Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Rajasthan
|
FP/RJ/SCH/148169/2021
|
1(142)forest/2022
|
Diversion of 0.9830 Hector for construction of Existing School established since 1963 for Extension Government Secondary School at Village-Rampura Nyola , Tehsil-Suratgarh,District -Sri Ganganagar (Rajasthan)”
|
School
|
DISTRICT EDUCATION OFFICER SECONDARY EDUCATION SHRI GANGANAGAR
|
0.983
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2021
|
Stage-I Approval on
|
:
|
24 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
25 Jun 2025
|
2
|
Rajasthan
|
FP/RJ/TRANS/44981/2020
|
8B/Raj/04/9/2021/FC
|
Construction of 765 KV DC Fatehgarh II to Bhadla II Transmission Line, District - Jodhpur, Raj
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
2.8874
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2020
|
Stage-I Approval on
|
:
|
25 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
06 Jun 2025
|
3
|
Rajasthan
|
FP/RJ/TRANS/44930/2020
|
8B/RAJ/04/10/2021
|
400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
4.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2020
|
Stage-I Approval on
|
:
|
18 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
02 Jun 2025
|
4
|
Rajasthan
|
FP/RJ/ROAD/30812/2017
|
F.1(81)Forest/2017
|
Diversion of Construction for Mandalgarh -Goth Link Road 0.836163 ha.
|
Road
|
NAGAR PALIKA MANDALGARH
|
0.836163
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Dec 2017
|
Stage-I Approval on
|
:
|
21 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2025
|
|
|
|
27 May 2025
|
5
|
Rajasthan
|
FP/RJ/Approach/149635/2021
|
8B/RAJ001/2023-JPR
|
Construction of Approach Road for Proposed Indian Oil Corporation Limited Retail Outlet on Birdhawal to Chhatargarh Road between KM Stone No. 43-44 (Chainage: 43/195 - 43/230) LHS in Kila No. 16, 17/2, Plot No. 23/30, Murba No. 19 Village-2 DOA, Tehsil - Suratgarh, District- Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.0614
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2025
|
|
|
|
11 Mar 2025
|
6
|
Rajasthan
|
FP/RJ/ROAD/140718/2021
|
1(19)forest/2022
|
Construction of Approach Road for Proposed Hindustan Petroleum Corp. Ltd. Retail Outlet on Suratgarh - Mile 80 Road between KM Stone No. 46-47 (Chainage: 46/002 - 46/037) RHS in At Murabba No 19, Pathhar No 4/37, Killa No 23, Village-2 DOB, Tehsil - Suratgarh, District- Sri Ganganagar, Rajasthan
|
Road
|
HINDUSTAN PETROLEUM CORPORATION LTD.
|
0.1262
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2021
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
12 Feb 2025
|
7
|
Rajasthan
|
FP/RJ/OFC/43151/2019
|
1(76)forest/2020
|
Laying of Uder Grouond Optical Fibre Cable From Jaipur (Nindar Mod) to Kaladera ( Via Nindar, Jairampura ,Jahota, Jalsoo, Raghunathpura & Mundiya ) for Jio Digital Fiber Private Limited”
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.035
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2019
|
Stage-I Approval on
|
:
|
29 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jan 2025
|
|
|
|
10 Feb 2025
|
8
|
Rajasthan
|
FP/RJ/Approach/148689/2021
|
1(105)Forest/2023
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Bikaner-Sri Ganganagar Road (NH-62) between KM Stone No. 189 - 190 (Chainage: 189.692 to 189.727) RHS in Kila No 9 & 10 Murbba No 11, at Village - 17 STB, Tehsil-Suratgarh, District - Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.1817
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2021
|
Stage-I Approval on
|
:
|
20 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2025
|
|
|
|
06 Feb 2025
|
9
|
Rajasthan
|
FP/RJ/ROAD/40754/2019
|
8B/Raj/06/16/2020/FC
|
Construction of Approach Road for Proposed Nayara Energy Limited (Formerly Essar Oil Ltd.) Retail Outlet on Suratgarh - Sri Ganganagar NH-62 ,Between Chainage ms stone 209/390 -209/430(RHS)
|
Road
|
NAYARA ENERGY LIMITED
|
0.1685
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2019
|
Stage-I Approval on
|
:
|
17 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
05 Feb 2025
|
10
|
Rajasthan
|
FP/RJ/TRANS/150764/2022
|
8B/RAJ030/2022-JPR
|
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line
|
Transmission Line
|
AVAADA ENERGY PRIVATE LIMITED
|
0.9625
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jan 2022
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
05 Feb 2025
|
11
|
Rajasthan
|
FP/RJ/TRANS/120030/2021
|
8B/Raj/12/28/2021/FC
|
132 KV S/C Raisinghnagar - Jetsar (M/s NTPC) Transmission Line, District-Sri Ganganagar, Rajasthan (Total Length 17893 meters).
