FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/121750/2021   (ii). Name of Project for which Forest Land is required : Construction of Dungra (Bachansyu) to Arsuin Motor road under State Sector   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : After construction of this road village Dungra (Arsuin) will bet educational, social, Transporation Health etc facilities.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 37.8   (viii). Area of forest land proposed for diversion(in ha.): 1.69   (ix). Non-forest land required for this project(in ha.): 0.59   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PUBLIC WORK DEPARTMENT   (ii). Address1 : PWD PROVINCIAL DIVISION RUDRAPRAYAG   (iii). Address2 : UTTARAKHAND   (iv). State : Uttarakhand   (v). District : Rudraprayag   (vi). Pin : 246171   (vii). Landmarks : NIL   (viii). Email address : eepwd_rpg@rediffmail.com   (ix). Landline Telephone No. : 233204   (x). Fax No. : 0   (xi). Mobile No. : 7500217670   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Er Indrajit   (ii). Middle Name: NIL   (iii). Last Name: Bose   (iv). Gender: Male   (v). Designation: EXEUTIVE ENGINEER   (vi). Address 1: P.D. PWD RUDRAPRAYAG   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Rudraprayag   (x). Tehsil: Rudraprayag   (xi). Pin: 246171   (xii). Landmarks: NIL   (xiii). Email Address: eepwd_rpg@rediffmail.com   (xiv). Landline Telephone No.: 233204   (xv). Fax No.: NIL   (xvi). Mobile No.: 7500217670   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag1.690.59
Total1.690.59
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag1.690.59
Total1.690.59
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Dungra (Arsuin)1.690.59
1.69 0.59
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road constuction1.540.56
2Muck dumping0.150.0299
Total 1.69 0.5899
C. Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
  (i). Area of forest land proposed to be diverted(in ha.) : 1.69   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.69    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 12995
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Rudraprayag
  (a). Village: Srikot Lagga Dungra   (b). Area(in ha.): 3.38   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 867, 868   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1EDS removed and letter attached dated 17.07.2021
2SIR Certificate
3Revised muck disposal Plan and calculation
4EDS removed and latter attached dated 05-10-2021
5Cover page, Index, Report
6Agreement between User agency and land holders (Farmers)
7Part I
8EDS removed latter attached
9Part II
10Part III to V
11Sanctioned order of work (G.O.)
12Certificate of Joint survey report
13Certificate of minimum demand of land, Land schedule and L x B of project
14Certificate of Bar Chart
15Certificate of CA
16Certificate of trees details
17Certificate of Banj Trees
18Certificate of National park, Aerial Distance certificae and Act 1980
19NOC of villagers
20Certificate of Layout plan and work not started
21Geologist Survey Report
22Task force certificates
23Certificates of Regional and Historical place, No loss of wild life, Kerosine and benefited villagers
24NPV certificate and value of Land certificate
25Lease certificate, RCC pillar, Component area of R.F.
26Table 4
27Trees not effecting certificate
28Comperative alignment
29NPV Certificate
30Certificate of Place is not Important, Alternate Alignment, Soil Erosion
31CA suitability certificate
32Certificate of Center Verge, Employment generation, Catchment Treatment plan
33Online web portal Part I
34Fact sheet
35NOC of NAAP Land
36Calculation of SSP for CA of Ten Year
37EDS letter dated 05-08-2021
38EDS letter dated 23-08-2021