jun 2018
04 Feb 2020
15 Uttarakhand FP/UK/ROAD/33524/2018 1(210)/2018 The location of Bridge at Ghat block, Dist Chamoli, Uttarakhand and benefited villages Lankhi, Senjichack vansvada, Kuntri gawad. Approax person = 1528 Person Road PUBLIC WORKS DEPARTMENT 0.033 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 May 2018
Stage-I Approval on : 11 Dec 2018
Compliance Report Submitted by User Agency on : 17 Dec 2019
03 Feb 2020
16 Uttarakhand FP/UK/Others/27134/2017 8B/UCP/09/148/2018/FC Under Mussoorie sewerage scheme one no. of STP for Arcadia zone cap. 0.70 MLD has been proposed. Others UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 0.02 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jul 2017
Stage-I Approval on : 30 Apr 2019
Compliance Report Submitted by User Agency on : 30 Jul 2019
31 Jan 2020
17 Uttarakhand FP/UK/ROAD/40078/2019 8B/UCP/06/66/2019/FC The proposed road is for providing the connectivity to the village Musmola with a population of 285. The road is located in District Tehri (Uttarakhand). The total length of the road is 5.400 Km. Road PMGSY PWD KIRTINAGAR 2.96 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 May 2019
Stage-I Approval on : 02 Sep 2019
Compliance Report Submitted by User Agency on : 18 Nov 2019
16 Jan 2020
18 Uttarakhand FP/UK/WATER/38629/2019 2(52)/2019 This proposed program is to be implemented by Uttarakhand Jal Sansthan . Objective of the program is to provide an adequate, continuous water supply on 24*7 basis with 12 m terminal pressure and metered drinking water supply to Rishikesh dehat peri urban households. Drinking Water JAL BHAWAN UTTARAKHAND JAL SANSTHAN 0.372 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2019
Stage-I Approval on : 10 Oct 2019
Compliance Report Submitted by User Agency on : 26 Dec 2019
26 Dec 2019
19 Uttarakhand FP/UK/ROAD/10160/2015 1(80)/2016 Rikholi-Nail-Jagdi-Sera motor road Road PWD CD GAIRSAIN 3.22 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Feb 2015
Stage-I Approval on : 30 Mar 2016
Compliance Report Submitted by User Agency on : 18 Jul 2019
25 Dec 2019
20 Uttarakhand FP/UK/ROAD/13839/2015 1(20)/2016 under the state sector new construction of rano -kwinthi-tauli -gaillun motor road of 3 km in district chamoli (uttarakhand) Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 1.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jul 2015
Stage-I Approval on : 06 Feb 2016
Compliance Report Submitted by User Agency on : 08 May 2019
25 Dec 2019
21 Uttarakhand FP/UK/ROAD/7355/2014 1(41)/2015 Bungachina to Kusail Motor Road under PMGSY Road PUBLIC WORK DEPARTMENT 4.984 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2014
Stage-I Approval on : 24 Mar 2015
Compliance Report Submitted by User Agency on : 28 Dec 2018
24 Dec 2019
22 Uttarakhand FP/UK/ROAD/13453/2015 1(485)/2015 Construction of Nyay Pancayat Mukhyalya Ustoli Motor Road in District Chamoli. (Length 10.00 Km) Road PUBLIC WORKS DEPARTMENT 4.564 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 01 Jun 2019
24 Dec 2019
23 Uttarakhand FP/UK/ROAD/14462/2015 1(139)/2016 This road will provide connectivity to sunoda and Matiyana village from daudha village and ends at mathiyana village. So it is necessary to construct this road. So that the village could approach to main road. It will help the childrens and senior citizen in emergency Road PUBLIC WORKS DEPARTMENT 0.91 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Aug 2015
Stage-I Approval on : 31 May 2016
Compliance Report Submitted by User Agency on : 10 Jan 2019
24 Dec 2019
24 Uttarakhand FP/UK/ROAD/14462/2015 1(139)/2016 This road will provide connectivity to sunoda and Matiyana village from daudha village and ends at mathiyana village. So it is necessary to construct this road. So that the village could approach to main road. It will help the childrens and senior citizen in emergency Road PUBLIC WORKS DEPARTMENT 0.91 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Aug 2015