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
0.0972
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
03 Feb 2025
|
12
|
Rajasthan
|
FP/RJ/ROAD/46675/2020
|
8B/RAJ/06/36/2020
|
Construction of Approach Road for Proposed Bio-Diesel Plant, on NH-62(Old-NH-15) Chainage No 209+621 to 209 +671(RHS)AT Chak 7 BLW,SQ No-55,Killa No 21-25 At Village- Kenchiya,Tehsil-Pilibanga , Dist
|
Road
|
M/S JUGGLER HAWK INDUSTRIES PVT. LTD.
|
0.2239
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jul 2020
|
Stage-I Approval on
|
:
|
05 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
13 Jan 2025
|
13
|
Rajasthan
|
FP/RJ/ROAD/18545/2016
|
8B-RAJ046/2022-JPR
|
Construction of Road from Manadar to Rowara Km 5/500 to 9/500
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2016
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2024
|
|
|
|
31 Dec 2024
|
14
|
Rajasthan
|
FP/RJ/OFC/153375/2022
|
1(31)Forest/2023
|
Permission for laying underground OFC in ROW of existing PWD road from Nathdwara to Iswal from Lat/ Long 24°53' 51.08" N/ 73°42' 33.72" E to 24°53' 34.36" N/ 73°41' 55.73" E in Rajsamand District. Total length & area in Forest is 1.365 KM & 0.06143 ha in Rajsamand District, Rajasthan.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.06143
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
Stage-I Approval on
|
:
|
23 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
29 Nov 2024
|
15
|
Rajasthan
|
FP/RJ/OFC/44109/2020
|
1(13)forest/2022
|
Laying of underground OFC within ROW of existing PWD road from Vijaipura-Ratangarh form Lat/long point 24.808472/75.718965° to 24.688055/75.605895° for length & area in forest is 23.222 KM & 1.045 ha and length & area in non-forest is 0.156 Km & 0.007 ha. Total length and area in forest is 23.222 KM & 1.045 ha and in non-forest is 0.156 Km & 0.007
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
1.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2020
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
28 Nov 2024
|
16
|
Rajasthan
|
FP/RJ/OFC/44367/2020
|
1(101)forest/2021
|
laying underground OFC in ROW of existing road from Vijaipur - Ratangarh (MP Border) from Lat/long point 24.705416/75.519275 to 24.735003/75.339779 for total length of 21.252 KM and total area 0.956 ha. (Length and area in Forest are 8.844 KM & 0.398 ha & Length & area in Non -Forest are 12.408 KM & 0.558 ha) along PWD roads in Chittorgarh District
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.398
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2020
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
28 Nov 2024
|
17
|
Rajasthan
|
FP/RJ/OFC/144983/2021
|
1(15)Forest/2023
|
Permission for laying underground OFC in Forest area along road from Vijaipur - Rooppura from Lat/Long 24.791558/75.718341 to 24.765172/75.740787 for total length of 4.063 KM and total area 0.1828 ha in Chittorgarh District, Rajasthan
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.1828
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2021
|
Stage-I Approval on
|
:
|
28 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2024
|
|
|
|
28 Nov 2024
|
18
|
Rajasthan
|
FP/RJ/OFC/43686/2020
|
1(134)forest/2020
|
Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan)
|
Optical Fibre Cable
|
DINESH ENGINEERS LTD.
