List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Orissa FP/OR/MIN/155017/2022 8-18/2002-FC Vol BHUBANESWARI OCP Mining BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED 20.383 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2022
Stage-I Approval on : 24 Sep 2024
Compliance Report Submitted by User Agency on : 19 May 2025
30 May 2025
2 Orissa FP/OR/Others/23166/2016 5-ORC496/2022-BHU : Kalamang (Sagasahi)-Dabuna Slurry& Water Pipelines Project of M/s Essar Steel India Ltd. Others ArcelorMittal Nippon Steel India Limited 16.466 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Dec 2016
Stage-I Approval on : 25 Jan 2022
Compliance Report Submitted by User Agency on : 16 May 2025
27 May 2025
3 Orissa FP/OR/TRANS/153797/2022 5-ORC576/2023-BHU 2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar Transmission Line ODISHA POWER TRANSMISSION CORPORATION LIMITED 8.435 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2022
Stage-I Approval on : 14 Mar 2024
Compliance Report Submitted by User Agency on : 29 Apr 2025
06 May 2025
4 Orissa FP/OR/MIN/20092/2016 8-01/2019-FC Tirigpahar Iron & Manganese Mine (Guruda Block) Mining TATA STEEL LIMITED SUKINDA CHROMITE MINE 80.826 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Jun 2016
Stage-I Approval on : 02 Aug 2019
Compliance Report Submitted by User Agency on : 04 Mar 2025
30 Apr 2025
5 Orissa FP/OR/IND/12884/2015 5-ORC279/2016-BHU NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT Industry NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT 25.76 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2015
Stage-I Approval on : 01 Nov 2016
Compliance Report Submitted by User Agency on : 11 Apr 2025
24 Apr 2025
6 Orissa FP/OR/MIN/39199/2019 8-25/2022-FC Raikela, Bahamba and Tensa Iron & Manganese Mines of Sri C.P. Sharma Mining ANIL KUMAR SHARMA POWER OF ATTORNEY OF LATE CP SHARMA 67.352 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Apr 2019
Stage-I Approval on : 04 Dec 2023
Compliance Report Submitted by User Agency on : 15 Feb 2025
25 Mar 2025
7 Orissa FP/OR/MIN/39355/2019 8-280/1989-FC Vol. Integrated Lakhanpur-Belpahar-Lilari Opencast Project Mining INTEGRATED LAKHANPUR-BELPAHAR-LILARI OCP 417.073 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Mar 2019
Stage-I Approval on : 27 Dec 2023
Compliance Report Submitted by User Agency on : 27 Nov 2024
19 Feb 2025
8 Orissa FP/OR/Others/147445/2021 5-ORC548/2023-BHU Srikakulam - Angul Pipeline (SAPL)Project_Mainline Others GAIL INDIA LIMITED 6.1487 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Sep 2021
Stage-I Approval on : 17 Feb 2023
Compliance Report Submitted by User Agency on : 03 Feb 2025
14 Feb 2025
9 Orissa FP/OR/MIN/150133/2021 8-06/2023-FC Subhadra OCP Mining Mahanadi Coalfields Limited 125.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2022
Stage-I Approval on : 05 Dec 2023
Compliance Report Submitted by User Agency on : 30 Dec 2024
24 Jan 2025
10 Orissa FP/OR/MIN/11934/2015 8-14/2016-FC Kaliapani Chromite Mines, Village:Kaliapani,Tehsil: Sukinda, Dist. Jajpur , Odisha. Mining BALASORE ALLOYS LTD 64.119 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Jan 2016
Stage-I Approval on : 18 Nov 2016
Compliance Report Submitted by User Agency on : 18 Jan 2025
22 Jan 2025
11 Orissa FP/OR/ROAD/52400/2020 5-ORB479/2021-BHU Diversion of 2.62 Hectre forest land for Construction of 4 lane carriage way with service road of Belpahar bypass from Km 0/0 to Km 2/971 for the year 2019-20 Under MCL fund Road EXECUTIVE ENGINEER ROAD AND BUILDING DIVSION JHARSUGDA 2.622 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Nov 2020
