FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/KA/WATER/65437/2020
(ii). Name of Project for which Forest Land is required :
Diversion of 575.0749 Ha of Forest land for the construction of dam across Markandeya River and ancillary infrastructure in forest lands of Gokak, Godachinamalki, Konnur and Mavanura villages in Gokak and Hukkeri Taluks, Belagavi District for storing 6 TMC of water under Ghatti-Basavanna Drinking Water Supply Project by KNNL, Govt of Karnataka.
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Ghatti Basavanna Drinking Water Supply envisages construction of dam across Markandeya River near Gokak to store 6 TMC of water. The project aims at providing drinking water to the Gokak, Hukkeri, Bailahongal and other towns and surrounding villages deprived of drinking water facilities.
(iv). State :
Karnataka
(v). Category of the Proposal :
Drinking Water
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
99000
(viii). Area of forest land proposed for diversion(in ha.):
575.0749
(ix). Non-forest land required for this project(in ha.):
63.0146
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
KARNATAKA NEERAVARI NIGAM LIMITED
(ii). Address1 :
Executive Engineer, KNNL, GRBCC Division 3 Gokak
(iii). Address2 :
NIL
(iv). State :
Karnataka
(v). District :
Belgaum
(vi). Pin :
591307
(vii). Landmarks :
NIL
(viii). Email address :
eegrbcc.fc@gmail.com
(ix). Landline Telephone No. :
23016200
(x). Fax No. :
NIL
(xi). Mobile No. :
9886599677
(xii). Website (if any) :
NIL
(xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
(xiv). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
U G
(ii). Middle Name:
NIL
(iii). Last Name:
Benner
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
Executive Engineer, KNNL, GRBCC Division, Gokak
(vii). Address 2:
NIL
(viii). State:
Karnataka
(ix). District:
Belgaum
(x). Tehsil:
Gokak
(xi). Pin:
591307
(xii). Landmarks:
NIL
(xiii). Email Address:
eegrbcc.fc@gmail.com
(xiv). Landline Telephone No.:
23016200
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9886599677
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7.
Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9.
Details of Transfer of Lease
Serial No
Name of person
Address of person
Date of transfer
MMDR File
Transfer Deed
Conservation
MoEF_file No
Date of approval
MoEF file
NIL
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
(i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. :
No
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Belgaum
22.411
0
2.
Gokak
552.6639
63.0146
Total
575.0749
63.0146
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Belgaum
575.0749
63.0146
Total
22.411
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Gokak
388.0412
38.6919
2
Godachinamalki
43.8791
0
3
Mavanura
22.411
0
4
Konnur
120.7435
0
5
Byadarahatti
0
24.3226
575.0748
63.0145
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Submergence
519.675
55.3492
2
Dam Seating
2.7849
0.5689
3
Approach Road
18.1053
3.1782
4
Dam Office and Guest House
4.4953
0
5
Dam View Point
8.4493
0
6
Water Treatment Plant and Colony
0
3.0794
7
Retaining Wall
0.1616
0
8
Steps
0.8171
0
9
Downstream Impounding Reservoir
18.0978
0.8386
10
Utility
1.054
0
11
Landing
0.6558
0
12
Foot Bridge
0.7783
0
Total
575.0744
63.0143
C.
Maps of forest land proposed to be diverted
Division 1. : Gokak
(i). Area of forest land proposed to be diverted(in ha.) :
552.6639
(ii).Shape of forest land proposed to be diverted :
Non Linear
(a). No. of patches :
Eleven
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
497.264
View File
2.
2.784951
View File
3.
18.097837
View File
4.
4.495351
View File
5.
8.449366
View File
6.
18.105315
View File
7.
0.16167
View File
8.
0.817165
View File
9.
1.054058
View File
10.
0.655874
View File
11.
0.778318
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 2. : Belgaum
(i). Area of forest land proposed to be diverted(in ha.) :
22.411
(ii).Shape of forest land proposed to be diverted :
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
22.411
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
250
(iii). Temporary Employment(Number of person-days):
50
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
Yes
(a). Total Number of families :
70
(b). Number of Scheduled Caste families :
10
(c). Number of Schedule Tribes families :
35
(d). Number of other families :
25
(ii). Copy of Rehabilitation and Resettlement Plan:
No Data
(a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
Three
District 1. : Belgaum
(a). Village:
Gokak Range - Khanagaon, Pudukalkatti
(b). Area(in ha.):
72.78
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
700, 272
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
District 2. : Belgaum
(a). Village:
Athani Range-Artal, Telsang, Kanhal, Koohalli
(b). Area(in ha.):
462.64
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
Sy No 28, 550, 998, 999, 1000, 108, 337, 338, 339, 340, 341, 342, 343, 344, 345, 346, 74, 84, 86, 97, 163
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
District 3. : Belgaum
(a). Village:
Savdatti Range - Mugalihal, Murgod
(b). Area(in ha.):
153.68
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
165,166,169,170,184,204,207,214,215,171,205,206,216,928,840,597
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
CA Land Area Statement
2
CA Land 20 and Corner GPS Coordinates
3
Balance Plantation Area details
4
Typical Cross section of the Road
5
Reply to the EDS raised by DCF, Gokak on 03.01.2023
6
EDS Raised by PCCF FC and Nodal Officer FCA on 26-12-2022. Reply enclosed
7
Project drawings
8
Master plan
9
Administrative Approval
10
Clarification on Project Components in Forest Area
11
Undertaking to pay CA
12
Undertaking for On ground Demarcation
13
Details of Forest Land Required
14
Details of Non-Forest Land Required
15
Area Statement of Linear Components
16
Component Wise Breakup of Forest Land
17
Minimum use of Forest
18
Net Present Value
19
20 m GPS Coordinates of forest land
20
CA land Suitability Certificate
21
Compliance to Observations
22
RTCs of Forest Land
23
Complaince To EDS raised By MoEF & CC dated 16.03.2023 Part 1
24
Wildlife Conservation Plan
25
Alternatives Examined
26
Complaince To EDS raised By MoEF & CC dated 16.03.2023 Part 2
27
Compliance to EDS Dated 23.08.2023