  (i). Proposal No. : FP/RJ/TRANS/142545/2021   (ii). Name of Project for which Forest Land is required : Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line, Total Route length 305.900 km District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line, Total Route length 305.900 km District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 83304   (viii). Area of forest land proposed for diversion(in ha.): 0.6231   (ix). Non-forest land required for this project(in ha.): 2048.9069   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : SIKAR NEW TRANSMISSION LIMITED   (ii). Address1 : SIkar 400/220kV Sub-station, Vill.-Bhadadhar, Post-Khuri Badi   (iii). Address2 : 13 th mile stone, sikar-bikaner highway   (iv). State : Rajasthan   (v). District : Sikar   (vi). Pin : 332315   (vii). Landmark : NIL   (viii). Email address : dhan144179@powergrid.in   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 6397627556   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: DHANRAJ   (ii). Middle Name: NIL   (iii). Last Name: ASERI   (iv). Gender: Male   (v). Designation: Deputy Manager   (vi). Address 1: Type V Quarter, TE Tax Building, BSNL Manasar, Nagaur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Nagaur   (x). Tehsil: Nagaur   (xi). Pin: 341001   (xii). Landmark: NIL   (xiii). Email Address: dhan144179@powergrid.in   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 6397627556   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur Territorial0.2212738.8759
2.Nagaur Territorial0.1524922.6788
3.Sikar Territorial0.2495387.3522
Total0.62312048.9069
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur0.2212299.3626
1.Bikaner0439.5133
3.Nagaur0.1524861.9299
4.Churu060.7489
5.Sikar0.2495387.3522
Total0.62312048.9069
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kansingh Ki Seer0.221222.5588
2Gurha019.832
3Kalyan Singh Ki Seer023.517
4Malam Singh Ki Seer014.74
5Ramchanderi012.864
6Sodadhara09.849
7Ramchilla025.326
8Bheru singh ki Dhani015.075
9Pandito ki Dhani018.492
10Bekui ki Dhani022.0564
11Lambasar025.8285
12Meethadiya019.899
13Loona020.5355
14Lumbasar029.8351
15Chimana018.9543
16Dasori017.956
17Khajora021.172
18Bhelu018.291
19Saisar026.8335
20Nehrusar025.594
21Nathusar023.249
22Jato ki dhani010.787
23Raikon ki Dhani020.502
24Mochiyon ki Dhani022.177
25Panchu044.22
26Sangal Dhora021.4735
27Khara034.17
28Hansasar019.3295
29Godaron ki Dhani015.9795
30Shekhasar022.378
31Byau022.914
32Dava015.209
33Charakara020.0531
34Silva020.0531
35Kanvlesar017.1721
36Bu Karamostan027.269
37Chila022.445
38Seori017.956
39Mundasar019.095
40Birmasar010.4185
41Lariya022.847
42Rohini015.678
43Gorera018.157
44Shyamsar012.931
45Jhorra011.859
46Chahu012.261
47Anvliyasar022.311
48Boseri011.792
49Meetha Manjra015.812
50Dodu09.7485
51Kangsiya015.343
52Talniau018.693
53Surpaliya021.4065
54Mundiau09.3465
55Khabriyana011.1555
56Gorau012.596
57Hudas011.323
58Bharnawa08.71
59Sandas019.43
60Jharariya014.07
61Malgaonv011.39
62Sikrali029.614
63Genana07.2025
64Ratau020.6025
65Baldu014.8271
66Dudholi012.73
67Thakuriyawas025.259
68Khardia017.554
69Naugangpura07.839
70Ajva0.152412.1756
71Patan014.07
72Singhana010.586
73Kalwani019.363
74Chandbasni012.6295
75Girdharipura017.755
76Thanu011.5575
77Devrathi011.189
78Sukpa012.596
79Sewa012.8975
80Bemath012.194
81Lalasri012.998
82Khariya013.534
83Ganeshppura012.1002
84Bardwa014.137
85Bansawa014.003
86Payali024.589
87Kayamsar017.4535
88Sunjrasan018.8605
89Ahirokabas013.6345
90Hudil016.9845
91Karnaota032.6089
92Mangrasar028.14
93Singrawat015.075
94Ganeshpura-010.854
95Bajniyo ki Dhani08.978
96Maliyon ki Dhani08.576
97Losal010.05
98Rampura09.179
99Bhirana06.834
