Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Orissa
|
FP/OR/MIN/155017/2022
|
8-18/2002-FC Vol
|
BHUBANESWARI OCP
|
Mining
|
BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED
|
20.383
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2022
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2025
|
|
|
|
30 May 2025
|
2
|
Orissa
|
FP/OR/Others/23166/2016
|
5-ORC496/2022-BHU
|
: Kalamang (Sagasahi)-Dabuna Slurry& Water Pipelines Project of M/s Essar Steel India Ltd.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
16.466
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2016
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 May 2025
|
|
|
|
27 May 2025
|
3
|
Orissa
|
FP/OR/TRANS/153797/2022
|
5-ORC576/2023-BHU
|
2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
8.435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
06 May 2025
|
4
|
Orissa
|
FP/OR/MIN/20092/2016
|
8-01/2019-FC
|
Tirigpahar Iron & Manganese Mine (Guruda Block)
|
Mining
|
TATA STEEL LIMITED SUKINDA CHROMITE MINE
|
80.826
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2016
|
Stage-I Approval on
|
:
|
02 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2025
|
|
|
|
30 Apr 2025
|
5
|
Orissa
|
FP/OR/IND/12884/2015
|
5-ORC279/2016-BHU
|
NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT
|
Industry
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
25.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
24 Apr 2025
|
6
|
Orissa
|
FP/OR/MIN/39199/2019
|
8-25/2022-FC
|
Raikela, Bahamba and Tensa Iron & Manganese Mines of Sri C.P. Sharma
|
Mining
|
ANIL KUMAR SHARMA POWER OF ATTORNEY OF LATE CP SHARMA
|
67.352
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2019
|
Stage-I Approval on
|
:
|
04 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2025
|
|
|
|
25 Mar 2025
|
7
|
Orissa
|
FP/OR/MIN/39355/2019
|
8-280/1989-FC Vol.
|
Integrated Lakhanpur-Belpahar-Lilari Opencast Project
|
Mining
|
INTEGRATED LAKHANPUR-BELPAHAR-LILARI OCP
|
417.073
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2019
|
Stage-I Approval on
|
:
|
27 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2024
|
|
|
|
19 Feb 2025
|
8
|
Orissa
|
FP/OR/Others/147445/2021
|
5-ORC548/2023-BHU
|
Srikakulam - Angul Pipeline (SAPL)Project_Mainline
|
Others
|
GAIL INDIA LIMITED
|
6.1487
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
17 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
14 Feb 2025
|
9
|
Orissa
|
FP/OR/MIN/150133/2021
|
8-06/2023-FC
|
Subhadra OCP
|
Mining
|
Mahanadi Coalfields Limited
|
125.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
24 Jan 2025
|
10
|
Orissa
|
FP/OR/MIN/11934/2015
|
8-14/2016-FC
|
Kaliapani Chromite Mines, Village:Kaliapani,Tehsil: Sukinda, Dist. Jajpur , Odisha.
|
Mining
|
BALASORE ALLOYS LTD
|
64.119
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2016
|
Stage-I Approval on
|
:
|
18 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2025
|
|
|
|
22 Jan 2025
|
11
|
Orissa
|
FP/OR/ROAD/52400/2020
|
5-ORB479/2021-BHU
|
Diversion of 2.62 Hectre forest land for Construction of 4 lane carriage way with service road of Belpahar bypass from Km 0/0 to Km 2/971 for the year 2019-20 Under MCL fund
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVSION JHARSUGDA
|
2.622
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2020
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
14 Jan 2025
|
12
|
Orissa
|
FP/OR/TRANS/119219/2021
|
5-ORC473/2021-BHU
|
33 K.V power line corridor on N.B.L.S tower from 220/33kV grid sub-station at Khairiput, Govindpalli of OPTCL to 33kV sub-station site near Saptadhara H.E.P of Avantika Power Projects
|
Transmission Line
|