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 30 Dec 2024
14 Jan 2025
12 Orissa FP/OR/TRANS/119219/2021 5-ORC473/2021-BHU 33 K.V power line corridor on N.B.L.S tower from 220/33kV grid sub-station at Khairiput, Govindpalli of OPTCL to 33kV sub-station site near Saptadhara H.E.P of Avantika Power Projects Transmission Line SRI AVANTIKA POWER PROJECTS LIMITED 10.803 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Jan 2021
Stage-I Approval on : 03 Nov 2021
Compliance Report Submitted by User Agency on : 28 Nov 2024
14 Jan 2025
13 Orissa FP/OR/ROAD/150863/2022 5-ORC543/2022-BHU Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19 Road EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH 6.098 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jan 2022
Stage-I Approval on : 18 Jan 2023
Compliance Report Submitted by User Agency on : 16 Dec 2024
14 Jan 2025
14 Orissa FP/OR/RAIL/45694/2020 5-ORA528/2022-BHU Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180 Railway EAST COAST RAILWAY 594.618 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jun 2020
Stage-I Approval on : 13 Feb 2023
Compliance Report Submitted by User Agency on : 18 Dec 2024
13 Jan 2025
15 Orissa FP/OR/Pipeline/123665/2021 5-ORB549/2023-BHU Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project Pipeline NUMALIGARH REFINERY LIMITED 3.347 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Feb 2021
Stage-I Approval on : 28 Mar 2023
Compliance Report Submitted by User Agency on : 07 Dec 2024
18 Dec 2024
16 Orissa FP/OR/ROAD/154639/2022 5-ORC627/2024-BHU CONSTRUCTION OF PROPOSED APPROACH ROAD FROM JUMKA PAHAR BLOCK OF RUNGTA MINES LTD TO THE EXISTING KOIRA BELAKUDAR PATAMUNDA ROAD Road RUNGTA MINES LTD 13.077 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Apr 2022
Stage-I Approval on : 25 Jan 2024
Compliance Report Submitted by User Agency on : 12 Nov 2024
30 Nov 2024
17 Orissa FP/OR/Others/30598/2017 5-ORB539/2022-BHU Underground Water Pipeline & 11KV Power line fro Karo River to Steel Plant of M/s SREE METALIKS LIMITED situated at Village Loidapada ,Dist Keonjhar,Odisha Others SREE METALIKS LTD 0.764 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Dec 2017
Stage-I Approval on : 17 Apr 2023
Compliance Report Submitted by User Agency on : 25 Oct 2024
20 Nov 2024
18 Orissa FP/OR/Others/149695/2021 5-ORA620/2023-BHU NALCO Conveyor Cooridor System Others NALCO 41.297 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Nov 2021
Stage-I Approval on : 22 Dec 2023
Compliance Report Submitted by User Agency on : 09 Jul 2024
23 Sep 2024
19 Orissa FP/OR/MIN/150048/2021 8-08/2023-FC Diversion of 156.978 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Jumka Pathiriposhi pahar Iron ore block of M/s Rungta Mines L Mining RUNGTA MINES LTD 156.978 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Dec 2021
Stage-I Approval on : 28 Nov 2023
Compliance Report Submitted by User Agency on : 20 Jun 2024
12 Sep 2024
20 Orissa FP/OR/IRRIG/12758/2015 5-ORC292/2016-BHU SANDUL IRRIGATION PROJECT Irrigation KALAHANDI INVESTIGATION DIVISION 7.535 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Sep 2015
Stage-I Approval on : 18 Nov 2016
Compliance Report Submitted by User Agency on : 20 Jul 2024
10 Sep 2024