100Charnwas010.05
101Balwantpura07.504
102Pratapura08.107
103Khandari09.4135
104Shesham014.8405
105Bhagatpura013.266
106Karanpura010.787
107Jhun ka Bas05.896
108Vijaypura06.499
109Lamba ki Dhani07.37
110Tiphoniyo ki Dhani08.0065
111Goriyawas012.596
112Suliyawas05.159
113Khatiwas018.4585
114Rupgarh010.2175
115Kukariyawas06.968
116Tehat09.3465
117Dudwa012.3615
118Basri Kalan010.7535
119Basri Khurd06.164
120Dhirajpura05.4605
121Reta011.859
122Ganora07.705
123Charanwas tuliwala07.37
124Samer04.69
125Govti017.42
126Tulsiramplura09.7619
127Haritwalo Ki Dhani06.7
128Barsingpura06.633
129Ladana015.9192
130Palsana0.249521.7801
131Ghoraran016.951
132Akhepura08.7435
Total 0.6231 2048.9069
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation04.9248
2Stringing Area0.2325759.5927
3Remaining ROW Area0.39061284.3894
Total 0.6231 2048.9069
C. Maps of forest land proposed to be diverted
Division 1. : Jodhpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.2212   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.2212    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Nagaur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.3216   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.3216    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Sikar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.2495   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.2484    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 420864
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1ADMINISTRATIVE SANCTION
2AUTHORIZATION LETTER
3LOI Rajasthan Part C
4GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-1 (JODHPUR AND BIKANER)
5GEO-REFERENCED FULL DIGITAL MAP WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C BHADLA-2 -SIKAR-2 TRANSMISSION LINE ROUTE ALIGNMENT SCALE 1: 50000 PART-1 (JODHPUR )
6Geo-Referenced DGPS Map Segment -1 (Forest Division - Jodhpur)
7EDS Reply -09-08-2021
8BAR CHART
9CERTIFICATE FOR MINIMUM USE OF FOREST LAND
10CERTIFICATE TOWARD MUCK DISPOSAL AND MANAGMENT PLAN
11COMPLETE ALIGNMENT TOWER COORDINATES
12Details of Permanent Employment to be Generated
13Geo-Referenced DGPS Map Segment -2 (Forest Division - Nagaur)
14Geo-Referenced DGPS Map Segment -3(Forest Division -Sikar)
15Geo-Referenced DGPS Map Total Route Alignment Scale 1 : 50000
16Google Imagery Map (Sikar Division)
17Alternative Digital Map
18Area Calculation Sheet for Forest and Non Forest Land
19Alternative Route Alignment Analysis Sheet
20JAMABANDI
21JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
22Khasra KANJI KI Sird -Jodhpur
23Khasra Map Ajawa (Nagaur)
24Khasra Map Palasana ( Sikar)
25KHASRA WISE STATEMENT SHOWING - Sikar Divsion
26KHASRA WISE STATEMENT SHOWING -Jodhpur Division
27KHASRA WISE STATEMENT SHOWING -Nagaur Division
28GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-2 (Nagaur )
29GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-3 (Sikar )
30STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
31UNDERTAKING FOR ALL TYPE FOREST INCLUDED
32UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
33UNDERTAKING FOR MEDICIANAL PLANTS
34UNDERTAKING FOR MUCK DISPOSAL
35UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
36UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
37UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
38UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
39UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
40UNDERTAKING FOR USE OF FOREST LAND
41UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
42UNDERTAKING OF FRA CERTIFICATE
43Segment Wise Area Calculation Sheet
44Eds Reple to Nagaur Division-03-02-2022
45EDS Reply to Sikar DCF-20-09-2022