Stage-I Approval on : 31 May 2016
Compliance Report Submitted by User Agency on : 10 Jan 2019
24 Dec 2019
25 Uttarakhand FP/UK/WATER/38937/2019 02(50)/2019 Dhalwala (Census Town) Water Supply Scheme is proposed in world bank funded water supply program. This proposed program is to be implemented by Uttarakhand Peyjal Nigam. Objective of the program is to provide water supply in different area. Drinking Water EE WORLD BANK PROJECT UNIT UTTARAKHAND PEYJAL NIGAM 0.224 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Feb 2019
Stage-I Approval on : 10 Oct 2019
Compliance Report Submitted by User Agency on : 11 Nov 2019
24 Dec 2019
26 Uttarakhand FP/UK/ROAD/21204/2016 8B/UCP/06/106/2017/FC The road is for providing connectivity to the village Syuni malli situated in block Gairsain of district Chamoli. The Population being served with the road is 425 numbers. Total length of the road is 6.00 km. Road RES PMGSY KARANPERAYAG 4.37 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2017
Stage-I Approval on : 06 Jul 2018
Compliance Report Submitted by User Agency on : 24 Mar 2019
23 Dec 2019
27 Uttarakhand FP/UK/ROAD/13678/2015 1(582)/2015 This road will connect saldogi and Farth villages with main road. Road PUBLIC WORK DEPARTMENT 1.699 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 22 Feb 2019
18 Dec 2019
28 Uttarakhand FP/UK/TRANS/36388/2018 8B/UCP/04/46/2019/FC "Integrated Power Development Scheme "(IPDS), is the flagship project of Central Government for strengthening,improvement of Power Sector and providing Power For All. MoP, Government of India notified IPDS on 3rd December'14. Under this scheme a transmission line (33 kV ) is proposed for Chakrata Transmission Line EE PROJECT RAPDRAP/IPDS 7.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Oct 2018
Stage-I Approval on : 24 Jul 2019
Compliance Report Submitted by User Agency on : 14 Oct 2019
04 Dec 2019
29 Uttarakhand FP/UK/ROAD/7374/2014 1(57)/15 Construction of Sumeti To Bhaitari M/R, Length-7.00km Road PUBLIC WORK DEPARTMENT 3.809 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Sep 2014
Stage-I Approval on : 30 Mar 2015
Compliance Report Submitted by User Agency on : 28 Dec 2018
02 Dec 2019
30 Uttarakhand FP/UK/ROAD/10122/2015 1(263)/2015 the road length is 8.375km for which forest land is required Road PMGSY 4.8107 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2015
Stage-I Approval on : 01 Jul 2015
Compliance Report Submitted by User Agency on : 29 May 2019
02 Dec 2019
31 Uttarakhand FP/UK/ROAD/11123/2015 1(211)/2015 construction of 5.625 km motor raod from barakuna to chalti under pmgsy Road PMGSY 3.717 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Mar 2015
Stage-I Approval on : 01 Jul 2015
Compliance Report Submitted by User Agency on : 26 Apr 2019
02 Dec 2019
32 Uttarakhand FP/UK/ROAD/25766/2017 849/x-4-18(141)/2018 With the construction of this motor road, tourism and travel will be facilitated and employment opportunities for the youth will also be available. The development plans of the government also operate smoothly. this road construction connectivity by public facility school, Hospital & Mandi Dehradun Road PUBLIC WORKS DEPARTMENT 0.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Apr 2017
Stage-I Approval on : 28 Aug 2018
Compliance Report Submitted by User Agency on : 29 Jun 2019
02 Dec 2019
33 Uttarakhand FP/UK/ROAD/10376/2015 1(153)/15 the total length of road is 8.625km Road PMGSY 4 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Feb 2015
Stage-I Approval on : 30 May 2015
Compliance Report Submitted by User Agency on : 29 May 2019
01 Dec 2019
34 Uttarakhand FP/UK/WATER/31878/2018 02(20)/2018 Villagers of the scheme is facing lots of problem as they have to fetch the drinking water from the distance sources. so there for forestland is required for drinking water supply scheme. Drinking Water CONSTRUCTION DIVISION UTTARAKHAND PAYJAL NIGAM 0.192 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Feb 2018