21 Orissa FP/OR/IND/45465/2020 5-ORC568/2023-BHU 3.00 MMTPA Alumina Refinery with 150 MW co-generation Power Plant at Kansariguda in Rayagada district, Odisha by M/s Hindalco Industries Limited-Aditya Alumina Refinery Project Industry ADITYA ALUMINIUM 38.062 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 May 2020
Stage-I Approval on : 29 Dec 2023
Compliance Report Submitted by User Agency on : 16 Jul 2024
28 Aug 2024
22 Orissa FP/OR/TRANS/156567/2022 5-ORB589/2023-BHU CONSTRUCTION OF 11KV OVERHEAD TRANSMISSION LINE FROM JALDIHI VILLAGE TO JUMKA PATHIRIPOSHI PAHAR IRON ORE BLOCK OF MS RUNGTA MINES LIMITED Transmission Line RUNGTA MINES LTD 3.104 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2022
Stage-I Approval on : 22 Dec 2023
Compliance Report Submitted by User Agency on : 03 Aug 2024
23 Aug 2024
23 Orissa FP/OR/RAIL/29907/2017 5-ORA374/2019-BHU Khurda Road Bolangir New B.G. Raillink Project Phase-II i.e. from 238-289 Railway EAST COAST RAILWAY 69.77 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2017
Stage-I Approval on : 20 Aug 2019
Compliance Report Submitted by User Agency on : 30 Jul 2024
16 Aug 2024
24 Orissa FP/OR/MIN/40025/2019 8-63/2011-FC Vol. Manoharpur Coal Mine Project Mining ODISHA COAL AND POWER LIMITED 15.701 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 May 2019
Stage-I Approval on : 20 Oct 2021
Compliance Report Submitted by User Agency on : 11 Jun 2024
06 Aug 2024
25 Orissa FP/OR/ROAD/23286/2016 5-ORC332/2017-BHU Widening to two lane carriage way from 327/700 to 413/700km of NH-326 (erstwhile form 16/0 to 102/000 of SH-25) under Vijayawada – Ranchi corridor with state Koraput & Malkangiri district in the state of Odisha Road EXECUTIVE ENGINEER, NH DIVISION, JEYPORE 10.635 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2016
Stage-I Approval on : 05 Mar 2018
Compliance Report Submitted by User Agency on : 27 Jun 2024
30 Jul 2024
26 Orissa FP/OR/TRANS/33277/2018 5-ORC406/2020-BHU Odisha Power Transmission Corporation Limited (OPTCL) Transmission Line OPTCL 7.184 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Apr 2018
Stage-I Approval on : 14 Sep 2020
Compliance Report Submitted by User Agency on : 24 Jun 2024
25 Jul 2024
27 Orissa FP/OR/RAIL/20055/2016 5-ORC349/2018-BHU NTPC LTD,DARLIPALI SUPER THERMAL POWER PROJECT Railway NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT 19.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jun 2016
Stage-I Approval on : 18 Jun 2018
Compliance Report Submitted by User Agency on : 24 May 2024
26 Jun 2024
28 Orissa FP/OR/Others/32590/2018 5-ORB399/2019-BHU Installation of pipeline over a length 4.748 km for drawal of water from river Mahanadi to Boudh Distillery in Odisha Others BOUDH DISTILLERY PVT LTD 0.966 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Mar 2018
Stage-I Approval on : 04 Dec 2019
Compliance Report Submitted by User Agency on : 25 Apr 2024
31 May 2024
29 Orissa FP/OR/IRRIG/22787/2016 5-ORC345/2018-BHU For Construction of Additional Spillway of Hirakud Dam Project, Burla Irrigation EXECUTIVE ENGGINEER MAIN DAM DIVISION BURLA 9.441 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Dec 2016
Stage-I Approval on : 01 May 2018
Compliance Report Submitted by User Agency on : 14 May 2024
28 May 2024
30 Orissa FP/OR/Others/31590/2018 5-ORC481/2021-BHU Dabuna – Sankari Tailing & Water Pipelines Project of M/s Essar Steel India Limited. Others ArcelorMittal Nippon Steel India Limited 12.728 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Feb 2018
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 09 May 2024
28 May 2024
