Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/OFC/36007/2018
|
4-APB221/2023-VIJ
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
1.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2018
|
Stage-I Approval on
|
:
|
17 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2023
|
|
|
|
16 Jan 2025
|
2
|
Andhra Pradesh
|
FP/AP/ROAD/28853/2017
|
4-APC132/2021-VIJ
|
Upgradation of existing NH 30 from Km.169.770 to 236.150 of Vijayawada to Jagadalpur section to two lane with paved shoulders in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
25.31
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2017
|
Stage-I Approval on
|
:
|
28 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2024
|
|
|
|
30 Dec 2024
|
3
|
Andhra Pradesh
|
FP/AP/Pipeline/141032/2021
|
4-APB174/2022-VIJ
|
Proposal for Diversion of 0.40 ha. land for Proposed laying of additional pipe line from stage-1 to stage-2 along the road from Srinivasamangapuram to Srivarimettu through compartment nos 114 and 56 oof Perumalapally beat of Tirupathi Extension RF of SVNP Tirupathi range and Nagapatla beat of Nagapatla R.F of SVNP Chamala range, WLM Tirupathi.
|
Pipeline
|
TIRUMALA TIRUPATHI DEVASTHANAM
|
0.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2021
|
Stage-I Approval on
|
:
|
29 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Oct 2024
|
|
|
|
21 Nov 2024
|
4
|
Andhra Pradesh
|
FP/AP/QRY/49372/2020
|
4-APC137/2021-VIJ
|
Grant of Quarry lease for Mica,Quartz and Feldspar of forest land in compt. no. 107&108 of Nellore Range, Nellore Division in f/o. M/s The Krishna Mining Company.
|
Quarrying
|
THE KRISHNA MINING COMPANY
|
10.02
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2020
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2024
|
|
|
|
30 Oct 2024
|
5
|
Andhra Pradesh
|
FP/AP/QRY/38806/2019
|
4-APB103/2020-CHN
|
Quarry lease in Compt No.450 of Yerragonda R.F,Tummagunta village,Kanigiri Mandal,Prakasam District in f/o Sri Ahobila Narasimha Minerals
|
Quarrying
|
SRI AHOBILAM NARASIMHA MINERALS
|
4.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Feb 2019
|
Stage-I Approval on
|
:
|
01 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2024
|
|
|
|
15 Oct 2024
|
6
|
Andhra Pradesh
|
FP/AP/ROAD/155825/2022
|
4-APA207/2023-VIJ
|
CONSTRUCTION OF FOUR LANING PILERU – KALUR FROM KM 55+900 TO KM 95+717 SECTION OF NH-71 OF TIRUPATI DISTRICT IN THE STATE OF ANDHRA PRADESH UNDER BHARATMALA PARIYOJNA (PACKAGE-II).
|
Road
|
PROJECT DIRECTOR NHAI PIU TIRUPATI
|
45.19
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
25 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2024
|
|
|
|
15 Oct 2024
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/146577/2021
|
4-APA208/2023-VIJ
|
Rehabilitation and up-gradation of National Highway-565 from Km 133.922 to Km 154.900 (Davupally to Mallapalem Junction) to two lanes with paved shoulders in the state of Andhra Pradesh u
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS-RO-VIJAYAWADA
|
38.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
11 Oct 2024
|
8
|
Andhra Pradesh
|
FP/AP/Others/147251/2021
|
4-APB196/2022-VIJ
|
Diversion of 2.99 ha of forest land in compartment no.978, Gilmanfield Reserve Forest, Visakhapatnam Division for installation of desalination plant in favour of General Manager, Divi's Laboratories L
|
Others
|
DIVIS LABORATORIES LTD, UNIT-2
|
2.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Sep 2021
|
Stage-I Approval on
|
:
|
06 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2023
|
|
|
|
07 Oct 2024
|
9
|
Andhra Pradesh
|
FP/AP/TRANS/150705/2021
|
F.No.4-APB171/2022-VIJ
|
Erection of 220 KV DC line from 400/220 KV SS Jammalamadugu to the proposed 220/132/33 KV SS at Bethamcherla in Kurnool District
|
Transmission Line
|
APTRANSCO KURNOOL
|
2.63
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
03 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2024
|
|
|
|
01 Oct 2024
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/33876/2018
|
4-APC191/2022-VIJ
|
Diversion of 5.94 Ha in Nellore Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
5.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
02 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2024
|
|
|
|
20 Aug 2024
|
11
|
Andhra Pradesh
|
FP/AP/RAIL/147706/2021
|
4-APC145/2022-VIJ
|
Diversion in an area of 32.25 Ha of forest land in Nandyal and Giddalur division for execution of various engineering works for laying of doubling railway line between Guntur and Guntakal stations".