|
0.3648
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jan 2020
|
Stage-I Approval on
|
:
|
09 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
27 Nov 2024
|
19
|
Rajasthan
|
FP/RJ/OFC/150331/2021
|
1(60)Forest/2023
|
Permission for laying underground OFC in ROW of existing PWD road from Gerhi to Peeplekoot from Lat/ Long 23.845817/74.323689 (village Mundela) to 3.855166/74.448102 (Gangji Ka Khera) in Banswara District. Total length & area in Forest and non-Forest are 6.636 KM & 0.2986 ha and 13.407 & 0.6033 ha respectively in Banswara District, Rajasthan
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.2986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2021
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
27 Nov 2024
|
20
|
Rajasthan
|
FP/RJ/TRANS/23277/2016
|
8B/RAJ025/2023-JPR
|
“Construction of 11 kv Transmission Line Projects of Rajeev Gandhi Gram Vidyutikaran Yojana(RGGVY) in XII Plan for Between Shivshakti Stone Crusher Jinjhari to Village-Bhawan,Tehsil-Sojat,District Pali (Raj)”
|
Transmission Line
|
JODHPUR VIDHYUT VITRAN NIGAM LTD
|
1.764
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2016
|
Stage-I Approval on
|
:
|
22 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2024
|
|
|
|
13 Nov 2024
|
21
|
Rajasthan
|
FP/RJ/TRANS/147919/2021
|
8B-RAJ022/2022-JPR
|
Construction for 132 KV S/C Setrawa-Sekhala Line , Tehsil -Balesar , District -Jodhpur (Rajasthan)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
|
0.1404
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2021
|
Stage-I Approval on
|
:
|
09 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2024
|
|
|
|
13 Nov 2024
|
22
|
Rajasthan
|
FP/RJ/Approach/154227/2022
|
1(149)forest2022
|
“Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Shiv-Nimbla Road NH-68 (Old NH-15) LHS on Chainage 114+570.00 to 114+605.00 on Khasra No 822/506 At Village-Nimbla, Tehsil -Shiv & District – Barmer(Rajasthan)”
|
Approach Access
|
HINDUSTAN PETROLEUM CORPORATION LIMITED
|
0.1801
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2022
|
Stage-I Approval on
|
:
|
09 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Oct 2024
|
|
|
|
06 Nov 2024
|
23
|
Rajasthan
|
FP/RJ/ROAD/6956/2014
|
8B/RJ/06/13/2015
|
Road from Nehroopur to Jhhiri
|
Road
|
PUBLIC WORKS DEPARTMENT
|
3.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
04 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
05 Nov 2024
|
24
|
Rajasthan
|
FP/RJ/ROAD/6999/2014
|
8B/RJ/06/5/2015
|
Road from Dhikoniya to Talawara
|
Road
|
PUBLIC WORKS DEPARTMENT
|
7.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
04 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
05 Nov 2024
|
25
|
Rajasthan
|
FP/RJ/ROAD/144538/2021
|
8B-RAJ040/2022-JPR
|
Construction of Missing Link Road from NH 148 to Moroli via Peepli Patalwas Koliwada Dob Paplaj Mata Sar Dhaun (MDR-145) km 9.00 to 15.00, in the State of Rajasthan (Total Length 4.530 km)
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
3.0207
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jul 2021
|
Stage-I Approval on
|
:
|
20 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Sep 2024
|
|
|
|
05 Nov 2024
|
26
|
Rajasthan
|
FP/RJ/Others/150590/2021
|
8-05/2022-FC
|
Diversion of 466.592 ha. Forest land for Construction of New Green Field Airport Kota, District- Bundi in the State of Rajasthan
|
Others
|
AIRPORT AUTHORITY OF INDIA KOTA
|
466.592
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
27 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Oct 2024
|
|
|
|
01 Nov 2024
|
27
|
Rajasthan
|
FP/RJ/WATER/145797/2021
|
8B/RAJ016/2023-JPR
|
Construction of Intake Well with Pump House, MCC Room, Raising Main Pipeline, Approach Road and HT Transmission Line in Area of Baisasing Dam District-Sirohi, Rajasthan
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
3.6975
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2021
|
Stage-I Approval on
|
:
|
11 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2024
|
|
|
|
07 Oct 2024
|
28
|
Rajasthan
|
FP/RJ/TRANS/143945/2021
|
8B/RAJ034/2022-JPR
|
Construction of Sikar-II_Neemrana 400 KV D/C Transmission Line(Twin HTLS*)in Rajasthan
|
Transmission Line
|
SIKAR NEW TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)
|
13.0134
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2021
|
Stage-I Approval on
|
:
|
22 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Sep 2024
|
|
|
|
30 Sep 2024
|
29
|
Rajasthan
|
FP/RJ/ROAD/49638/2020
|
1(103)forest/2021
