FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/48748/2020   (ii). Name of Project for which Forest Land is required : Construction of Babed Dhar Luhan Band To Bagana Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : If the road connectivity is provided to the villagers it shall enhance the social and economical developement of this area and migration of the people from the village shall be minimized.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 520   (viii). Area of forest land proposed for diversion(in ha.): 4.205   (ix). Non-forest land required for this project(in ha.): 2.913   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : Executive Engineer,ty.division,PWD,Sahiya Dehradun   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 248196   (vii). Landmarks : civil land   (viii). Email address : eepwdsahiyakalsi@gmail.com   (ix). Landline Telephone No. : 274595   (x). Fax No. : 1360   (xi). Mobile No. : 9412917304   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: S   (ii). Middle Name: K   (iii). Last Name: Tyagi   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: O/0 E.E., Ty.Div.,PWD, Sahiya   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Dehradun   (x). Tehsil: Dehradun   (xi). Pin: 248196   (xii). Landmarks: civil land   (xiii). Email Address: eepwdsahiyakalsi@gmail.com   (xiv). Landline Telephone No.: 274595   (xv). Fax No.: 1360274595   (xvi). Mobile No.: 9412917304   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chakrata4.2052.913
Total4.2052.913
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun4.2052.913
Total4.2052.913
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bagna4.2052.913
4.205 2.913
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Linear(Road)4.0252.625
2Dumping0.180.288
Total 4.205 2.913
C. Maps of forest land proposed to be diverted
Division 1. : Chakrata
  (i). Area of forest land proposed to be diverted(in ha.) : 4.205   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.4.205    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (a). Provide reasons thereof: Road Construction   (b). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation:(in ha.) 8.41   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Dehradun
  (a). Village: bagna   (b). Area(in ha.): 8.41   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 56,57   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1joint Inxpection letter
2objection removed as per letter no 1328/6c dt 19/7/2021 (attached in ADITIONAL INFORMATION HAVING FILE NAME "REPLY OF eds DT 22/7/2021"
3objection removed as per letter no 1328/6c dt 19/7/2021 (attached in ADITIONAL INFORMATION HAVING FILE NAME "REPLY OF eds DT 22/7/2021"
4prarup-2
5prarup-3
6prarup-14
7LxB of project
8work not start certificate
9detailed affected trees list
10banj tree certificate
11minimum trees faling
12arial distance certificate
13NOC villagrs
14FRA
15Geologist recomendation
16Task force certificate
17standard conditions
18non religious and non historic certificate
19wild life certificate
20kerosene oil availability
21village benificial certificate
2210 years CA Estimate
23CA site suitability certificate
24Road side plantatio cert.
25Muck disposal plan
26NPV
27NPV increased payment certificate
28Demarcation pillar etc estimate
29GO
30Check list
31MOU
32Muck disposal certificate
33short detail of work
34joint inspection and tree list
35Alignment comparision
36land schedule
37Authority letter
38replyEDS
39Barchart
40Law violation 1980 certificate
41site suitability
42fact sheet
43Form 48
44Sir Reply letter of Objection Received in EDS is Attached in Additional Documents
45removed of objection
46removed of objection letter
47objection removal latter dt 27-09-2021
48remove for objection and jiomap refrence date 16-12-2021
49Removed objection letter no 829/6C Dt 05-06-2023
50Prarup 52
51The proceedings at your level on the above subject are being held
52Prarup 57
53Prarup 58
54Prarup 59
55Prarup 60
56Prarup 61
57Prarup 63
58Prarup 64
59Prarup 65
60Prarup 67
61Prarup 69
62Pariyojna ki lagat pramand patr
63Prarup 33
64google image proposed road with colour coding
65objection remove letter no 1897/6C dt 28/11/25
66Attached Letter no 2068/6C Dt 11-12-2024
67Request for joint inspection report of first alignment as per Attached letter no 1264/6C Dt 01.08.2024