|
Railway
|
INDIAN RAILWAY SOUTH CENTRAL RAILWAY
|
32.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2021
|
Stage-I Approval on
|
:
|
10 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
20 Aug 2024
|
12
|
Andhra Pradesh
|
FP/AP/Others/148951/2021
|
4-APB187/2022-VIJ
|
Diversion of 0.99 Ha. of forest land in Compt. No. 4 of Nizampatnam RF, Repalle Range, Guntur Division & District of Andhra Pradesh for extension of Quay / Jetty of existing Nizampatnam Fishery Harbour during Phase II Development.
|
Others
|
AP MARITIME INFRASTRUCTURE DEVELOPMENT CORPORATION
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Nov 2021
|
Stage-I Approval on
|
:
|
22 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2024
|
|
|
|
20 Aug 2024
|
13
|
Andhra Pradesh
|
FP/AP/ROAD/26141/2017
|
4-APB038/2017-CHN
|
Formation of Road to AIIMS, Mangalagiri from NH-16 from Km 0.000 to 1.600 in Guntur District.
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
0.941
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2017
|
Stage-I Approval on
|
:
|
20 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
10 Apr 2024
|
|
|
|
11 Jun 2024
|
14
|
Andhra Pradesh
|
FP/AP/OFC/36777/2018
|
4-APB098/2020-CHN
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
2.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2018
|
Stage-I Approval on
|
:
|
19 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
05 Jun 2024
|
15
|
Andhra Pradesh
|
FP/AP/ROAD/153799/2022
|
4-APB199/2022-VIJ
|
Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Paderu to Araku section from Km 2.400 to Km 51.772 of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode with
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
2.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2022
|
Stage-I Approval on
|
:
|
19 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2023
|
|
|
|
05 Jun 2024
|
16
|
Andhra Pradesh
|
FP/AP/ROAD/145376/2021
|
4-APB151/2022-VIJ
|
Proposal for Diversion of 0.46 ha. land for alignment of approach road till main entrance gate of AIIMS (Eastern road-Bell mouth) in Compartment No.132, Mangalagiri Block of Tadepalli Reserve Forest in Guntur Division in favour of Executive Engineer (R&B) Division, Guntur., under FC Act 1980.
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
0.46
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2021
|
Stage-I Approval on
|
:
|
17 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2024
|
|
|
|
01 Jun 2024
|
17
|
Andhra Pradesh
|
FP/AP/ROAD/49639/2020
|
4-APA209/2023-VIJ
|
Rehabilitation and Upgradation to two lane with paved shoulder configuration of Koyyuru to Paderu section from Km 120/000 to Km 260/100(Design chainage Km Km 120+000 To Km 253+974) of NH-516Ein the state of Andhra Pradesh
|
Road
|
REGIONAL OFFICER,MINISTRY OF ROAD TRANSPORT AND HIGHWAYS, VIJAYAWADA
|
65.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2020
|
Stage-I Approval on
|
:
|
06 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2023
|
|
|
|
12 Feb 2024
|
18
|
Andhra Pradesh
|
FP/AP/ROAD/150396/2021
|
4-APB192/2022-VIJ
|
Widening to two lane with paved shoulders of Rayachoty - Vempalli section of newly declared NH-440 from km 0/0 to 53/600 in the state of Andhra Pradesh under EPC mode
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
Stage-I Approval on
|
:
|
27 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Aug 2023
|
|
|
|
16 Jan 2024
|
19
|
Andhra Pradesh
|
FP/AP/QRY/121204/2021
|
4-APB141/2021-VIJ
|
Grant of Quarry lease for Black Granite in favour of M/s. Sri Vasista Mining, A.P (Managing Partner: B.S Nithin Kumar Reddy)
|
Quarrying
|
M/S. SRI VASISTA MINING
|
4.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
16 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
18 Nov 2023
|
20
|
Andhra Pradesh
|
FP/AP/ROAD/154254/2022
|
4-APA184/2022-VIJ
|
Proposed Diversion of Forest Land from Palamner Reserved Forest within Rayala Elephant Reserve for Construction of Bangalore-Chennai Expressway Phase-II in Chittoor District in the state of Andhra Pra
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-CHITTOOR
|
61.73
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2022
|
Stage-I Approval on
|
:
|
23 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2023
|
|
|
|
18 Sep 2023
|
21
|
Andhra Pradesh
|
FP/AP/Pipeline/41405/2019
|
4-APB138/2021-VIJ
|
KSR Prince Hatcheries
|
Pipeline
|
KSR PRINCE HATCHERIES
|
0.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2019
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2023
|
|
|
|
16 Jun 2023
|
22
|
Andhra Pradesh
|
FP/AP/OFC/49705/2020
|
4-APB139/2021-VIJ
|
Proposed Diversion of Forest Land for Laying of Optical Fiber Cable(OFC) in Chittoor East Division in favour of Vindhya Telelinks Limited.