SRI AVANTIKA POWER PROJECTS LIMITED
|
10.803
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
03 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
14 Jan 2025
|
13
|
Orissa
|
FP/OR/ROAD/150863/2022
|
5-ORC543/2022-BHU
|
Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH
|
6.098
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2024
|
|
|
|
14 Jan 2025
|
14
|
Orissa
|
FP/OR/RAIL/45694/2020
|
5-ORA528/2022-BHU
|
Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180
|
Railway
|
EAST COAST RAILWAY
|
594.618
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jun 2020
|
Stage-I Approval on
|
:
|
13 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
13 Jan 2025
|
15
|
Orissa
|
FP/OR/Pipeline/123665/2021
|
5-ORB549/2023-BHU
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
3.347
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2024
|
|
|
|
18 Dec 2024
|
16
|
Orissa
|
FP/OR/ROAD/154639/2022
|
5-ORC627/2024-BHU
|
CONSTRUCTION OF PROPOSED APPROACH ROAD FROM JUMKA PAHAR BLOCK OF RUNGTA MINES LTD TO THE EXISTING KOIRA BELAKUDAR PATAMUNDA ROAD
|
Road
|
RUNGTA MINES LTD
|
13.077
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
Stage-I Approval on
|
:
|
25 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2024
|
|
|
|
30 Nov 2024
|
17
|
Orissa
|
FP/OR/Others/30598/2017
|
5-ORB539/2022-BHU
|
Underground Water Pipeline & 11KV Power line fro Karo River to Steel Plant of M/s SREE METALIKS LIMITED situated at Village Loidapada ,Dist Keonjhar,Odisha
|
Others
|
SREE METALIKS LTD
|
0.764
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Dec 2017
|
Stage-I Approval on
|
:
|
17 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2024
|
|
|
|
20 Nov 2024
|
18
|
Orissa
|
FP/OR/Others/149695/2021
|
5-ORA620/2023-BHU
|
NALCO Conveyor Cooridor System
|
Others
|
NALCO
|
41.297
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2024
|
|
|
|
23 Sep 2024
|
19
|
Orissa
|
FP/OR/MIN/150048/2021
|
8-08/2023-FC
|
Diversion of 156.978 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Jumka Pathiriposhi pahar Iron ore block of M/s Rungta Mines L
|
Mining
|
RUNGTA MINES LTD
|
156.978
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
28 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2024
|
|
|
|
12 Sep 2024
|
20
|
Orissa
|
FP/OR/IRRIG/12758/2015
|
5-ORC292/2016-BHU
|
SANDUL IRRIGATION PROJECT
|
Irrigation
|
KALAHANDI INVESTIGATION DIVISION
|
7.535
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Sep 2015
|
Stage-I Approval on
|
:
|
18 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
10 Sep 2024
|
21
|
Orissa
|
FP/OR/IND/45465/2020
|
5-ORC568/2023-BHU
|
3.00 MMTPA Alumina Refinery with 150 MW co-generation Power Plant at Kansariguda in Rayagada district, Odisha by M/s Hindalco Industries Limited-Aditya Alumina Refinery Project
|
Industry
|
ADITYA ALUMINIUM
|
38.062
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2020
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2024
|
|
|
|
28 Aug 2024
|
22
|
Orissa
|
FP/OR/TRANS/156567/2022
|
5-ORB589/2023-BHU
|
CONSTRUCTION OF 11KV OVERHEAD TRANSMISSION LINE FROM JALDIHI VILLAGE TO JUMKA PATHIRIPOSHI PAHAR IRON ORE BLOCK OF MS RUNGTA MINES LIMITED
|
Transmission Line
|
RUNGTA MINES LTD
|
3.104
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
23 Aug 2024
|
23
|
Orissa
|
FP/OR/RAIL/29907/2017
|
5-ORA374/2019-BHU
|
Khurda Road Bolangir New B.G. Raillink Project Phase-II i.e. from 238-289
|
Railway
|
EAST COAST RAILWAY
|
69.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2017
|
Stage-I Approval on
|
:
|
20 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2024
|
|
|
|
16 Aug 2024
|
24
|
Orissa
|
FP/OR/MIN/40025/2019
|
8-63/2011-FC Vol.