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Jaipur - Bikaner Road (NH-11) between KM Stone No. 450-451 (Chainage: 450.394 - 450.439) LHS in Khasra No. 486, At Village - Rajaldesar, Tehsil - Ratangarh, District - Churu, Raj
|
Road
|
Indian Oil Corporation Limited
|
0.0712
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2020
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2024
|
|
|
|
12 Sep 2024
|
30
|
Rajasthan
|
FP/RJ/ROAD/21362/2016
|
8B/RAJ026/2023-JPR
|
Development of Arain-Sarwad Highway, Section of SH-7E, from existing km 44.300 to km 0.000, in the state of Rajasthan
|
Road
|
PWD JAIPUR
|
1.2401
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Sep 2016
|
Stage-I Approval on
|
:
|
13 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
10 Sep 2024
|
31
|
Rajasthan
|
FP/RJ/TRANS/144853/2021
|
8B/RAJ018/2023-JPR
|
Construction of 765 KV D/C Sikar-II -Aligarh Transmission line, District- Sikar, Jaipur & Alwar (Rajasthan)” in Rajasthan Portion Ap-01 to Ap-180 Common Point Rajasthan State Boundary. Total Route Length 180.946 km
|
Transmission Line
|
SIKAR -II ALIGARH TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)
|
15.8321
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2021
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
30 Aug 2024
|
32
|
Rajasthan
|
FP/RJ/ROAD/38150/2019
|
1(30)forest/2020
|
Construction of Approach road jhalra patan railway station
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2019
|
Stage-I Approval on
|
:
|
04 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
23 Aug 2024
|
33
|
Rajasthan
|
FP/RJ/ROAD/38372/2019
|
1(73)forest/2022
|
Construction of sawantkhera to kadagpura road
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2019
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Apr 2024
|
|
|
|
23 Aug 2024
|
34
|
Rajasthan
|
FP/RJ/ROAD/35096/2018
|
8B/RAJ030/2023-BHO
|
Construction of Road Widening & Strengthening of Manoharpur to Itwa Bhopji Via Nawalpura Charanwas (MDR-187)
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.4445
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Sep 2018
|
Stage-I Approval on
|
:
|
28 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
12 Jul 2024
|
35
|
Rajasthan
|
FP/RJ/ROAD/29601/2017
|
8B/UP/06/06/2018/FC
|
PROPOSED DIVERSION OF FOREST LAND FOR RENEWAL,WIDENING & STRENGTHENING OF SIKAR-HARSH ROAD (ODR-04)KM 8/750 TO 15/100 IN HARSHNATH PF VILLAGE- ANTRI TEHSIL-DHOD,DISTT.- SIKAR (RAJ.)
|
Road
|
PUBLIC WORKS DEPATMENT SIKAR
|
6.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2017
|
Stage-I Approval on
|
:
|
28 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2023
|
|
|
|
08 Jul 2024
|
36
|
Rajasthan
|
FP/RJ/ROAD/21211/2016
|
8B/RAJ/06/22/2017/FC
|
Development of Tarnau-Deedwana-Laxmangarh-Mukundgarh, Section of SH-60, SH-20, SH-83, SH-82A & SH-8 from design chainage km 39.668 to km 205.300 of SH-60, in the state of Rajasthan
|
Road
|
PWD JAIPUR
|
84.248
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2016
|
Stage-I Approval on
|
:
|
06 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2022
|
|
|
|
10 Jun 2024
|
37
|
Rajasthan
|
FP/RJ/ROAD/31293/2018
|
8B/Raj/06/09/2020
|
Padisal –Jagta Basai- Ratta Khurd- Balan Basai-Shyamka-Ismailpur- Ganj- Kishangarhbas road.
|
Road
|
PUBLIC WORKS DEPARTMENT NCRPB DIVISION ALWAR
|
5.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2018
|
Stage-I Approval on
|
:
|
07 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2022
|
|
|
|
10 Jun 2024
|
38
|
Rajasthan
|
FP/RJ/ROAD/118453/2021
|
8B/RAJ031/2022-JPR
|
Construction of Road from Jalore City to Jalore Fort (Design Chainage 0+000 km to 5+176 km) Village, Tehsil and District- Jalore in State of Rajasthan
|
Road
|
MUNICIPAL COUNCIL JALORE
|
4.0144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
Stage-I Approval on
|
:
|
20 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2023
|
|
|
|
10 Jun 2024
|
39
|
Rajasthan
|
FP/RJ/ROAD/140782/2021
|
8B/RAJ007/2022-JPR
|
Construction of Proposed Road from Ghoda Gati to Meharangarh Fort, District-Jodhpur in State of Rajasthan (Total Length 2300 meters)
|
Road
|
JODHPUR DEVELOPMENT AUTHORITY, JODHPUR
|
3.579
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2021
|
Stage-I Approval on
|
:
|
08 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 May 2023
|
|
|
|
10 Jun 2024
|
40
|
Rajasthan
|
FP/RJ/TRANS/142545/2021
|
1(106)FOREST/2023
|
Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line ,District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)