|
Optical Fibre Cable
|
M/S VINDHYA TELELINKS LTD
|
0.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2020
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2022
|
|
|
|
10 May 2023
|
23
|
Andhra Pradesh
|
FP/AP/TRANS/65723/2020
|
4-APC135/2021-VIJ
|
400/220 KV Overhead Transmission Line works from 400/220kV Kalpakka Substation to the proposed Cable Pot Head Station for HPCL Refinery at Vizag
|
Transmission Line
|
HPCL, VISAKH REFINERY
|
11.38
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2020
|
Stage-I Approval on
|
:
|
11 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2023
|
|
|
|
10 May 2023
|
24
|
Andhra Pradesh
|
FP/AP/ROAD/41508/2019
|
4-APB182/2022-VIJ
|
Construction of six-lane highway from Chittoor to Thatchur (NH-716B) from Km 0.000 (Bangalore Chennai Expressway) to Km.126.550 (Chennai Peripheral Road) in Chittoor District in Andhra Pradesh and Tir
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU CHENNAI
|
4.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2019
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2023
|
|
|
|
02 May 2023
|
25
|
Andhra Pradesh
|
FP/AP/Others/153264/2022
|
4-APC181/2022-VIJ
|
INTEGRATED CORRIDOR (FOR LAYING OF TRANSMISSSION LINE, PIPE NETWORK AND ROAD)
|
Others
|
HIMACHAL INFRACON PRIVATE LIMITED
|
12.58
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
Stage-I Approval on
|
:
|
27 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Oct 2022
|
|
|
|
07 Feb 2023
|
26
|
Andhra Pradesh
|
FP/AP/ROAD/151048/2022
|
4-APA144/2022-VIJ
|
Development of Economic Corridors, Inter Corridors and feeder routes and coastal road primarily to improve the efficiency of freight movement in India Raipur-Visakhapatnam NH -130 CD in the state of Andhra Pradesh under Bharatmala Pariyojana.
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA,PIU-VIZIANAGARAM
|
44.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2022
|
|
|
|
31 Oct 2022
|
27
|
Andhra Pradesh
|
FP/AP/TRANS/24593/2017
|
4-APC044/2017-CHN
|
220KV PORUMAMILLA LINE
|
Transmission Line
|
EE CONSTRUCTION KDP
|
6.34
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2017
|
Stage-I Approval on
|
:
|
19 Jun 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2020
|
|
|
|
20 Sep 2022
|
28
|
Andhra Pradesh
|
FP/AP/ROAD/147274/2021
|
4-APB143/2022-VIJ
|
Diversion of 3.48 ha of forest land for Construction of six lane grade separated structure along with slip roads at KM 210+780 (ITC junction in Kurnool Town), KM 260+400 (kambalapadu junction, Dhone)
|
Road
|
National Highways Authority of India
|
3.48
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2021
|
Stage-I Approval on
|
:
|
07 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2022
|
|
|
|
24 Aug 2022
|
29
|
Andhra Pradesh
|
FP/AP/TRANS/27462/2017
|
4-APC084/2018-CHN
|
Warangal (New) - Chilakaluripeta 756kV D/C Line
|
Transmission Line
|
WARORA KURNOOL TRANSMISSION LIMITED
|
18.86
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2017
|
Stage-I Approval on
|
:
|
28 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2021
|
|
|
|
22 Aug 2022
|
30
|
Andhra Pradesh
|
FP/AP/Others/30841/2017
|
4-APC066/2018-CHN
|
Vijayawada-Dharmapuri Petroleum product Pipeline Project
|
Others
|
HINDUSTAN PETROLEUM CORPORATION LIMITED BANGALORE
|
16.57
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2017
|
Stage-I Approval on
|
:
|
10 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2022
|
|
|
|
22 Aug 2022
|
31
|
Andhra Pradesh
|
FP/AP/Pipeline/44624/2020
|
4-APB123/2021-VIJ
|