Stage-I Approval on : 09 Jul 2018
Compliance Report Submitted by User Agency on : 05 Feb 2019
15 Nov 2019
35 Uttarakhand FP/UK/ROAD/30395/2017 01(60)/2018 Road is proposed from Km. 2 of Matiyali to Prachin Mandir Kalirow in 4.00 km length Gram Lweshal (Tok-ghatgad) will be directly benefited by motor road and Education, as well as Medicalfacilitywillbe enhance. Road EE CD NAINITAL 0.1125 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Nov 2017
Stage-I Approval on : 16 Mar 2018
Compliance Report Submitted by User Agency on : 07 May 2019
13 Nov 2019
36 Uttarakhand FP/UK/ROAD/9243/2015 1(47)/15 This Road will connect Kanyal habitation which starts from Joljibi madkot and it ends at Koli Kanyal.The length of road is 4.200 Km,and passes through civil soyam forest and nap land in which 2.654 hectares of Civil soyam land is required in this project Road Vinod Kumar 2.654 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jan 2015
Stage-I Approval on : 30 Mar 2015
Compliance Report Submitted by User Agency on : 03 May 2019
04 Nov 2019
37 Uttarakhand FP/UK/VELEC/30487/2017 8B/UCP/09/02/2018/FC This is one of the village is still now unelectrified due to non availability of forest clearness. now this work is again proposed in centrally funded DDUGJY. Village Electricity UPCL 2.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Nov 2017
Stage-I Approval on : 13 Feb 2018
Compliance Report Submitted by User Agency on : 03 Apr 2018
25 Oct 2019
38 Uttarakhand FP/UK/Others/27387/2017 8B/UCP/09/41/2018/FC This project has been prepared under "Namami Gange" Programme for pollution control in the river Ganga. For the supply of sewer waste to the Lakkarghat STP, SPS as per the approved estimate is proposed in this land.This project will benefit the locals of nearby area by developing sewerage waste Others UTTARAKHAND PEYJAL NIGAM 0.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2017
Stage-I Approval on : 30 Nov 2018
Compliance Report Submitted by User Agency on : 01 Feb 2019
11 Oct 2019
39 Uttarakhand FP/UK/ROAD/10049/2015 8B/UCP/06/15/2017/FC This link road is proposed to give connectivity to Akhandwali Bhilang Village benefiting population around 1000 persons. Road PMGSY ID DEHRADUN 3.45 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Feb 2015
Stage-I Approval on : 03 Jul 2018
Compliance Report Submitted by User Agency on : 28 Nov 2018
02 Sep 2019
40 Uttarakhand FP/UK/RAIL/34889/2018 8B/UCP/07/18/2019/FC The diversion of Forest land proposal in favour of Indian Railways for the entire project is being submitted in two phases. In Phase-I, from Km 0 to Km 6 falling in Dehradun F.D. and in Phase-II from Km 6 to Km 126 falling in various other F.D.This Additional Land is Situated in Phase-II at Chain Railway RAIL VIKAS NIGAM LIMITED 1.5205 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Aug 2018
Stage-I Approval on : 22 Apr 2019
Compliance Report Submitted by User Agency on : 15 Jun 2019
02 Sep 2019
41 Uttarakhand FP/UK/Others/14616/2015 8B/UCP/09/94/2017/FC Mussooorie is a famous tourist place and to keep it neat and clean efforts are being don by various Dept. Under UIDSSMT Programme of Govt. of India Uttarakhand Payjal Nigam, Mussoorie has been allotted to construct a sewerage line from Makinan pump house to ITBP campus. Others UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 0.1186 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Sep 2015
Stage-I Approval on : 19 Nov 2018
Compliance Report Submitted by User Agency on : 09 Apr 2019
29 Aug 2019
42 Uttarakhand FP/UK/IRRIG/29972/2017 8B/UCP/02/45/2018/FC The Proposed Lake Sanctioned under C.M. Declaration 87/2017 dated on 19-06-2017 along Jakhan River, Block Doiwala. After construction of this project benefited local habitation to provide drinking water, agricultural & increase employment & tour & tourism progress development this area working progr Irrigation IRRIGATION DEPARTMENT UTTARAKHAND 3.69 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2017