|
Manoharpur Coal Mine Project
|
Mining
|
ODISHA COAL AND POWER LIMITED
|
15.701
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2019
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jun 2024
|
|
|
|
06 Aug 2024
|
25
|
Orissa
|
FP/OR/ROAD/23286/2016
|
5-ORC332/2017-BHU
|
Widening to two lane carriage way from 327/700 to 413/700km of NH-326 (erstwhile form 16/0 to 102/000 of SH-25) under Vijayawada – Ranchi corridor with state Koraput & Malkangiri district in the state of Odisha
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION, JEYPORE
|
10.635
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2016
|
Stage-I Approval on
|
:
|
05 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
30 Jul 2024
|
26
|
Orissa
|
FP/OR/TRANS/33277/2018
|
5-ORC406/2020-BHU
|
Odisha Power Transmission Corporation Limited (OPTCL)
|
Transmission Line
|
OPTCL
|
7.184
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
14 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
25 Jul 2024
|
27
|
Orissa
|
FP/OR/RAIL/20055/2016
|
5-ORC349/2018-BHU
|
NTPC LTD,DARLIPALI SUPER THERMAL POWER PROJECT
|
Railway
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
19.43
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2016
|
Stage-I Approval on
|
:
|
18 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2024
|
|
|
|
26 Jun 2024
|
28
|
Orissa
|
FP/OR/Others/32590/2018
|
5-ORB399/2019-BHU
|
Installation of pipeline over a length 4.748 km for drawal of water from river Mahanadi to Boudh Distillery in Odisha
|
Others
|
BOUDH DISTILLERY PVT LTD
|
0.966
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2018
|
Stage-I Approval on
|
:
|
04 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2024
|
|
|
|
31 May 2024
|
29
|
Orissa
|
FP/OR/IRRIG/22787/2016
|
5-ORC345/2018-BHU
|
For Construction of Additional Spillway of Hirakud Dam Project, Burla
|
Irrigation
|
EXECUTIVE ENGGINEER MAIN DAM DIVISION BURLA
|
9.441
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2016
|
Stage-I Approval on
|
:
|
01 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2024
|
|
|
|
28 May 2024
|
30
|
Orissa
|
FP/OR/Others/31590/2018
|
5-ORC481/2021-BHU
|
Dabuna – Sankari Tailing & Water Pipelines Project of M/s Essar Steel India Limited.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
12.728
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2018
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2024
|
|
|
|
28 May 2024
|
31
|
Orissa
|
FP/OR/TRANS/38533/2019
|
5-ORC416/2020-BHU
|
Construction of 220 KV Lilo Transmission line from LOC No. 331 of Existing 220 KV Rengali Tarkera Line to proposed 220/ 33 KV Grid Sub-station at Deogarh.
|
Transmission Line
|
OPTCL
|
21.159
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2024
|
|
|
|
21 May 2024
|
32
|
Orissa
|
FP/OR/Approach/64022/2020
|
5-ORB460/2021-BHU
|
CONSTRUCTION OF RESIDENTIAL AND SERVICE BUILDINGS AND ALLIED INFRASTRUCTURE FOR SHIFTING OF EXPLORATION CAMP FROM GOPALPUR, DIST-SUNDARGARH TO LAKHANPUR, DIST- JHARSUGUDA
|
Approach Access
|
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
|
0.047
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2024
|
|
|
|
21 May 2024
|
33
|
Orissa
|
FP/OR/Others/154167/2022
|
5-ORB530/2022-BHU
|
Proposal for Diversion of 0.700 hectares of forest area Proposed Water Conductor System from Mandira Dam to Power House Point of M/s. GEDCOL SAIL Power Corporation Limited near Laing village of Rajgan
|
Others
|
GEDCOL SAIL POWER CORPORATION LIMITED
|
0.7
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2022
|
Stage-I Approval on
|
:
|
20 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2024
|
|
|
|
24 Apr 2024
|
34
|
Orissa
|
FP/OR/TRANS/38561/2019
|
5-ORC417/2020-BHU
|
Construction of 132 KV Transmission Line from 400/220/132 KV Grid Sub-Station at- Lapanga to Proposed RTSS at- Rengali.
|
Transmission Line
|
OPTCL
|
6.278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
15 Apr 2024
|
35
|
Orissa
|
FP/OR/ROAD/42674/2019
|
5-ORB414/2020-BHU
|
Approach Road
|
Road
|
INDIAN OIL, JAJPUR
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2019
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2024
|
|
|
|
13 Apr 2024
|
36
|
Orissa
|
FP/OR/ROAD/31054/2017
|
5-ORC463/2021-BHU
|
Widening of existing 2-lane to 2-lane with 1.5m. wide paved shoulder from Km 0/0 to 81/00 & 93/0 to 119/0 of N.H-157 on EPC mode.
