FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/JH/RAIL/47332/2020
(ii). Name of Project for which Forest Land is required :
Magadh Railway Siding
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The application for diversion of Forest Land for 121.29 Ha is intended for construction of railway siding for evacuation of Coal. The proposal includes construction of Railway siding, Silo, CHP, Belt conveyor, Culvert & Bridges, Green belt, Road, Infrastructure etc. The alignment has minimum forest
(iv). State :
Jharkhand
(v). Category of the Proposal :
Railway
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
40210
(viii). Area of forest land proposed for diversion(in ha.):
121.29
(ix). Non-forest land required for this project(in ha.):
130.22
(x). Total period for which the forest land is proposed to be diverted(in years):
30
A-2.
Details of User Agency
(i). Name :
Central Coalfields Limited
(ii). Address1 :
DARBHANGA HOUSE, CCL, RANCHI
(iii). Address2 :
NIL
(iv). State :
Jharkhand
(v). District :
Ranchi
(vi). Pin :
834029
(vii). Landmarks :
NIL
(viii). Email address :
pomagadhccl@gmail.com
(ix). Landline Telephone No. :
2365806
(x). Fax No. :
NIL
(xi). Mobile No. :
8987788576
(xii). Website (if any) :
www.centralcoalfields.in
(xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
(xiv). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
Sadala Satyanaran
(ii). Middle Name:
NIL
(iii). Last Name:
NIL
(iv). Gender:
Male
(v). Designation:
PO
(vi). Address 1:
Office of Project Officer, Magadh, kundi, tandwa Jharkhand
(vii). Address 2:
NIL
(viii). State:
Jharkhand
(ix). District:
Chatra
(x). Tehsil:
NIL
(xi). Pin:
825321
(xii). Landmarks:
NIL
(xiii). Email Address:
pomagadhccl@gmail.com
(xiv). Landline Telephone No.:
236004
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8987788576
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7.
Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9.
Details of Transfer of Lease
Serial No
Name of person
Address of person
Date of transfer
MMDR File
Transfer Deed
Conservation
MoEF_file No
Date of approval
MoEF file
NIL
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
(i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. :
No
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Chatra South
17.01
0
2.
Latehar
104.28
130.22
Total
121.29
130.22
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Chatra
17.01
0
2.
Latehar
104.28
130.22
Total
121.29
130.22
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Kundi
10.28
0
2
Kurlonga
6.73
0
3
Ara
41.45
67.27
4
Chamatu
16.89
26.09
5
Chetar
14.03
8.37
6
Seregada
17.02
0.06
7
Phulbasia
13.35
28.43
8
Chedra/Charra
1.54
0
121.29
130.22
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bridge and Culvert
0.55
0.46
2
Conveyor, Silo etc
2.28
11.12
3
Road
3.46
2.35
4
Railway Line and its embankment
115
33.33
5
CHP & Ground Bunkers
0
82.96
Total
121.29
130.22
C.
Maps of forest land proposed to be diverted
Division 1. : Chatra South
(i). Area of forest land proposed to be diverted(in ha.) :
17.01
(ii).Shape of forest land proposed to be diverted :
Linear
(b). No. of Segments :
One
Segments wise details
Segmenst
Segment Area(in ha.)
Kml File of Segments
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
17.01
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 2. : Latehar
(i). Area of forest land proposed to be diverted(in ha.) :
104.28
(ii).Shape of forest land proposed to be diverted :
Linear
(b). No. of Segments :
One
Segments wise details
Segmenst
Segment Area(in ha.)
Kml File of Segments
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
104.28
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
300
(iii). Temporary Employment(Number of person-days):
4725000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
Yes
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
NIL
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
NIL
(iii) . Reason for not providing Non-Forest Land:
NIL
Additional information Details
Documents
S.No
Documents
Remarks
1
NOC of GMJJ Land
2
Tree Enumeration of Magadh Railway Siding Chatra Division
3
Cadastral Map Chatra Division
4
Annexure 4 List of proposals submitted in Past and Offline Part-1 Form A
5
Reply of EDS raised vide no 2107 dated 23 10 2024
6
Reply of EDS raised vide letter no 218 dated 28.01.2025 from DFO Chatra South
7
Revised Online Form A Part 1
8
Reply of EDS raised vide letter no 558 dated 23.04.2024 from DFO Latehar
9
CA Land Chatra Part Cadastral DGPS and Toposheet
10
Annexure-7 Layout Land Use and Length and Width of Magadh Railway Siding
11
Checklist No-07 Statement showing details of Forest Area proposed in Chatra South Division
12
Authenticated Land Schedule of Magadh Railway Siding Laterhar Part
13
Authenticated Land Schedule of Magadh Railway Siding Chatra Part
14
Reply of EDS raised vide letter no 303 dated 13.02.2024 in respect of forest diversion from DFO Chatra South
15
Reply of EDS raised vide letter no 461 dated 21.09.2024 in respect of forest diversion of Magadh Railway Siding
16
Annexure-1 Authorization Letter
17
Annexure-2 Acknowledgment Slip
18
Annexure-3 Check list for Magadh Railway Siding Latehar Division Part as per JH Forest Dept. guidelines.
19
Annexure-5 Detailed Note for Magadh Railway Siding
20
Annexure-6 DGPS and Toposheet Latehar Portion
21
Annexure-8 Checklist No-07 Details of Forest Land in Latehar Division
22
Annexure-9 Statement of Non-Forest Land Latehar Division
23
Annexure-10 Undertaking of No Alternative Suitable Non-Forest Land
24
Annexure-11 Justification of Project Location
25
Annexure-12 Minimum Use of Forest Land Latehar Division
26
Annexure-13 Undertaking for Payment of CA Latehar Division
27
Annexure-14 Undertaking for Payment of Net Present Value Latehar Division
28
Annexure-15 Undertaking for FRA
29
Annexure-16 Tree Enumuration Latehar Division Magadh Railway Siding
30
Annexure-18 CA Land Latehar Part Cadastral DGPS Toposheet
31
Annexure-21 Undertaking for obtaining NOC from State Pollution Control Board
32
Annexure-22 Undertaking for Catchment Area Treatment Plan
33
Annexure-23 Cost Benefit Analysis Report
34
Annexure-24 Land Acquisition Details
35
Annexure-25 Certificate in Prapatra I and II for Magadh Railway Siding
36
Annexure-26 Alternate Route Analysis
37
Annexure-27 Undertaking Regarding Land Details
38
Annexure-28 Undertaking for Change in Condition
39
Annexure-29 Justification for Modification of Proposal
40
Annexure-30 Undertaking for Archaeological Structure
41
Annexure-31 Undertaking For Ecological Sensitive Area
42
Annexure-32 Undertaking for Wild Life Management Plan
43
Annexure-33 Undertaking for Transportation Network
44
Annexure-34 DPR Magadh Railway Siding
45
Annexure-35 Cadastral Map CS Magadh Railway Siding Latehar
46
Annexure-36 Cadastral Map RS Magadh Railway Siding Latehar
47
Check List No-11 Minimum Use of Forest Land Chatra Division
48
Check List No-12 Undertaking for Payment of CA Chatra Division
49
Check List No-13 Undertaking for Payment of Net Present Value Chatra Division
50
Checklist of Magadh Railway Siding as per JH Forest Dept. guidelines Chatra Division
51
DGPS and Toposheet Magadh Railway Siding Chatra Division