FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/KA/Others/17464/2016   (ii). Name of Project for which Forest Land is required : Diversion of 235.648Ha. outside ML area of Donimalai at Donimalai Complex, in favour of the NMDC Limited   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Donimalai Iron ore Mine of NMDC Limited had submitted an application for diversion of 235.648 Ha of forest area including regularization of 96.87Ha utilized for infrastructure development and 136.778 Ha of inter locked forest areas outside ML (2396) area at Donimalai Complex   (iv). State : Karnataka   (v). Category of the Proposal : Others   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 39131   (viii). Area of forest land proposed for diversion(in ha.): 235.648   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : NMDC LIMITED DONIMALAI   (ii). Address1 : Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)   (iii). Address2 : Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)   (iv). State : Karnataka   (v). District : Bellary   (vi). Pin : 583118   (vii). Landmarks : Donimalai   (viii). Email address : envdiom@gmail.com   (ix). Landline Telephone No. : 274624   (x). Fax No. : NIL   (xi). Mobile No. : 9691162304   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: SANJEEV   (ii). Middle Name: NIL   (iii). Last Name: SAHI   (iv). Gender: Male   (v). Designation: GENERAL MANAGER   (vi). Address 1: Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)   (vii). Address 2: Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)   (viii). State: Karnataka   (ix). District: Bellary   (x). Tehsil: Sandur   (xi). Pin: 583118   (xii). Landmarks: Donimalai   (xiii). Email Address: envdiom@gmail.com   (xiv). Landline Telephone No.: 274624   (xv). Fax No.: 08395274649   (xvi). Mobile No.: 9691162304   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bellary235.6480
Total235.6480
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bellary235.6480
Total235.6480
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Narsinghapura, Donimalai South Range235.6480
235.648 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Power Lines10.490
2Tunnel0.570
3Conveyor2.740
4Water Pipeline0.850
5Railway Line0.390
6Tailing Dam Area43.690
7Water Treatment Plant2.570
8Valley Store Area3.420
9Autogarage2.320
10Mechanical Office2.970
11Water Tank Area5.170
12Screening Plant Area4.550
13Borewell Area0.330
14Stock Yard1.50
15Control Room0.150
16Roads15.160
17Interlocked area between infrastructures138.7780
Total 235.648 0
C. Maps of forest land proposed to be diverted
Division 1. : Bellary
  (i). Area of forest land proposed to be diverted(in ha.) : 235.648   (ii).Shape of forest land proposed to be diverted : Hybrid   (a). No. of patches : Twelve
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of Patches To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.43.69    View File
2.2.57    View File
3.3.42    View File
4.2.32    View File
5.2.97    View File
6.5.17    View File
7.4.55    View File
8.0.33    View File
9.1.5    View File
10.0.15    View File
11.15.16    View File
12.138.778    View File
  (b). No. of Segments : Five
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.10.49    View File
2.0.57    View File
3.2.74    View File
4.0.85    View File
5.0.39    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: No
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: J-11015/151/2008-IA.II(M)   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: NIL
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted: No Data
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1additional Information point no.3
2Ecozone Map
3FRA
4Land Suitability
5Proposed Regularization GPS readings in Degree Decimals.
6Cover letter for submission of revised proposal (235.648Ha.)
7Undertaking for CA charges for proposed area.
8Undertaking for NPV & Addl NPV charges for proposed area.
9Undertaking for stock yard and Screening Plant.
10Undertaking for forest area interlocked between the infrastructures
11Undertaking for minimum forest area utilization.
12DIOM FC copy.
1310Km radius map from the proposed area.
14Mine plan approval copy.
15Revised Justification of the porposal.
16Cost benefit analysis for proposal.
17Addl. CA 197.608Ha Google Map
18Addl. CA 197.608Ha Village Map
19Letter to DCF against clarification on 04.07.2022
20Google map of CA land for proposed area (235.648Ha.)
21Village map of CA land for proposed area (235.648Ha.)
22Reply letter with relevant annexures against the EDS raised by MoEF dated.17.12.2022.