|
Road
|
EXECUTIVE ENGINEER NH DIVISION SAMBALPUR
|
27.343
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2017
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2024
|
|
|
|
14 Mar 2024
|
37
|
Orissa
|
FP/OR/SCH/26930/2017
|
5-ORB425/2020
|
Kalinga Institute of Social Sciences, a sister concern of KIIT
|
School
|
KALINGA INSTITUTE SOCIAL SCIENCES
|
4.032
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2017
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2024
|
|
|
|
21 Feb 2024
|
38
|
Orissa
|
FP/OR/ROAD/154500/2022
|
5-ORB540/2022-BHU
|
Proposed Approach Road
|
Road
|
TATA STEEL LIMITED KHONDBOND IRON AND MN MINES
|
0.051
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2022
|
Stage-I Approval on
|
:
|
31 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2024
|
|
|
|
20 Feb 2024
|
39
|
Orissa
|
FP/OR/MIN/18827/2016
|
8-17/2001-FC Vol
|
Nuagaon Iron Ore Block of M/s JSW Steel Ltd, Guali
|
Mining
|
JSW STEEL LTD
|
63.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2016
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
12 Feb 2024
|
40
|
Orissa
|
FP/OR/IND/16543/2015
|
5-ORB477/2021-BHU
|
Expansion of Line-II at Jharsuguda Cement Works (JCW)
|
Industry
|
ULTRATECH CEMENT LIMITED
|
0.799
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2015
|
Stage-I Approval on
|
:
|
03 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
25 Jan 2024
|
41
|
Orissa
|
FP/OR/MIN/149706/2021
|
5-ORB552/2023-BHU
|
Diversion of 0.03 Ha forest land involved in Safety Zone Area of Roida II Iron Ore Block for passing through of approach road into the mine
|
Mining
|
NARBHERAM POWER AND STEEL PRIVATE LIMITED
|
0.03
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2021
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2023
|
|
|
|
23 Jan 2024
|
42
|
Orissa
|
FP/OR/TRANS/37011/2018
|
5-ORC448/2021-BHU
|
220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA.
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
39.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2018
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2023
|
|
|
|
02 Jan 2024
|
43
|
Orissa
|
FP/OR/TRANS/37011/2018
|
5-ORC448/2021-BHU
|
220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA.
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
39.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2018
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2023
|
|
|
|
02 Jan 2024
|
44
|
Orissa
|
FP/OR/IND/40650/2019
|
5-ORC469/2021-BHU
|
Establishment of Industries i.e. Expansion of Existing Red Mud Pond.
|
Industry
|
IDCO
|
15.265
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2019
|
Stage-I Approval on
|
:
|
17 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2023
|
|
|
|
29 Dec 2023
|
45
|
Orissa
|
FP/OR/TRANS/38138/2019
|
5-ORC421/2020-BHU
|
33 KV Power Transmission overhead line from NTPC, Darlipali to OCPL Sub-Station
|
Transmission Line
|
ODISHA COAL AND POWER LIMITED
|
5.777
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2019
|
Stage-I Approval on
|
:
|
31 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2023
|
|
|
|
18 Dec 2023
|
46
|
Orissa
|
FP/OR/MIN/150051/2021
|
5-ORC545/2023-BHU
|
Diversion of 34.162 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Pureibahal Iron ore block of M/s Rungta Mines Limited.
|
Mining
|
RUNGTA MINES LTD
|
34.162
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
11 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2023
|
|
|
|
18 Dec 2023
|
47
|
Orissa
|
FP/OR/MIN/150057/2021
|
8-01/2023-FC
|
Diversion of 83.602 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Chandiposhi Iron ore block of M/s Rungta Mines Limited.
|
Mining
|
RUNGTA MINES LTD
|
83.602
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
18 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2023
|
|
|
|
14 Dec 2023
|
48
|
Orissa
|
FP/OR/IRRIG/25941/2017
|
8-59/2018-FC
|
UPPER LANTH MEDIUM IRRIGATION PROJECT
|
Irrigation
|
UPPER LANTH MEDIUM IRRIGATION PROJECT
|
341.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 May 2017
|
Stage-I Approval on
|
:
|
21 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2023
|
|
|
|
27 Nov 2023
|
49
|
Orissa
|
FP/OR/RAIL/37351/2018
|
5-ORC405/2020-BHU
|
SAMBALPUR-TITLAGARH DOUBLING RAILWAY PROJECT
|
Railway
|
EAST COAST RAILWAY
|
10.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2018
|
Stage-I Approval on
|
:
|
17 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2023
|
|
|
|
13 Oct 2023
|
50
|
Orissa
|
FP/OR/ROAD/138455/2021
|
5-ORB535/2022-BHU
|
For construction of road & 33 KV Transmission Line connecting Roida-II Iron Ore Block of M/s. Narbheram Power And Steel Private Limited to NH- 215 Keonjhar District
|
Road
|
NARBHERAM POWER AND STEEL PRIVATE LIMITED
|
0.978
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2021
|
Stage-I Approval on
|
:
|
03 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2023
|
|
|
|
12 Oct 2023
|
|