FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/TG/MIN/34878/2018   (ii). Name of Project for which Forest Land is required : 2nd Renewal of Indaram Mining Lease in cludung surface area of 15.18 Ha in Mancherial district - 929.29 Ha   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : 2nd Renewal of 929.29 Ha of Indaram Mining lease including surface rights of 15.18 Ha for surface use of of forest land in Mancherial forest division in favour of M/s.SCCL   (iv). State : Telangana   (v). Category of the Proposal : Mining   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 32700   (viii). Area of forest land proposed for diversion(in ha.): 929.29   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : SINAGRENI COLLIERIES COMPANY LIMITED   (ii). Address1 : General Manager, SriRampur Area, SCCL   (iii). Address2 : NIL   (iv). State : Telangana   (v). District : Adilabad   (vi). Pin : 504303   (vii). Landmarks : NIL   (viii). Email address : est_srp@scclmines.com   (ix). Landline Telephone No. : 238817   (x). Fax No. : NIL   (xi). Mobile No. : 9491145252   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: B   (ii). Middle Name: NIL   (iii). Last Name: Balasubramanyam   (iv). Gender: Male   (v). Designation: SrEO   (vi). Address 1: O/o General Manger, Sri Rampur Area, SCCL   (vii). Address 2: NIL   (viii). State: Telangana   (ix). District: Adilabad   (x). Tehsil: Jaipur   (xi). Pin: 504303   (xii). Landmarks: NIL   (xiii). Email Address: est_srp@scclmines.com   (xiv). Landline Telephone No.: 238817   (xv). Fax No.: NIL   (xvi). Mobile No.: 9491145252   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
  (i). Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency: No
Serial No Area No of patch Area of patch Uploaded patch Uploaded GPS Date of return Authority Uploaded documentary proof
NIL
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : Yes   (ii). Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past.
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mancherial929.290
Total929.290
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mancherial929.290
Total929.290
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
NIL
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Underground Mining914.110
2Surface Rights15.180
Total 929.29 0
C. Maps of forest land proposed to be diverted
Division 1. : Mancherial
  (i). Area of forest land proposed to be diverted(in ha.) : 929.29   (ii).Shape of forest land proposed to be diverted : Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of Patches To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.929.29    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: J-11015/304/2007-IA.II(M)   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: 24 Oct 2008
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
M. Mining Details
M-1.1 . Details of grant/renewal of mining lease in the past
Serial No Period Date of grant/renewal Designation of authority Copy of grant of the mining lease Date of execution Copy of the lease deed
129 Jul 2000 To 28 Jul 202023 Jan 2006Secretary to govt29 Jul 2000
 (i) Nature and quantity of mineral actually extracted from the forest and non-forest land NIL
Serial No Mineral Qty. of ore proposed to be extracted during the lease period Qty. of ore actually extracted during the lease period
Forest land Non-Forest land Forest land Non-Forest land
1Coal and Lignite929.290929.290
Application under the Mineral Concession Rules, 1960 for renewal of the mining lease : No
M-2 . Details of Mining Plan
(i) Date of approval of mining plan : 21 Aug 2017 (ii) Approval authority : Ministry of Coal , GoI (iii) Copy of approval of mining plan : (iv) Copy of approved mining plan : (v) Nature of mining (underground/opencast) : Underground (vi) Copy of 3D subsidence analysis report : (vii) Copy of the detailed land use plan in 14,000 scale prepared by using DGPS or Total Station :   (viii).  Copy of map of the outer boundary of mining lease area:
M-3 . Details of prospecting undertaken to assess mineral reserves
M-4 . Details of extension (if any) of original prospecting licence issued in the past
(i) Extension of original prospecting license was extended : No
Serial No Designation of authority Date of grant From date To Date Copy of the approval accorded for extension
NIL
M-5 . Brief details of prospecting activities undertaken in the mining lease
(i) Detail of prospecting activity under taken in the mining lease : Nill NIL
M-5.1 . Details of bore holes drilled for prospecting
Serial No No. of Bore holes Diameters(inch) No. of Bore holes Diameters(inch)
NIL
M-5.2 . Estimated Reserve along with accuracy and confidence level
Serial No Mineral Estimated Reserve in forest land Estimated Reserve in non-forest land
Estimated Reserve % accuracy % confidence level Estimated Reserve % accuracy % confidence level
NIL
M-6 . Details of approval under the Forest(Consevation) Act,1980 obtained for undertaking prospecting activities in the forest land located in the mining lease
(i) Approval under the Forest(Conservation) Act, 1980 for undertaking prospecting activities in the forest land : No
M-7 . Mineral wise details
Serial No Minerals Estimated non forest land Estimated forest land Proposed annual extraction Estimated life of mine Total extraction Estimated mineral
NIL
(i) Proposed use of the minerals proposed to be raised from the mining lease : Non captive (ii) Copy of details of the plan for the transportation of the minerals : No Data
Additional information Details
Documents
S.No Documents
Remarks
1Form-B
2Undertakings
3Plan
4Location Plan
5Mining plan
6Compliance on condition of IML - 1070 Ha
7Reply to the EDS raised by MOE&CC, GOI
8Kindly forward the EDS reply to the PCCF
9Kindly forward the EDS reply to the PCCF
10Kindly forward the EDS reply to the PCCF