Diversion of 0.1511 ha. of FL in compt. no.969 of Vempadu RF in Yelamanchili Range of Visakhapatnam Division for laying pipeline and construction of pump house in favour of M/s. DSR Biotech Hatcheries
|
Pipeline
|
M/S DSR BIOTECH HATCHERIES
|
0.1511
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2020
|
Stage-I Approval on
|
:
|
08 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2022
|
|
|
|
22 Jul 2022
|
32
|
Andhra Pradesh
|
FP/AP/ROAD/25731/2017
|
4-APC053/2017-CHN
|
Rehabilitation and Up-gradation of Eeppurpalem - Ongole section from Km 195+000 to Km 254+500 of NH-214A (New NH-216).
|
Road
|
HIGHWAYS
|
10.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Apr 2017
|
Stage-I Approval on
|
:
|
29 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2022
|
|
|
|
15 Jul 2022
|
33
|
Andhra Pradesh
|
FP/AP/RAIL/32976/2018
|
4-APB064/2018-CHN
|
TINDIVANAM - NAGARI NEW BROAD GAUGE RAILWAY LINE
|
Railway
|
DY CHIEF ENGINEER CONSTRUCTION TAMBARAM
|
4.7
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2018
|
Stage-I Approval on
|
:
|
17 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2022
|
|
|
|
28 Jun 2022
|
34
|
Andhra Pradesh
|
FP/AP/RAIL/42716/2019
|
4-APB104/2020-VIJ
|
Raiway Tripling of Vijayavada to Gudur
|
Railway
|
RAIL VIKAS NIGAM LIMITED VIJAYAWADA
|
0.46
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2019
|
Stage-I Approval on
|
:
|
22 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2022
|
|
|
|
27 Jun 2022
|
35
|
Andhra Pradesh
|
FP/AP/ROAD/19911/2016
|
4-APC032/2017-CHN
|
Roads & Buildings Department, EE, NH, Vijayawada.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
21.343
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2016
|
Stage-I Approval on
|
:
|
06 Jul 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2022
|
|
|
|
28 Apr 2022
|
36
|
Andhra Pradesh
|
FP/AP/ROAD/19784/2016
|
4-APC028/2017-CHN
|
Roads & Buildings Department, EE, NH, Vijayawada.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
22.6388
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2016
|
Stage-I Approval on
|
:
|
07 Apr 2017
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2022
|
|
|
|
05 Apr 2022
|
37
|
Andhra Pradesh
|
FP/AP/Others/38959/2019
|
4-APB102/2020-CHN
|
Diversion of forest land for erecting obstacle light mast for aviation purpose at Kadapa Airport
|
Others
|
AIRPORTS AUTHORITY OF INDIA, KADAPA
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2019
|
Stage-I Approval on
|
:
|
07 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jan 2022
|
|
|
|
21 Feb 2022
|
38
|
Andhra Pradesh
|
FP/AP/Pipeline/42672/2019
|
4-APB124/2021-VIJ
|
Laying of 20 inch gas Pipeline (about 31 km) from Offshore Platform to Onshore gas Terminal at Mallavaram
|
Pipeline
|
ONGC
|
3.26
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2019
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Oct 2021
|
|
|
|
10 Feb 2022
|
39
|
Andhra Pradesh
|
FP/AP/Pipeline/42197/2019
|
4-APB130/2021-VIJ
|
Pipeline to eastablish Avanti feeds
|
Pipeline
|
AVANTI FEEDS LIMITED
|
0.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2019
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2022
|
|
|
|
07 Feb 2022
|
40
|
Andhra Pradesh
|
FP/AP/ROAD/64525/2020
|
4-APB125/2021-VIJ
|
Diversion of 0.85 Ha of forest land in Compartment no-132,Tadepalli RF,Guntur division,for providing BT surface to the road from Brhamanandapuram Crurch to AIIMS road in f/o Municipal Commissioner,Ta
|
Road
|
COMMISSIONER ,TADEPALLI MUNICIPALITY
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2022
|
|
|
|
07 Feb 2022
|
41
|
Andhra Pradesh
|
FP/AP/ROAD/22175/2016
|
4-TSC030/2017-CHN
|