Stage-I Approval on : 24 Oct 2018
Compliance Report Submitted by User Agency on : 01 Feb 2019
07 Aug 2019
43 Uttarakhand FP/UK/ROAD/11294/2015 8b/UCP/06/147/2015/FC Forest land Proposal of Construction of Pathuli to Gairar Motor Road length 7.700 Km Under PMGSY Road PMGSY 4.738 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Mar 2015
Stage-I Approval on : 15 Mar 2018
Compliance Report Submitted by User Agency on : 26 Dec 2018
01 Aug 2019
44 Uttarakhand FP/UK/ROAD/11782/2015 8B/UCP/06/159/2015/FC Construction of Goluchhina Srikhet Motor Road KM 08 to Gomri Motor Road in Someswer constituency,Distt Almora.Construction of Goluchhina Srikhet Motor Road KM 08 to Gomri Motor Road is proposed as a extension of Goluchhina Srikhet motor road the sention lenth of proposed motor road is 1.00 km. Road EXECUTIVE ENGINEER 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Apr 2015
Stage-I Approval on : 31 Aug 2017
Compliance Report Submitted by User Agency on : 06 May 2019
02 Jul 2019
45 Uttarakhand FP/UK/ROAD/39348/2019 1(26)/2019 Diversion of forest land for stabilization of land slide at Hathipahar, Benakuli land slide, Taya bridge re-alignment and muck disposal sites and strengthening of road from Km 489.00 (Marwari) to Km 528.00 (Mana) of NH-07 (Old NH-58) Road JOSHIMAT BRTF 24.793 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Mar 2019
Stage-I Approval on : 15 Apr 2019
Compliance Report Submitted by User Agency on : 08 May 2019
20 Jun 2019
46 Uttarakhand FP/UK/ROAD/15100/2015 8B/UCP/06/258/2016/FC This road joining the village agar manral in almora distt at uttrakhand Road PUBLIC WORK DEPARTMENT 3.78 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Sep 2015
Stage-I Approval on : 09 Nov 2018
Compliance Report Submitted by User Agency on : 26 Apr 2019
12 Jun 2019
47 Uttarakhand FP/UK/VELEC/30475/2017 8B/UCP/09/01/2017/FC This is one of the village is still unelectrified due to nonavailablity of forest clearness.now this time village is again selected for electrification under centrally funded DDUGJY. Village Electricity UPCL 2.09 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2017
Stage-I Approval on : 13 Feb 2018
Compliance Report Submitted by User Agency on : 20 Oct 2018
12 Jun 2019
48 Uttarakhand FP/UK/WATER/20621/2016 8B/UCP/08/200/2016/FC By the construction of this scheme a total population of twenty eight villages 18871 people. The villagers suffering from lack of water almost all part of the year. This project will provide sufficient water to them. Drinking Water UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 1.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jul 2016
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 23 Apr 2018
31 May 2019
49 Uttarakhand FP/UK/IRRIG/34012/2018 8B/UCP/02/90/2018/FC In the year 1996, Govt. of Nepal and Govt. of India have entered into a bilateral agreement called Mahakali Treaty, As per treaty 1.2 Km long Indo- Nepal irrigation canal taking off from Tanakpur Barrage for release of 1000 cusecs of water in monsoon season (15th May to 15 Octuber) and 300cusecs in Irrigation NHPC LMITED 12 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jun 2018
Stage-I Approval on : 14 Dec 2018
Compliance Report Submitted by User Agency on : 22 Feb 2019
31 May 2019
50 Uttarakhand FP/UK/ROAD/12837/2015 8B/UCP/06/25/2016/FC Under state sector,Hona'ble chief minister uttarakhand declaration construction of new motor road 'Karanprayag-nauti-paithani to Malai' of length 1.625 km. Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.45 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 May 2015
Stage-I Approval on : 12 Jan 2018
Compliance Report Submitted by User Agency on : 02 Feb 2019
29 May 2019