31 Orissa FP/OR/TRANS/38533/2019 5-ORC416/2020-BHU Construction of 220 KV Lilo Transmission line from LOC No. 331 of Existing 220 KV Rengali Tarkera Line to proposed 220/ 33 KV Grid Sub-station at Deogarh. Transmission Line OPTCL 21.159 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2019
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 23 Apr 2024
21 May 2024
32 Orissa FP/OR/Approach/64022/2020 5-ORB460/2021-BHU CONSTRUCTION OF RESIDENTIAL AND SERVICE BUILDINGS AND ALLIED INFRASTRUCTURE FOR SHIFTING OF EXPLORATION CAMP FROM GOPALPUR, DIST-SUNDARGARH TO LAKHANPUR, DIST- JHARSUGUDA Approach Access CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED 0.047 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 04 May 2021
Compliance Report Submitted by User Agency on : 12 Mar 2024
21 May 2024
33 Orissa FP/OR/Others/154167/2022 5-ORB530/2022-BHU Proposal for Diversion of 0.700 hectares of forest area Proposed Water Conductor System from Mandira Dam to Power House Point of M/s. GEDCOL SAIL Power Corporation Limited near Laing village of Rajgan Others GEDCOL SAIL POWER CORPORATION LIMITED 0.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Apr 2022
Stage-I Approval on : 20 Apr 2023
Compliance Report Submitted by User Agency on : 25 Mar 2024
24 Apr 2024
34 Orissa FP/OR/TRANS/38561/2019 5-ORC417/2020-BHU Construction of 132 KV Transmission Line from 400/220/132 KV Grid Sub-Station at- Lapanga to Proposed RTSS at- Rengali. Transmission Line OPTCL 6.278 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2019
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 24 Jan 2024
15 Apr 2024
35 Orissa FP/OR/ROAD/42674/2019 5-ORB414/2020-BHU Approach Road Road INDIAN OIL, JAJPUR 0.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Oct 2019
Stage-I Approval on : 18 May 2020
Compliance Report Submitted by User Agency on : 28 Mar 2024
13 Apr 2024
36 Orissa FP/OR/ROAD/31054/2017 5-ORC463/2021-BHU Widening of existing 2-lane to 2-lane with 1.5m. wide paved shoulder from Km 0/0 to 81/00 & 93/0 to 119/0 of N.H-157 on EPC mode. Road EXECUTIVE ENGINEER NH DIVISION SAMBALPUR 27.343 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2017
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 19 Feb 2024
14 Mar 2024
37 Orissa FP/OR/SCH/26930/2017 5-ORB425/2020 Kalinga Institute of Social Sciences, a sister concern of KIIT School KALINGA INSTITUTE SOCIAL SCIENCES 4.032 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jul 2017
Stage-I Approval on : 17 Sep 2021
Compliance Report Submitted by User Agency on : 15 Feb 2024
21 Feb 2024
38 Orissa FP/OR/ROAD/154500/2022 5-ORB540/2022-BHU Proposed Approach Road Road TATA STEEL LIMITED KHONDBOND IRON AND MN MINES 0.051 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Apr 2022
Stage-I Approval on : 31 Jan 2023
Compliance Report Submitted by User Agency on : 05 Feb 2024
20 Feb 2024
39 Orissa FP/OR/MIN/18827/2016 8-17/2001-FC Vol Nuagaon Iron Ore Block of M/s JSW Steel Ltd, Guali Mining JSW STEEL LTD 63.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2016
Stage-I Approval on : 14 Mar 2022
Compliance Report Submitted by User Agency on : 21 Dec 2023
12 Feb 2024
40 Orissa FP/OR/IND/16543/2015 5-ORB477/2021-BHU Expansion of Line-II at Jharsuguda Cement Works (JCW) Industry ULTRATECH CEMENT LIMITED 0.799 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Nov 2015
Stage-I Approval on : 03 Dec 2021
Compliance Report Submitted by User Agency on : 27 Dec 2023
25 Jan 2024
