FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/ROAD/29812/2017   (ii). Name of Project for which Forest Land is required : Laxmipura-Dora-Dabi-Ranaji Ka Guda NH-12   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Project, NH 12-Laxmipura-Dora-Dabi-Ranaji ka Gudha Road starts from T-Junction with NH-12 (Kota-Bundi Section) at Moheepura & terminates at 3-legged junction near Ranaji ka Gudha. The project road overlaps with NH-76 for 3.7 km and diverges to left from Dabi town. The Project Road as described   (iv). State : Rajasthan   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 10325   (viii). Area of forest land proposed for diversion(in ha.): 32.3264   (ix). Non-forest land required for this project(in ha.): 46.6192   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : ADD. CHIEF ENGINEER PPP PWD   (ii). Address1 : Additional Chief Engineer PPP PWD,Rajasthan,Jaipur-302006   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302006   (vii). Landmarks : Opposite Jaipur Club,Jaipur-Rajasthan   (viii). Email address : pdkotappppwd@gmail.com   (ix). Landline Telephone No. : 5110547   (x). Fax No. : 5110547   (xi). Mobile No. : 9413369360   (xii). Website (if any) : www.pwd.rajasthan.gov.in   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Naurat   (ii). Middle Name: Mal   (iii). Last Name: Agarwal   (iv). Gender: Male   (v). Designation: Project Director   (vi). Address 1: Public Works Department (PPP-1 Division) Ajmer (Raj.)   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Ajmer   (x). Tehsil: Ajmer   (xi). Pin: 305007   (xii). Landmarks: Office of the Project Director   (xiii). Email Address: pdkotappppwd@gmail.com   (xiv). Landline Telephone No.: 5110547   (xv). Fax No.: 01415110547   (xvi). Mobile No.: 9413369360   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bundi Territorial32.326446.6192
Total32.326446.6192
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bundi32.326446.6192
Total32.326446.6192
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bharta Bavdi1.91233.1794
2Laxmipura1.15656.5475
3Maradi Talab2.81375.2506
4Dora10.70913.7545
5Kachaliya3.96053.5535
6Kanwarpura7.09593.744
7Dabi1.5523.7192
8Chhant ka Khera1.97443.4205
9Lambakoh1.15213.45
32.3264 46.6192
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Development of Road32.326446.6192
Total 32.3264 46.6192
C. Maps of forest land proposed to be diverted
Division 1. : Bundi Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 32.3264   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : Six
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.3.0688    View File
2.19.4592    View File
3.5.12    View File
4.1.552    View File
5.1.9744    View File
6.1.152    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Road is already exist.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 850
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : Yes   (a). Whether Project or a part thereof is located within a Protected Area ? : Yes   (b). Status of approval of the Supreme Court : Application yet to b   (ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project : Application under process   (a). Date of submission of proposals : 22 Nov 2022   (b). Current status : NIL
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Bundi
  (a). Village: Bhartabawri Forest Block   (b). Area(in ha.): 60   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Degraded Forest Land   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Bundi
  (a). Village: Chanda Ka Talab   (b). Area(in ha.): 32.3264   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 355/241,357/243   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Reply Letter of 30.08.2022 EDS
2Administrative and Financial Sanction.
3Project Report.
4Typical Cross Section.
5Reply letter of 30.12.2022 EDS.
6EDS reply Lettter 14_02_2020.
7CERTIFICATE FOR MINIMUM USE OF FOREST LAND.
8UNDERTAKING FOR CA Land NFL.
9UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING.
10UNDERTAKING FOR FRA CERTIFICATE.
11UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND.
12UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE MINIMUM FOREST LAND.
13UNDERTAKING FOR PAYMENT OF ANY OTHER COST and CONDITION.
14UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.
15UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.
16Undertaking for Use of Any Material From Forest Land During CONSTRUCTION OF ROAD.
17UNDERTAKING FOR USE OF FOREST LAND.
18EDS Reply Letter dated 06_07_2020.
19Undertaking for Waste Management.
20Khasra Map and Jamabandi.
21Bar Chart status.
22EDS Reply Letter DFO Bundi dated 16_12_2020.
23UNDERTAKING BY USER AGENCY TO RAISE STRIP PLANTATION.
24EDS Reply Letter dated 30_09_2021.
25Village Wise Area Calculation Sheet.
26Digital Maps.
27Segment Wise Area Calculation Sheet.
28Toposheet Map.
29Reply of EDS raised on dated 29.03.2023.
30Wildlife NoC Undertaking.
31Cost Benefit Analysis Report.
32Reply of 24.05.2023 EDS.
33Reply of 19.04.2023 EDS.
34Proposed CA land Map NFL
35CA Land Allotment Documents NFL
36Reply of 16.01.2023
37New CA Land has been identified and Land Allotment / Set Apart Letter has been issued by District Collector Bundi. Accordingly CA Land Maps as well as KML file of the proposed Land has been Prepared and uploaded in the Part Ist .
38Reply of EDS raised on dated 31.05.2024.
39EDS Reply Letter dated 18_09_2024 with Annexure
4080th NBWL MoM.
41Reply of EDS raised on dated 10.07.2024