SI
No.
|
File
no.
|
Name
of the proposal
|
State
|
Area
(ha)
|
Category
|
View Documents
|
|
1
|
8-61/2013-FC
|
Diversion of 116.13 hectares {74.70 ha
in Jalandhar Forest Division + 41.43 ha (PF
3.52 ha and Sec 4&5 of PLPA 7.91 ha) in Garhshankar
Forest Division} of forest land for four lanning
of Ropar-Nawanshahar Banga-Phagwara
road (Nawanshahar-Chandigarh road Km 0-10.5
B/s) Banga-Jandiala road Km 0-1 B/s Phagwara Banga Nawanshahar road Km 5-36 B/s) Canal R.D. from 9221 to
81600 r/s road from Km 52 to 53 and
Km 49.979 B/s under Forest Division and District Jalandhar, Garhshankar and Shahid Bhagat Singh Nagar,
Punjab.
|
Punjab
|
116.13
hectares {74.70 ha in Jalandhar Forest Division
+ 41.43 ha (PF 3.52 ha and Sec 4&5 of PLPA 7.91 ha)
|
Road
|
Click
On
|
|
2
|
F.
No. 8-87/2011-FC(Vol. I)
|
Diversion of 80.5232 ha (36.8333 ha in Sangrur Division + 43.6899 ha in Patiala Forest
Division) of forest land for four lanning of
Ludhiana-Hissar road km. 181-805 to 211-450,
211.450 to 229.500-234.600 to 238.695 B/s under Forest Division and Distt. Sangrur and Patiala,
Punjab..
|
Punjab
|
4.669
|
Road
|
Click
On
|
|
3
|
8-74/2013-FC
|
Diversion of 80.5232 ha (36.8333
ha in Sangrur Division +43.6899 ha in Patiala
Forest Division) of forest land for four lanning
of Ludhiana-Hissar road Km. 181-805 to 211.450
to 229.500-234.600 to 238.695 B/s under forest Division and Distt. Sangrur and Patiala,
Punjab.
|
Punjab
|
80.5232
|
Road
|
Click
On
|
|
T
C Nautiyal AIGF(FC)
|
|
SI
No.
|
File
no.
|
Name
of the proposal
|
State
|
Area
(ha)
|
Category
|
View Documents
|
|
1
|
8-75/2013-FC
|
Diversion of 73.49 ha forest land in Jharkhand for
the construction of 765 KV S/C Ranchi-Dharamjaygarh transmission line
Transmission Line in Favour of M/s Power Grid Corporation of India Ltd.
|
Jharkhand
|
73.49
|
Transmission Line
|
Click
On
|
|
2
|
8-71/2013
|
Diversion of 43.813 hectares of forest
land for construction of 400 KV D/C line from Daltonganj to Sasaram in favour of Power Grid Corporation of India Limited
|
Jharkhand
|
43.813
|
Transmission Line
|
Click
On
|
|
3
|
8-104/2012-FC
|
Diversion of 75.264 ha of forest land
for widening and strengthening of existing lane to double lane
carriageway in Km. 0.00 to Km 28.00 of NH-105 in Bihar under special project scheme.
|
Bihar
|
75.264
|
Road
|
Click
On
|
|
4
|
8-76/2013-FC
|
Diversion
of 96.3363 ha of forest land for installation of a Wind Power Project in Ahmednagar Forest Division, District Ahmednagar, Maharashtra in favour
of M/S Vish Wind Infrastructure LLP
|
Maharashtra
|
96.3363
|
Wind Power
|
Click
On
|
|
5
|
10-156/FCE
|
Grant of Temporary Working Permission over an
already broken up area of 18.69 ha from 265.865 ha of forest land in favour of M/s M/s Sri Ram
Mineral Company located at Barajamda, Khasjamda and Parambaljori
in West Singhbhum District of Jharkhand.
|
Jharkhand
|
18.69
|
MINING
|
Click
On
|
|
Additional
Agenda
T
C Nautiyal AIGF(FC)
|
|
SI
No.
|
File
no.
|
Name
of the proposal
|
State
|
Area
(ha)
|
Category
|
View Documents
|
|
1
|
8-28/2013-FC
|
Diversion of 172.468 ha of
forest land for Kikvi drinking water project,
District Nashik, Maharashtra.
|
Maharashtra
|
172.468
|
Drinking water
|
Click
On
|
|
[H. C. Chaudhary,
AIGF (FC)]
|
|
SI
No.
|
File
no.
|
Name
of the proposal
|
State
|
Area
(ha)
|
Category
|
View Documents
|
|
1
|
8-47/2013-FC
|
Diversion of 48.486 + 98.75+
29.609=176.845 ha. of forest land in favour of
Project Director, NHAI, PIU, Chandigarh for 4/6 lanning
of Panchkula-Barnala-Saha-Yamunanagar Road
including construction of bypass (NH73) upto
Haryana / U.P. Border, under Forest Division and District Yamuna Nagar, Ambala and Morni-Pinjor/ Panchkula, Haryana.
|
Haryana
|
176.845
|
Highway
|
Click
On
|
|
2
|
8-63/2013-FC
|
Diversion of 204.356 hecatres of forest land in favour
of M/s. Power Grid Corporation of India Limited for construction of 765
KV Vindhyachal Poling Station to to Satna Circuit –I and
Circuit-II Transmission line in Satna, Singfraiukli, Katni and Sahdol disricts,Madhya
Pradesh.
|
Madhya Pradesh
|
204.356
|
Transmission Line
|
Click
On
|
|
3
|
8-172/86-FC pt-II
|
Proposal to obtain prior approval of
Central Government for change of user agency from Irrigation Department,
State Government of Uttarakhand to Uttarakhand Jal Vidhyut Nigam Limited (UJVNL) in respect of 768.1552
hectares of forest land (out of the 868.08 hectares of forest land
already diverted in favour of the Irrigation
Department for construction of Lakhwar Vyasi Multipurpose Project) for construction of Lakhwar multi-purpose project in Dehradun
and Tehri Garhwal
districts of Uttarakhand.
|
Uttarakhand
|
768.1552
|
Hydel
|
Click
On
|
|
4
|
8-40/1993-FC – pt-III
|
Diversion of 1294.283 ha of
forest land including safety zone of 25.275 ha within the mining lease
area of Panchpatmali Central & North Block
over 1315.363 ha during 1st RML period for bauxite mining by
M/s National Aluminum Company Ltd. in Koraput
district of Odisha.
|
Odisha
|
1294.283
|
Mining
|
Click
On
|
|
5
|
8-74/2013-FC
|
Proposal to obtain prior
approval of Central Government under the Forest (Conservation) Act, 1980
for drilling of 10 bore holes of 4 inch diameter in 82.428 hectares of
forest land located in Kanhan Range in South Chhindwara Forest Division, in district Chhindwara, Madhya Pradesh by M/s. Soni Minerals, 10 Tilak
Nagar, Nagpur, Maharashtra.
|
Madhya Pradesh
|
Nil
|
Mining
(Prospecting only)
|
Click
On
|
|
Additional Agenda
|
|
SI
No.
|
File
no.
|
Name
of the proposal
|
State
|
Area
(ha)
|
Category
|
View Documents
|
|
1
|
8-61/99-FC
(pt-III)
|
Change
in a condition stipulated in the approval accorded under the Forest
(Conservation) Act, 1980 for collection
of minor minerals from 384.69 ha. forest land located in river bed of Sharda river in Champawat
district of Uttarakhand for a further period of
10 years by the Uttarakhand Forest Development
Corporation Ltd
|
Uttarakhand
|
Nil
|
Mining
|
Click
On
|