Upgradation of NH-565 from Km.361/327 to Km.420/800 (Dornlala T Junction to Penchalakona section ) to two lane with paved shoulders in the state of Andhra Pradesh under NHDP-IV.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
33.459
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Nov 2016
|
Stage-I Approval on
|
:
|
09 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2021
|
|
|
|
11 Jan 2022
|
42
|
Andhra Pradesh
|
FP/AP/ROAD/30975/2017
|
4-APB063/2018-CHN
|
Relaying of Visakha Valley School Road from NH-16 Jn., to Beach Road, Visakhapatnam
|
Road
|
BOIDI SESHARAO
|
1.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2018
|
Stage-I Approval on
|
:
|
06 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2021
|
|
|
|
10 Jan 2022
|
43
|
Andhra Pradesh
|
FP/AP/WATER/30357/2017
|
G.O.Rt.No.77
|
Hindupur Muncipality - Comprehensive Water Supply Improvement Scheme as a source of Gollapalli Reservoir under AMRUT
|
Drinking Water
|
SUPERINTENDING ENGINEER PUBLIC HEALTH ANANTAPUR
|
0.405
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2017
|
Stage-I Approval on
|
:
|
13 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 May 2021
|
|
|
|
07 Jan 2022
|
44
|
Andhra Pradesh
|
FP/AP/Pipeline/40930/2019
|
4-APB105/2020-VIJ
|
This Cement plant was started in 2008.We require 0.11 Ha of Forest land for diversion in Comp No 98,Tangrda RF Guntur Division.
|
Pipeline
|
BHAVYA CEMENTS LIMITED
|
0.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2019
|
Stage-I Approval on
|
:
|
03 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2021
|
|
|
|
19 Nov 2021
|
45
|
Andhra Pradesh
|
FP/AP/ROAD/26219/2017
|
4-APB046/2017-CHN
|
Upgradation of NH-18 from Km 108/850 to 160/200 i.e from Rayachoty to Kadapa to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
1.81
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2017
|
Stage-I Approval on
|
:
|
05 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2020
|
|
|
|
12 Oct 2021
|
46
|
Andhra Pradesh
|
FP/AP/Others/14653/2015
|
4-APB015/2016-CHN
|
Sagarnagar beach front(opposite senora hotel) development
|
Others
|
AP TOURISM DEVELOPMENT CORPORATION
|
0.97
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2015
|
Stage-I Approval on
|
:
|
14 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2020
|
|
|
|
23 Sep 2021
|
47
|
Andhra Pradesh
|
FP/AP/Others/14660/2015
|
4-APB016/2016-CHN
|
yendada beach front(opposite blind School) development
|
Others
|
AP TOURISM DEVELOPMENT CORPORATION
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2015
|
Stage-I Approval on
|
:
|
15 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2020
|
|
|
|
23 Sep 2021
|
48
|
Andhra Pradesh
|
FP/AP/ROAD/26857/2017
|
4-APB048/2017-CHN
|
Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
2.03
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2017
|
Stage-I Approval on
|
:
|
05 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2021
|
|
|
|
23 Sep 2021
|
49
|
Andhra Pradesh
|
FP/AP/ROAD/29446/2017
|
4-APB052/2017-CHN
|
Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh. (3.93 Ha)
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
3.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2017
|
Stage-I Approval on
|
:
|
04 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2021
|
|
|
|
23 Sep 2021
|
50
|
Andhra Pradesh
|
FP/AP/RAIL/17757/2016
|
4-APA013/2016-CHN
|
Construction of New BG Railway line between Nadikudiand Srikalahasti Stations.
|
Railway
|
DEPUTY CHIEF PROJECT MANAGER WORLD CLASS
|
118.725
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2016
|
Stage-I Approval on
|
:
|
20 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Aug 2021
|
|
|
|
30 Jul 2021
|
|