FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/13914/2015   (ii). Name of Project for which Forest Land is required : Deghat to Lalnagari Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Deghat to Lalnagri motor road stage – I work is proposed in phase - XVIth. The all weather road connectivity project is to formulated for village, which are having population more than 250. The targeted village Lalnagri has population 668 but yet not connected with road. The construction length of   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 702.44   (viii). Area of forest land proposed for diversion(in ha.): 3.844   (ix). Non-forest land required for this project(in ha.): 8.441   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : Executive Engineer construction Division P.W.D. Sult (Almora)   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263676   (vii). Landmarks : PWD Salt (Jhimar)   (viii). Email address : eepmgsysalt@rediffmail.com   (ix). Landline Telephone No. : 211126   (x). Fax No. : 0   (xi). Mobile No. : 7055613643   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Chandan   (ii). Middle Name: NIL   (iii). Last Name: Choudhary   (iv). Gender: Male   (v). Designation: Computer Operator   (vi). Address 1: Executive Engineer C.D.P.W.D. Salt (Almora)   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Salt   (xi). Pin: 263676   (xii). Landmarks: PWD Salt (Jhimar)   (xiii). Email Address: eepmgsysalt@rediffmail.com   (xiv). Landline Telephone No.: 211126   (xv). Fax No.: NIL   (xvi). Mobile No.: 7055613643   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora3.8448.441
Total3.8448.441
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora3.8448.441
Total3.8448.441
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Basnal Gaon0.4580.542
2Lalnagari3.3857.899
3.843 8.441
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Motor Road3.8438.44092
Total 3.843 8.44092
C. Maps of forest land proposed to be diverted
Division 1. : Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 3.844   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.3.844    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 15000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (a). Provide reasons thereof: Compensatory Afforestation   (b). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation:(in ha.) 3.844   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Almora
  (a). Village: Jhadgaon & Okhalia   (b). Area(in ha.): 7.688   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 20   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1A short narrative
2Administrative and Financial sanction
3Preliminary Joint Inspection
4Comparative chart
5Certificate from the DM
6Category wise
7Bar Chart
8Certificate regarding suitability
9Undertaking by the User Agency
10Road side/gap filling plantation
11Details of the trees
12Felling of Oak trees
13If felling of trees is not involved
14dfo letter no.5878/12-1(2)
15Certificate of felling minimum trees
16Authority of the persn making this application to make application on behalf of user agency
17FRA
18Whether project area is a part of National Park
19Colored copy of the google map for CA
20objection removed vide dfo letter no.memo/12-1(2)dated20.8.17
21If the Project falling within the National park
22Survey of india toposheet for CA
23new toposheet of road alignment
24PointNo7 proof of length of road given by user agency
25No violation has taken place
26geo refrence map of road alignment
27Muck Disposal & NOC of land owner Point No 8 and 9
28NOC from local Gram Sabhas
29FRA lalnagri with basanalgaon and dm certificate
30Certificate- work has not been started reg
31Geologist Report
32Task Force report
33Certificate by user agency for complying
34condition imposed in geologist report
35religious place
36Undertaking regarding no animal
37Undertaking to provide alternative
38Objection removed vide dfo letter no.memo/12-1(2) dated 30/7/2016
39Benefited villages
40NPV calculation
41Undertaking of payment of NPV
42Cost of the forest land
43demarcation work
44Non-availability
45Check list
46point wise detail of objection as per dfo letter no.memo/12-1(2)dated 20/6/2016 all point attached
47new Muck Disposal plan NOC and Land schedule balance objection point wise detail
48objection removed dfo eds dated 30/6/2017
49Upyogita CA Certificate
50objection hard copy summited DFO office.Recieving ofojection download online
51objection removed vide letter no.memo/12-1(2)dated 7.10.2017
52Revised FRA deghat-lalnagri motor road
53geo refrence map CA
54toposheet of CA
55MUCK DISPOSAL & NOC
56OBJECTION LETTER RECIEVED BY DFO OFFICE
57FRA DOCUMENT
58new administrative approval letter point no.7
59CA
60OBJECTION REMOVED BY LETTER NO.395/19C DATED 7.5.2016