41 Orissa FP/OR/MIN/149706/2021 5-ORB552/2023-BHU Diversion of 0.03 Ha forest land involved in Safety Zone Area of Roida II Iron Ore Block for passing through of approach road into the mine Mining NARBHERAM POWER AND STEEL PRIVATE LIMITED 0.03 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Dec 2021
Stage-I Approval on : 28 Mar 2023
Compliance Report Submitted by User Agency on : 06 Oct 2023
23 Jan 2024
42 Orissa FP/OR/TRANS/37011/2018 5-ORC448/2021-BHU 220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA. Transmission Line ODISHA POWER TRANSMISSION CORPORATION LIMITED 39.196 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Nov 2018
Stage-I Approval on : 16 Mar 2021
Compliance Report Submitted by User Agency on : 28 Nov 2023
02 Jan 2024
43 Orissa FP/OR/TRANS/37011/2018 5-ORC448/2021-BHU 220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA. Transmission Line ODISHA POWER TRANSMISSION CORPORATION LIMITED 39.196 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Nov 2018
Stage-I Approval on : 16 Mar 2021
Compliance Report Submitted by User Agency on : 28 Nov 2023
02 Jan 2024
44 Orissa FP/OR/IND/40650/2019 5-ORC469/2021-BHU Establishment of Industries i.e. Expansion of Existing Red Mud Pond. Industry IDCO 15.265 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jun 2019
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 06 Nov 2023
29 Dec 2023
45 Orissa FP/OR/TRANS/38138/2019 5-ORC421/2020-BHU 33 KV Power Transmission overhead line from NTPC, Darlipali to OCPL Sub-Station Transmission Line ODISHA COAL AND POWER LIMITED 5.777 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2019
Stage-I Approval on : 31 Jul 2020
Compliance Report Submitted by User Agency on : 14 Nov 2023
18 Dec 2023
46 Orissa FP/OR/MIN/150051/2021 5-ORC545/2023-BHU Diversion of 34.162 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Pureibahal Iron ore block of M/s Rungta Mines Limited. Mining RUNGTA MINES LTD 34.162 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Dec 2021
Stage-I Approval on : 11 May 2023
Compliance Report Submitted by User Agency on : 08 Dec 2023
18 Dec 2023
47 Orissa FP/OR/MIN/150057/2021 8-01/2023-FC Diversion of 83.602 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Chandiposhi Iron ore block of M/s Rungta Mines Limited. Mining RUNGTA MINES LTD 83.602 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Dec 2021
Stage-I Approval on : 18 May 2023
Compliance Report Submitted by User Agency on : 08 Dec 2023
14 Dec 2023
48 Orissa FP/OR/IRRIG/25941/2017 8-59/2018-FC UPPER LANTH MEDIUM IRRIGATION PROJECT Irrigation UPPER LANTH MEDIUM IRRIGATION PROJECT 341.23 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 May 2017
Stage-I Approval on : 21 Dec 2018
Compliance Report Submitted by User Agency on : 13 Nov 2023
27 Nov 2023
49 Orissa FP/OR/RAIL/37351/2018 5-ORC405/2020-BHU SAMBALPUR-TITLAGARH DOUBLING RAILWAY PROJECT Railway EAST COAST RAILWAY 10.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Dec 2018
Stage-I Approval on : 17 Apr 2020
Compliance Report Submitted by User Agency on : 27 Sep 2023
13 Oct 2023
50 Orissa FP/OR/ROAD/138455/2021 5-ORB535/2022-BHU For construction of road & 33 KV Transmission Line connecting Roida-II Iron Ore Block of M/s. Narbheram Power And Steel Private Limited to NH- 215 Keonjhar District Road NARBHERAM POWER AND STEEL PRIVATE LIMITED 0.978 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Mar 2021
Stage-I Approval on : 03 Feb 2023
Compliance Report Submitted by User Agency on : 22 Aug 2023
12 Oct 2023