|
Transmission Line
|
SIKAR NEW TRANSMISSION LIMITED
|
0.5428
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2021
|
Stage-I Approval on
|
:
|
06 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
20 May 2024
|
41
|
Rajasthan
|
FP/RJ/Others/22621/2016
|
8-10/2022-FC
|
Mahi Banswara Rajasthan Atomic Power Project (MBRAPP)-1 to 4
|
Others
|
NPCIL
|
100.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2016
|
Stage-I Approval on
|
:
|
12 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2023
|
|
|
|
06 May 2024
|
42
|
Rajasthan
|
FP/RJ/Approach/149575/2021
|
1(65)forest/2022
|
“Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on NH -11 (New-NH-21) LHS on Khasra No 476, Chainage 75/776 to 75/824, At Village – Sewla, Tehsil -Nadabai,
|
Approach Access
|
HINDUSTAN PETROLIUM CORPORATION LIMITED
|
0.1409
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2022
|
Stage-I Approval on
|
:
|
09 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2024
|
|
|
|
30 Apr 2024
|
43
|
Rajasthan
|
FP/RJ/OFC/150256/2021
|
1(67)forest/2022
|
Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY in Samoli, Near Sei Nadi,Tin Sara, Kagwas, Subra Subri, Sawan ka kyara to near Guda and Mamer to Bhoori Dheber Gujrat Border in Udaipur Nort
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.606
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2021
|
Stage-I Approval on
|
:
|
24 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Mar 2024
|
|
|
|
25 Apr 2024
|
44
|
Rajasthan
|
FP/RJ/ROAD/18883/2016
|
8B/Raj/06/19/2020/FC
|
Widening and Curve Improvement on Existing Road Alignment .
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
4.47
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2016
|
Stage-I Approval on
|
:
|
30 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2022
|
|
|
|
22 Apr 2024
|
45
|
Rajasthan
|
FP/RJ/OFC/44409/2020
|
1(83)forest/2020
|
Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY From Near Shastri Nagar, Vishveshwar Mahadev, Lohagal Road To Lohagal Panchsheel Road, Nr. Kabir Nagar, Ajmer of total length 1500 mtr.
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.0585
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
Stage-I Approval on
|
:
|
06 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2024
|
|
|
|
26 Mar 2024
|
46
|
Rajasthan
|
FP/RJ/TRANS/43798/2020
|
8B/RAJ019/2023-JPR
|
Construction of 11 kv Transmission Line for Rural Electrification of Bera Sukh Sagar to Village Sand Mangra, Khejdi Ka Bala,Lakha ka Khet, Tehsil-Sojat,District Pali (Raj)
|
Transmission Line
|
JODHPUR VIDHYUT VITRAN NIGAM LTD
|
0.8491
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2020
|
Stage-I Approval on
|
:
|
30 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2024
|
|
|
|
20 Mar 2024
|
47
|
Rajasthan
|
FP/RJ/TRANS/152039/2022
|
8B/RAJ036/2022-JPR
|
“Construction of 33 KV Transmission Line Overhead/ Underground 33 KV XLPE 300 Sq. mm Cable From 400 KV GSS Bhadla to HPCL Rajasthan Refinery Ltd Nachana District -Jaisalmer”
|
Transmission Line
|
JODHPUR VIDYUT VITRAN NIGAM LIMITED , JAISALMER
|
1.5206
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Feb 2022
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2024
|
|
|
|
20 Mar 2024
|
48
|
Rajasthan
|
FP/RJ/ROAD/35614/2018
|
1(19)forest/2020
|
Renewal of Road from Chouth ka Barwara to Nayagaon (0/0 to 4/750 km), District- Sawai Madhopur, Raj.
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
0.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2018
|
Stage-I Approval on
|
:
|
03 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
19 Mar 2024
|
49
|
Rajasthan
|
FP/RJ/TRANS/148899/2021
|
8B/RAJ043/2022-JPR
|
Construction of 132 KV S/C Transmission Line for Power Evacuation from 150 MW Chhattargarh Solar Project of NTPC Renewable Energy Limited (A wholly owned subsidiary of NTPC Limited) to 220 KV Chhattargarh Grid Sub Station District-Bikaner in the State of Rajasthan
|
Transmission Line
|
NTPC RENEWABLE ENERGY LIMITED
|
3.9007
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2021
|
Stage-I Approval on
|
:
|
18 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2024
|
|
|
|
04 Mar 2024
|
50
|
Rajasthan
|
FP/RJ/IRRIG/30576/2017
|
8B/Raj/02/15/2021/FC
|
Construction of canal (LMC& RMC) for gararda medium irrigation project distt. bundi
|
Irrigation
|
EXECUTIVE ENGINEER WR PROJECT DIV BUNDI
|
18.567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2018
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
14 Feb 2024
|
|